According to the construction scheme for the demolition of old rural houses, (l) the project uses manual tools to manually demolish buildings. The construction procedure should be from top to bottom, and the demolition should be carried out in layers, in accordance with the principle of non bearing structure before bearing structure. (2) Overhanging components, such as eaves, balconies, canopies and external stairs, which are easy to lose stability during demolition construction, shall be demolished first. (3) Demolition of frame structure buildings,