According to the plan, water supply system diagram, kitchen and toilet layout, check whether various pipelines and coordinates, elevations are crossed, and the space used for pipeline arrangement is reasonable, determine the location and direction of the pipeline, and then assign a special person to be responsible for the implementation of trough pressing when pouring concrete for civil structures. Straight pipes shall be used for structural groove pressing. According to the size of the construction drawing, when the concrete has not completely set