1、 Project overview Commissioning of the fire weak current system of the project includes: automatic fire alarm system (controller alarm, passive alarm), linkage control system (fire hydrant, sprinkler, air supply and smoke exhaust, fire shutter, elevator forced landing, current switching), fire accident broadcast, fire communication intercom, etc. The fire control system of the project is located in the fire control center on the first floor. The fire control center can