The hoisting contents of the project mainly include the hoisting of PCCP pipes in the trench, pipe jacking hoisting of two high-speed approaches and the hoisting of inverted siphon pipes crossing the New Ku River. The maximum depth of the pipe jacking is 9.6 meters, the pipe diameter is DN3000, it is a reinforced concrete pipe, the wall thickness is 290mm, each section is 3 meters, and it is lined with steel pipes, the pipe diameter is 2400mm, and it is Q235B steel. The rest are PCs