K135+199.445 separate overpass is located in Yuncheng Interchange Area, crossing 338 Provincial Highway, with an intersection angle of 90 °, a span of 22-28-22m, and a total length of 72m. The bridge foundation is made of 30 bored piles. The diameter of the abutment bored pile is 1.2m, the length is 38m, the diameter of the pier bored pile is 1.5m, the length of the right bored pile is 47m, and the length of the left bored pile is 38m