1.1 Preparation of machines and tools: ground pump, distributor, bucket, immersion vibrator, white line, scraping bar, wood trowel, ruler, pointed shovel, flat shovel, etc. 1.2 Operation conditions: 1.2.1 The formwork, reinforcement, embedded parts, pipelines, etc. of the poured concrete layer have been installed, inspected to meet the design requirements and specifications, and the concealed and concealed inspection procedures have been completed. 1.2.2 Before pouring