This data is the construction organization plan of sewage pipeline, including the construction of construction survey engineering test pipeline construction, etc., which can be downloaded for reference by netizens.
The drainage ditch in Xxxxx section is a rainwater pipeline of rubble masonry drainage ditch.It is now changed to reinforced concrete pipe.Xxxxx section 1 project starts from xx bridge to xx handbag factory in the east.The total length is 700 meters.The pipeline range is from K0+000 to K0+700.The total length of the pipeline is 1418 linear meters, including 1205 linear meters of Dn1000 sewage pipeline.Dn
1. This project is mainly aimed at the construction of sewage branch pipe network, rainwater system transformation, building drainage riser transformation, part of road pavement restoration and pipeline desilting in XX, XX and XX communities. The specific project contents are as follows: 1. XX communities lay 10956m DN300-1500 excavated pipes, DN1000 pipe jacking 2
XX sewage intercepting main pipe project, the total length of the traction pipe is 3560 M, the pipe diameter is DN700, DN600, DN500, DN400, and the pipe material is HDPE hollow wall winding reinforced pipe. According to the actual situation of the site, the underground distribution of the construction section is very complex, and the soil is mainly flowing plastic sludge and sand
Construction Scheme of Sewage Pipeline Traction Method for Island Sewage Interceptor Project in Humen Town, Dongguan Construction Scheme of Sewage Pipeline Traction Method for Island Sewage Interceptor Project in Humen Town, Dongguan Construction Scheme of Sewage Pipeline Traction Method for Island Sewage Interceptor Project in Humen Town, Dongguan Construction Scheme of Sewage Pipeline Traction Method for Island Sewage Interceptor Project in Humen Town, Dongguan Construction Scheme of Sewage Pipeline Traction Method for Island Sewage Interceptor Project in Humen Town, Dongguan
Thermal pipeline insulation construction scheme Thermal pipeline insulation construction scheme Thermal pipeline insulation construction scheme Thermal pipeline insulation construction scheme Thermal pipeline insulation construction scheme Thermal pipeline insulation construction scheme
The asphalt for cold primer oil in this project is No. 30 A construction petroleum asphalt.Before boiling, cut the asphalt into small pieces of less than 1.5kg, put them into a clean asphalt pan, gradually raise the temperature and mix them, and keep the temperature within 180~200 ℃ (the maximum temperature shall not exceed 220 ℃). Generally, it should be boiled at this temperature for 1.5~2.5 hours until
The design starting point of the pipeline is the outlet pipe of Daniudi lift pump station, and the design ending point of the pipeline is the Turk artificial lake on the south side of the Turk Industrial Park. The total design length is about 23.4km (the actual length is subject to the as built drawing). The design pipe diameter is DN1000mm. The pipes are mainly ductile iron pipes, K9 grade, T-shaped rubber ring joints, and the working pressure is 0.6MPa;Welding steel is used instead of local complex terrain
Hongyue Pipeline Dredging and Cleaning Service Co., Ltd. is a comprehensive cleaning enterprise engaged in pipeline dredging, municipal pipeline dredging, drainage and sewage pipeline dredging, pipeline maintenance, pipeline high-pressure cleaning, and river dredging.
The terrain along the pipeline is relatively flat, the soil quality is general, and the groundwater level is high. At the same time, it needs to cross several rivers and culverts, and some sections need foundation treatment.In order to speed up the construction and ensure the quality of the project, the construction method of human-computer integration is adopted in the project. Mechanized construction is adopted along the line where the site and other conditions are available. Manual operation is adopted in complex and narrow sections
The special topic of sewage pipeline construction scheme provides you with the sharing of documents related to the sewage pipeline construction scheme. You can download the documents related to the sewage pipeline construction scheme for learning and reference. For more contents related to the sewage pipeline construction scheme, please visit