According to the arrangement, the project needs to go through a winter. Due to the large amount of work, it must be constructed in winter. Although the winter temperature in Shanghai is rising year by year, it is not stable, but there are still low temperatures and cold currents. Therefore, when the minimum temperature is lower than+5 ℃, it should be taken as winter construction, and appropriate measures should be taken. 1. During mixing, warm the mixing water