The special construction scheme for embankment foundation treatment is to remove the obstacles within the red line, remove the unqualified soil, sundries, sludge on the surface, and drain the original surface water. Before removing the sludge, the depth and nature of the sludge shall be explored, and safety technical measures shall be taken. The depth of foundation clearing shall not be less than 0.3m, and the removed spoil, sundries, waste residue, etc. shall be transported to the designated site for stacking. The topsoil of the existing embankment must be removed