There are 9 large and medium bridges in the contract section, with a total length of 1320m, including 6 large bridges and 3 medium bridges. The superstructure adopts prefabricated prestressed concrete box continuous beam, with a single span of 30m and a total of 44 spans. The pier column adopts column pier, and the foundation adopts pile foundation and reinforced concrete expanded foundation, including Xiaoshan Bridge, No. 1 and No. 2 Bridges of Zhaojia Reservoir, Wujiayuehe River Bridge, and Liu