In this paper, the preparation before construction, embedded iron parts, measurement, drawing of measurement results, installation of connectors, vertical beam positioning and setting out, adapter installation, primer spraying, vertical beam installation, vertical beam correction and acceptance, beam reinforcement and secondary anti-corrosion, vertical beam protective film packaging, floor height and beam measurement, positioning and setting out, beam corner code positioning and drilling Beam installation and fire prevention