The construction content of the third section of dredging construction of Hudai Town's river environment comprehensive improvement project (Zhihugang water system) includes Longyan River, Wangdianqiao River, Qianjia River, Xiachang River, Dianxi Huanbang, Yaoxiang River, Xixiang River, Panguizhuang River, Xitou River, Dongsheng River, Xiangtou Bank, Louxia River, Houwu River), and the main content includes: river dredging, obstacle clearing along the line, etc.