After tiling:
Water and electricity transformation: change the water and electricity to be changed at one time;
Tiler mobilization: when paving the floor tiles, it is necessary to wait for the floor to dry before carpentry;
Carpenter mobilization: including door jambs, window jambs and furniture. The purchased door jambs can be pressed before the oil workers enter the site;
Oilman mobilization: spray varnish or polyester paint, prime coat twice, polish, finish coat at least twice based on the surface smoothness, latex paint, remove the ordinary grey skin of the original wall, seal the bottom with interface agent or latex liquid once, coat powder three times, polish, then brush latex paint three times, among which polish once;
Press the corner protector, which is easy to be bumped;
After moving the furniture, the oiler is painting the dirty places on the wall.