Ordos 911 polyurethane Waterproof coating
erdos Waterproof and plugging Which one is good? Ordos Huaxia Yu waterproof True expert
Why doesn't the bathroom leak after the waterproof test? It has been 16 years since professional toilet waterproofing and leak stoppage works were carried out. No brick pulling and grouting.
The colleague is involved, and the explanation is endless. For details, please call the Store
Get samples for free, and your waterproof is up to you.
Hua Xiayu kitchen and toilet No brick smashing in bath Waterproof agent ,** mortar 。
(Invention patent No.: 201310511829.3)
1、 Product performance:
The kitchen and bathroom non brick smashing waterproof agent includes permeable component A and crystalline component B. The main functions of component A are: * *, cleaning greasy dirt and Floor tile lower cement The leakage channel of the gap in the structure is conducive to the passage of crystalline B component; Secondly, the soluble ions in the cement structure are activated to promote the secondary hydration reaction of cement. The function of crystalline component B is: * *, which will polymerize with permeable component A and become an impermeable colloid and crystal Mixture; Secondly, the secondary hydration reaction with the dormant soluble components of the cement produces water-insoluble crystals, which completely blocks the capillary pores and pores of the cement structure and the water leakage channel to achieve * * waterproof. Components A and B of the product and the product after reaction are non-toxic, harmless, odorless and environmentally friendly substances, which will not cause indoor environmental pollution.
The technical indicators of the waterproof agent for kitchen and bathroom tiles shall meet the QBYG-001-2013 standard.
2、 * * Applicable parts:
Kitchen and bathroom floor works (balcony, kitchen, toilet, bathroom, commercial bath center) with water leakage after laying floor tiles: after the house is decorated, kitchen and bathroom leaks again. According to the traditional maintenance method, the floor tiles are smashed to make waterproof again, and then the floor tiles are paved. It takes 5-7 days before and after users can use them normally, The noise and garbage removal during the construction period seriously disturb the normal life of the neighbors and cost a lot. The kitchen and bathroom non brick smashing waterproof agent, with its extremely strong penetration ability, can intelligently track and find the leakage channel, penetrate into the cavity gap under the floor tile, and form a gel like solid through polymerization reaction, completely blocking the leakage channel. Since the waterproof agent contains efficient cleaning agent, the ground after construction is not only free from any damage, but also more fresh and bright. The construction cost is less than half of the "brick smashing waterproof maintenance method", and there is no noise, dust and other pollution during the construction process.
3、 Usage:
1. Remove and clean the loose oil sludge and other dirt in the floor tile joints with a batch knife or wallpaper knife.
2. Use a plastic bag to wrap a rag to block the floor leak, dilute the kitchen and bathroom non brick smashing waterproof agent into component A with three times of clear water, and pour it on the floor tile. Use a broom to sweep from the low to the high for three hours to make the waterproof agent evenly leak into the floor tile seam (if the waterproof agent leaks out within three hours, immediately proceed to the next process).
3. Drain the residual waterproof agent penetrating component A from the floor drain, clean the floor with a mop at least three times, ensure that it is fully clean, and re block the floor drain; Dilute the crystalline component B of waterproof agent with 3 times of clear water and pour it on the floor tile. Sweep it from the low to the high with a broom for 3 hours to make the waterproof agent leak into the floor tile seam evenly and fully (if the leakage is completed within 3 hours, the next process shall be carried out immediately).
4. Drain the residual crystalline component B of waterproof agent from the floor drain, and clean the floor with mop at least three times to ensure that it is fully clean, and the construction is completed.
4、 Precautions:
1. The toilet floor shall not be watered at least 3 days before the waterproof construction, to ensure that the original seeping water under the floor tile is reduced as much as possible, which is conducive to the downward full penetration of the kitchen and bathroom waterproof agent without brick smashing.
2. Because the waterproof agent under the urinal can not reach effectively and there is a potential leakage hazard, the urinal must be removed for special inspection and treatment before the construction of waterproof agent;
3. After the construction of waterproof agent, check the interior of the floor drain. If there is any leakage hole or gap, repair it with instant plugging agent;
4. After the construction of waterproof agent, the wall corner gap at the junction of the facade wall and the ground shall be repaired with instant plugging agent, because the waterproof agent is not easy to penetrate horizontally;
5. The kitchen and bathroom can be put into use immediately after the completion of the construction, but it is allowed to take a bath after 3 days, and the accumulated water in the ground bath must be drained in time. If the water storage test with pressure is conducted, it must be conducted after 7 days;
6. If the waterproof agent is accidentally splashed into the eyes during construction, immediately flush with plenty of water or ask a doctor for treatment.
5、 Storage, transportation and shelf life:
The waterproof agent for kitchen and bathroom should be sealed and stored in a cool, dry place and a place that is not easy for children to touch. Prevent rain, exposure and package damage during storage and transportation; The shelf life is 36 months under the ambient temperature of 5~25 ℃ for storage and transportation.