4.1.1 Before commencement, read the design and construction drawings, design instructions, product lists, construction procedures, construction technical requirements, and project quality inspection system, and have the necessary technical documents such as system drawings, equipment layout plans, wiring diagrams, installation drawings, and fire equipment linkage logic descriptions. 4.1.2 Preparation of electrical systems before commencement Construction during construction (including concealed