Do you need as built drawings to organize completion acceptance? Or is it needed for filing or settlement?

home page

Do you need as built drawings to organize completion acceptance? Or is it needed for filing or settlement?


        

Submit answer
Favorable reply
  • 2024-06-12 16:01:40

    Do you need as built drawings to organize completion acceptance? Or is it needed for filing or settlement?
    As built drawings are required for settlement. According to the Regulations on the Quality Management of Construction Projects, the archives to be submitted by the construction unit, the construction unit shall timely collect and sort out the documents and data of all links of the construction project in strict accordance with the relevant national regulations on archives management, establish and improve the archives of the construction project, and after the completion acceptance of the construction project, Timely transfer the construction project archives to the construction administrative department or other relevant departments. The construction unit shall prepare a unified catalog according to the filing requirements. If there are professional subcontracted projects, the subcontractor shall sort out all data according to the general arrangement of the general contractor, and then the general contractor shall review and summarize them. The archives that the construction unit should generally submit are: engineering technical archives; Project quality assurance data; Engineering inspection and evaluation data; As built drawings, etc. Legal conditions for completion acceptance The Construction Law stipulates that construction projects delivered for completion acceptance must meet the specified quality standards for construction projects, have complete engineering technical and economic data, signed engineering warranty, and meet other completion conditions specified by the state. The completed construction project can be delivered for use only after passing the acceptance; Those that have not passed the acceptance or have not passed the acceptance shall not be delivered for use. The Regulations on the Quality Management of Construction Projects further stipulates that the completion acceptance of construction projects shall meet the following conditions: 1. Complete the design of construction projects and the contents agreed in the contract; 2. Complete technical files and construction management data; 3. There are mobilization test reports of main building materials, building components (fittings) and equipment used in the project; 4. There are quality qualification documents signed by survey, design, construction, engineering supervision and other units; 5. Project warranty signed by the construction unit. The construction project can be delivered for use only after passing the acceptance. Is there anything you don't understand?

    M***

    2024-06-12 16:01:40

Related recommendations

Loading
Latest Q&A Recommendation Hot topics Hot spot recommendation
  • 1-20
  • 21-40
  • 41-60
  • 61-80
  • 81-100
  • 101-120
  • 121-140
  • 141-160
  • 161-180
  • 181-200
  • 1-20
  • 21-40
  • 41-60
  • 61-80
  • 81-100
  • 101-120
  • 121-140
  • 141-160
  • 161-180
  • 181-200
  • 1-20
  • 21-40
  • 41-60
  • 61-80
  • 81-100
  • 101-120
  • 121-140
  • 141-160
  • 161-180
  • 181-200
  • 1-20
  • 21-40
  • 41-60
  • 61-80
  • 81-100
  • 101-120
  • 121-140
  • 141-160
  • 161-180
  • 181-200
return
Top
help opinion
feedback

Confirm to report this problem

Reason for reporting (required):