On May 13, 2024, State Power Investment (Shanxi Qinshui) New Energy Power Generation Co., Ltd. was fined 1.1298 million yuan by Qinshui County Natural Resources Bureau for occupying land without authorization.
According to the content of the announcement, the State Power Investment (Shanxi Qinshui) New Energy Power Generation Co., Ltd. will be punished for its unauthorized occupation of 11298 square meters of land in Hebei Village, Shili Township to build a photovoltaic booster station from August 2022 without the approval of the natural resources department.
State Power Investment (Shanxi Qinshui) New Energy Power Generation Co., Ltd. violated the provisions of Article 2 and Article 44 of the Land Administration Law of the People's Republic of China, constituting violations of land occupation.Two penalties shall be imposed on them. One is to order them to return the illegally occupied land and confiscate the newly built buildings and other facilities on the illegally occupied 11298 square meters of land;Second, the illegal occupation of 11298 square meters of land was fined at the standard of 100 yuan per square meter, with a fine of 1129800 yuan.
On December 13, 2021, the Qinshui 100MW ground concentrated photovoltaic project applied by the State Power Investment (Shanxi Qinshui) New Energy Power Generation Co., Ltd. passed the filing.The project is a municipal key project in Qinshui County in 2023.
The project is located in Shili Township, Guxian Township and Shizhuang Town, Qinshui County, Jincheng City. The main construction content is that the project has a capacity of 100MW. The project is divided into two parts: photovoltaic field area and booster station. The photovoltaic plant area covers an area of about 250 hectares. A total of 232960 540W double glass double sided single-crystal photovoltaic modules are installed, divided into 32 sub arrays,Each array is equipped with 14 sets of 225W series inverters and a 3.15MW booster box transformer, which will be sent to the booster station after boosting to 35kV;A new 220kV booster station will be built, covering an area of about 18 mu, supporting the construction of 10MW/20MWh energy storage, and will be connected to the national grid through the 220kV transmission line (the specific reply to the access system shall prevail).The total investment of the project is 489124300 yuan.
On April 6, 2022, Qinshui County Energy Bureau gave suggestions on the site selection of the transmission line of the State Power Investment Qinshui 100MW ground concentrated photovoltaic project.The opinion shows that the Qinshui 100MW project of State Power Investment Corporation of China will be connected to Yuanshang 220KV substation overhead from the 220KV booster station in the new photovoltaic plant area via the Hebei Village of Shili Township.