The Tianjin Xingjiang Intercity Railway was opened on December 18, and the fastest distance from Tianjin West to Daxing Airport Station is 41 minutes

Date: 2023-12-18 08:54      Source: Beijing Daily

Share:
Font size: large    in    Small

Original title: Tianjin Xingtai Intercity Railway opened today, and the fastest time to reach the Daxing Airport Station is 41 minutes

According to China National Railway Group Co., Ltd. (hereinafter referred to as the National Railway Group), the Tianjin Beijing Daxing International Airport Railway (hereinafter referred to as the Jinxing Intercity Railway) was officially put into operation on December 18, and the shortest distance between Tianjin West and Daxing Airport Station is 41 minutes. Tianjin Xingjiang Intercity Railway has become another high-speed railway connecting Beijing and Tianjin after Beijing Tianjin Intercity Railway, Beijing Shanghai High speed Railway, Beijing Tangshan Beijing Binhai Intercity Railway.

The Tianjin Xingjiang Intercity Railway starts from Tianjin West Railway Station, passes through Hongqiao District of Tianjin, Langfang City of Hebei Province, and Daxing District of Beijing, and connects to Daxing Airport Station. The total length of the line is 101 kilometers. The Shengfang Gu'an East Section, 47 kilometers long, is a new line with a design speed of 250 kilometers per hour. There are 6 stations along the line, including Tianjin West Station, Shengfang Station, Anci Station, Yongqing East Station, Gu'an East Station and Daxing Airport Station, of which Anci Station and Yongqing East Station are new stations.

Before the project is put into operation, the State Railway Group has conducted joint commissioning, testing, acceptance and safety assessment on the professional equipment of Tianjin Xingjiang Intercity Railway, and comprehensively optimized and adjusted the track status, pantograph catenary performance, train control, communication signal system, etc. At present, the line meets the requirements of safe and stable operation of high-speed railway, and is ready for operation.

The maximum speed of Tianjin Xingjiang Intercity Railway is 250 kilometers per hour. At the initial stage of operation, the railway department arranges 8 multiple unit trains to run every day. From Tianjin West Station to Anci, Yongqing East, and Daxing Airport Station, the fastest speed is 24 minutes, 29 minutes, and 41 minutes respectively; Four cross track multiple unit trains are arranged to run, and Tianjin West Railway Station and Tangshan Railway Station are the first to run multiple unit trains to Xiong'an Station via Jinxing Intercity Railway.

After the adjustment of train operation diagram in the first quarter of 2024, the railway department will arrange to operate up to 18 multiple unit trains every day, and will further optimize and improve the train operation scheme according to the passenger flow demand.

In order to improve the operation quality and meet the different travel needs of passengers, the railway department implements a flexible discount and differentiated market-oriented fare mechanism between the stations of the project to provide more options for passenger travel. The specific fare can be queried through Railway 12306.

Tianjin Xingjiang Intercity Railway is an important project to implement the coordinated development strategy of Beijing, Tianjin and Hebei. After the project is put into operation, four high-speed railway channels will be formed between Beijing and Tianjin, which will further improve the layout of the regional railway network, facilitate the travel of people along the line, and promote the integrated development of Beijing Tianjin Hebei transportation. It is of great significance to sing the "tale of two cities" of Beijing and Tianjin, create a regional development highland, and promote the coordinated development of Beijing Tianjin Hebei. (Sun Hongyang)

The link you visited is about to leave the "Window of the Capital" portal Do you want to continue?

 Archived