Description This operation instruction is applicable to the blowdown, sampling, water drainage, venting, dosing, steam exhaust, soot blowing, emergency water drainage, recirculation and other pipelines of 2 * 135MW project boiler, as well as the auxiliary equipment and pipelines such as water level gauge, safety valve, regular blowdown flash tank and continuous blowdown flash tank. Including: preparation basis, project overview and main quantities, qualification requirements for operators