eighteen billion two hundred and thirty-two million six hundred and fifty-three thousand five hundred and fifty-five

Hot search:

Dacheng Shengyue Pipeline Engineering Company is mainly engaged in trenchless pipe jacking engineering, professional pipe jacking construction, road pipe jacking construction, pipe jacking construction team, manual pipe jacking construction, pipe jacking engineering team, etc. Mainly engaged in pipe jacking construction in Nanning, Gansu, Nanning and other regions. Our engineering team is looking forward to working with colleagues in the telecommunications, power, sewage and other treatment work laid by the * * underground pipe network for mutual benefit and win-win results.

    Shantou Trenchless Pipe Jacking Team Telephone Pipe Jacking Project_ Strong Technical Team

    Delivery address: Dacheng County, Langfang, Hebei Province
    Product quantity: 9999.00 meters
    Price: Negotiate in person
    Design construction period Telephone consultation Total height of construction frame Can be customized according to customer requirements Construction description Pipe jacking construction, pipe jacking, trenchless drilling rig construction, pipeline engineering, pipeline construction, jacking pipe construction, horizontal directional drilling rig construction, pipe jacking construction scheme, pipe jacking Victory over Construction method Site construction
    The operator of trenchless pipe jacking works should also obey the guidance of the guide, which is very dangerous. Pay attention to the indicators of the instrument panel during operation, and stop the operation in case of any abnormality. Before starting work, we should check the machine to ensure that it can run safely. Check the machine.
    Foundation exploration during trenchless pipe jacking project crossing buildings When pipe jacking is constructed under the building foundation, it is necessary to clarify the type of foundation encountered on the construction route. For some foundation pipes, underpinning and reinforcement measures can be taken before jacking.
     Shantou Trenchless Pipe Jacking Team Tel
    Jacking calculation of trenchless pipe jacking engineering. The first part of jacking calculation includes accurate calculation of jacking thrust, selection of corresponding cylinder type and determination of relay distribution according to the calculation results; The second is the design of the working shaft. According to the calculated jacking force, the reinforcement scheme of the working shaft is proposed.
     Shantou Trenchless Pipe Jacking Team Tel
    Exploring underground pipelines before trenchless pipe jacking works Although the pipe jacking equipment has the ability to detect pipelines that are not far away from the forward route during construction, it is still worthwhile to identify underground pipelines on the ground in advance, which is still necessary for the safe operation of other pipelines such as communication, power, water supply, drainage, gas, and to ensure the normal life of the public.
     Shantou Trenchless Pipe Jacking Team Tel
    Detection and protection of toxic gas in trenchless pipe jacking works The stratum of pipe jacking construction will generally pass through the sludge layer, and decaying animals and plants will form toxic gas aggregates underground, which will endanger the health and life of construction personnel. Therefore, when personnel are operating in pipe jacking, it is necessary to regularly monitor the content of toxic gas in the pipe and use ventilation devices to solve the problem.
    The company has a group of experienced project management personnel and technicians. It is also equipped with construction machinery and equipment with excellent performance. It is required to carry out safe and civilized construction in strict accordance with relevant national construction standards, and the project quality is qualified and excellent.
    http://shengyueguandao.cn.b2b168.com