Review the power use organization design of the construction unit. Review content: site survey, determine the location and route of power incoming lines, distribution rooms, distribution devices, and electrical equipment. Calculate the load, select the design of transformers, conductors, electrical appliances and grounding devices, review the electrogram of temporary electricity and protective measures.