1. Nanjing Metro Line 10, the first river crossing line of Nanjing Metro, was officially put into operation on July 1, 2014, with the logo color of champagne.
2. Phase I of Metro Line 10 passes through Pukou District, Jianye District and Yuhuatai District. The line starts from Yushan Road Station in Jiangbei New Area in the west, passes through Pukou New City, crosses the Yangtze River, enters Hexi New City, and ends at Andemen Station in the east.
3. The second phase project extending to Shiyang East Road Station was officially started in June 2020 and is planned to be completed and open to traffic in 2023.
4. The first phase of Metro Line 10 has a total length of 21.6 kilometers, including 19.5 kilometers of underground section, 2.1 kilometers of ground and elevated sections, and 3.6 kilometers of river crossing tunnels. It is the longest, deepest, highest water pressure, and largest diameter subway river crossing tunnel in China; There are 14 stations in total, including 13 underground stations and 1 elevated station; The trains are 6-car A-type trains with a maximum operating speed of 80 km/h, and are jointly manufactured by CRRC Nanjing Puzhen Rolling Stock Co., Ltd. and Alstom.
5. As of December 2020, the daily average passenger flow of Nanjing Metro Line 10 is 200000 person times.
6. The 248000 person times on November 1, 2019 is the highest daily passenger volume of Metro Line 10.