At present, the construction of the third bid section is as follows: the base course (including ceiling, wall and ground) of the 8th, 9th, 10th, 11th and 20th floors has been basically completed, and the surface course construction of the 18th floor sample room has been completed. This quality control plan is based on the surface construction process of the 8th, 9th, 10th, 11th and 20th floors of the third bid section in the later stage, combined with the design drawings, relevant specifications and standards