The excavation depth of deep foundation pit of the project is 7.2m, which adopts the method of excavation in sections and layers, and is supported by soil nailed walls. There are four rows of soil nailed walls, with vertical spacing of 1.5m, horizontal spacing of 1.2m, and lengths of 6m, 9m, 9m, and 6m respectively. The stratum is Quaternary Holocene alluvium (Q4al), mainly composed of silty clay, silt and silty fine sand. Dewatering is required during construction.