Introduction to Hongshui River Magazine
Hongshui River magazine vigorously publicizes the party's and the country's hydropower construction policies, promotes the development of Hongshui River's rich hydropower resources, timely and deeply summarizes and spreads the experience of Hongshui River's hydropower development and construction, absorbs, introduces and promotes domestic and foreign hydropower science and technology and research achievements, actively carries out hydropower theory discussions, and discusses key problems and solutions in hydropower construction, Serve to improve the technical level of scientific and technological personnel. The readers of the journal are mainly: managers at all levels and engineering technicians engaged in water conservancy and electric power work, teachers and students of colleges and secondary schools.
Column setting of Hongshui River magazine
The main columns of this journal include "Hydropower Planning and Kinetic Energy Economy", "Engineering Geology and Survey", "Hydraulic Design and Construction", "Electromechanical Equipment and Metal Structure", "Hydropower Station Operation", "Experimental Research", "Environmental Monitoring and Environmental Assessment", "Reservoir Resettlement", "Computer Application", etc. The contents involve the research of key technologies for high dam construction and the rapid construction technology for high dams Research, application and experience exchange of new theories, new technologies, new methods, new materials, new processes and new electromechanical equipment for the construction of medium-sized hydropower stations.
Honorary Information of Hongshui River Magazine
Subscription mode of Hongshui River magazine
Address: No. 10, Jianzheng Road, Nanning, Guangxi 530023.
Notice for Contribution of Hongshuihe Magazine
1. The manuscript should be clear in argument, reliable in argument, accurate in number and concise in text. Please provide references for references. The contents of the manuscript should be kept confidential. Generally, the number of contributions should not exceed 6000 words; The title should be concise and accurate, and generally controlled within 20 words. Please attach 3 to 8 Chinese and English keywords and a Chinese and English abstract of less than 200 words (the abstract is an independent short article without notes and comments, which should be written in the third person. The main content should include "purpose, method, results, conclusions", with emphasis on the results and conclusions); English title, key words, abstract, the translation of the author's unit, and the Chinese phonetic alphabet of the author's name are attached.
2 The manuscript shall be printed on 16 sheet paper and sent by e-mail. The simplified words shall be subject to the General Table of Simplified Words promulgated by the State Council in October 1986. The numbers shall be written in accordance with the national standard Regulations on the Use of Numbers in Publications (GB / 1r15835-1995). The unit and symbol of quantity must use the legal unit of measurement. The foreign language shall be written in printed form, and distinguish between upper case and lower case and italics. All quantity symbols are in italics, and unit symbols are in regular font. The diagrams attached to the text shall be concise and clear, and the number of attached drawings shall not exceed 5 generally. The attached drawings shall be reasonably arranged and the words shall be clear and legible.
3 If the content of the manuscript involves national science and technology research projects, NSFC funded projects or provincial or ministerial funded projects, please note at the bottom of the page and list the project name and number.
4. When excerpting or quoting other people's works in the manuscript, please specify the name of the original author, the name of the work and its source according to the relevant provisions of the Copyright Law, and write them in the reference list. Only the main references should be included, and the unpublished materials should not be quoted. The description format of references shall adopt the sequence coding system recommended by the national standard "Rules for the Description of Bibliographic References" (GB7714_87), and the writing format is as follows (no missing items): a monograph [M], collection of papers [C], dissertation [D], report [R] [serial number], main responsible person, title [M], place of publication: publisher, year of publication, starting and ending page numbers (optional), b journal article [serial number] Main responsible person. Document title [J]. Publication name, year, volume (issue): start and end page numbers. The main responsible person of the extracted literature [serial number] in the paper collection. The extracted literature title [A]. Original title [C]. Place of publication: publisher, year of publication. Start and end page numbers of the extracted literature. d International and national standard [serial number] standard number, standard name [S]
5 Please list the brief introduction of the main author according to the following example: "Wang Xiaohai (first in 1962), male (Manchu nationality), from Nanjing, Jiangsu Province, senior engineer, bachelor's degree (note the highest degree), mainly engaged in seismic research of hydraulic structures, e-mail or contact number."
6 Please keep your own copy of the manuscript, and do not submit more than one manuscript. No matter whether it is published or not, the manuscript will not be returned. If you have not received the employment notice from the editorial department of this magazine after three months, please handle it yourself.
7 Please indicate the author's "detailed mailing address, zip code, telephone number and e-mail address" for contact.
Example of Hongshui River Magazine
Practice and consideration of dam maintenance and reinforcement of hydropower station
Structural Layout and Stability Stress Analysis of Intake Tower of Baise Hydropower Station
Research on dry transport scheme of portal crane for navigation building of Zuojiang Water Control Project
Construction of Shatanjiang Embankment Sluice Pile Foundation
Restudy on the Type of Navigation Structure of Dahua Hydropower Station
Instrument selection for dam safety monitoring automation
Research on deep anti sliding stability of gravity dam based on three-dimensional finite element ABAQUS software
Experimental Study on Alkali Carbonate Reactivity of Aggregate for Lechangxia Water Control Project
Research on ice melting scheme of line load
Research on Treatment of Governor Guide Vane and Paddle Control Failure in Dahua Hydropower Plant
Application of D-S evidence theory in dam safety monitoring
Application of optimal subset regression in rock mass classification
Practice and Discussion on the Management Mode of "Multi party Coordination and Seamless Handover"
Three dimensional nonlinear finite element analysis of a concrete arch dam
Study on the Merger and Acquisition of Hydropower Projects
Simple Calculation of Jumper Sag and Electrical Clearance of Transmission Line
Optimization of generator transformer relay protection reconstruction for Yantan Hydropower Station