Water conservancy project drawing_water conservancy project picture
Download the drawings and data of hydraulic engineers, including complete sets of drawings and data of hydraulic projects, including flood control projects, farmland water conservancy, hydropower stations, waterway and port projects, water supply and drainage projects, environmental water conservancy, tideland reclamation, etc. Welcome to download
  • twenty-six thousand two hundred and ninety-four member
  • one thousand two hundred and thirty theme
  • one thousand nine hundred and eighty-five reply
  • zero degree of heat
  • zero Weekly heat
  • zero Monthly heat
  • zero Total heat

Learn more

Label retrieval

Retrieved one thousand two hundred and six Content

anonymous Published on June 12, 2016 3942 people browsing One person follows the post Grade:

This data is the construction drawing of the rural land consolidation demonstration construction project, including the typical plot layout plan, construction drawing of Dougou, nonggou, nongqu and Douqu sections, structural drawing of regulating gate and diversion gate, earthwork calculation drawing of the plot, construction drawing of pump station, construction drawing of production road section, construction drawing of field road section, culvert pipe structure drawing, etc. 55 sheets, edited

Latest reply: Hibiscus blossoms   2016-06-12  

anonymous Published on 2021-09-16 748 people browsing Two people follow the post Grade:

This data is: 2021+88p of 13800 mu high standard farmland construction project, in PDF format. 1、 Introduction: Overall scale of the project: the total area of the project area is 13800 mu, including 7700 mu of cultivated land. The main works of this project include: new (demolished) irrigation pump station, new anti-seepage channel, underground channel, control gate

Latest reply: iamdoyle   2022-06-21  

Fame Published on August 13, 2008 3768 people browsing 4 people follow the post Grade:

Design Drawing of Small River Underflow Interception Project

Latest reply: fifty-two trillion and one hundred and twenty-one billion two hundred and twelve million one hundred and twenty-one thousand two hundred and twelve   2022-06-10  

anonymous Published on June 17, 2015 2195 people browsing Two people follow the post Grade:

The water function category of the reservoir is not defined, and it is not a drinking water source. The incoming water is mainly rainwater. The main function of the reservoir is landscape. At present, the overall area of the reservoir is 20250m2, the average water depth is 2.5m, and the perimeter of the reservoir is 263.76m. In this design, the pipe network system mainly intercepts domestic sewage and rainwater around the reservoir. [Pipe network design]

Latest reply: CHENDUFUBIN   2022-04-19  

anonymous Published on January 19, 2016 1593 people browsing Three people follow the post Grade:

This data is the construction drawing of tunnel engineering, including 4 sheets in total, including the construction drawing of tunnel section, the longitudinal section of the entrance, the reinforcement drawing of tunnel lining and the anchor rod layout detail. The drawings are designed in place and neat, which has certain reference value. 4 sheets, prepared in 2014.

Latest reply: kuku_1979   2021-12-14  

Little Sunshine 366 Published on October 20, 2021-10 149 people browsing Two people follow the post Grade:

This data is the construction drawing of [Sichuan] River Water Damage Permanent Water Conservancy Facilities Restoration Project, in DWG format, including 49 cad drawings, with clear nodes, and similar projects can be downloaded for reference. 1、 Project overview: 1) Repair the water intake of the irrigation pumping station and remove the abandoned barrage; 2) 29 m of revetment retaining wall shall be repaired; 3) , mortar pebble retaining wall, 71m

Latest reply: Teacher Qing Pingping   2021-10-25  

anonymous Published on September 24, 2021 40 people browsing Two people follow the post Grade:

This data is: [Guangzhou] Frame Shear Wall Structure Teaching Building Water Supply and Drainage Construction Drawing 2020, in PDF format. 1、 Introduction: The project is located in Guangzhou, 12 floors above ground, reinforced concrete frame shear wall structure, with a structural height of 47.4m, and a rotary pile foundation. Including domestic water supply system, sewage system, rainwater drainage system II. Contents: water supply and drainage

Latest reply: Little Sunshine 366   2021-09-27  

anonymous Published on September 24, 2021 62 people browsing Two people follow the post Grade:

This data is: [Guangzhou] Fire water supply construction drawing 2020 of the teaching building with frame shear wall structure, in PDF format. 1、 Introduction: The project is located in Guangzhou, 12 floors above ground, reinforced concrete frame shear wall structure, with a structural height of 47.4m, and a rotary pile foundation. Including fire hydrant system, building fire extinguisher system, automatic sprinkler system, room

Latest reply: Little Sunshine 366   2021-09-27  

anonymous Published on September 24, 2021 80 people browsing One person follows the post Grade:

This data is the preliminary design and construction drawing 2020 of the river tail water discharge and water body comprehensive treatment project, in the format of CAD version. 1、 Introduction: This project is the tailwater discharge and water body comprehensive treatment project of the upstream sewage treatment plant. It is used to dredge and repair the upstream river channel (from the sewage plant to the flood diversion tunnel), as well as the sewage intercepting ditch

Latest reply: Gemini teacher   2021-09-26  

anonymous Published on 2021-09-06 63 people browsing Two people follow the post Grade:

This data is: drawings of weak current equipment of comprehensive transportation hub+bidding document control price 2020, in the format of CAD195 sheet+GYKZJ6+GYZB version. 1、 Introduction to building nature: traffic hub building, including supporting facilities and services, belongs to Class I high-rise building construction area: the total construction area of the project is about 143456 square meters, including 51007 square meters underground

Latest reply: jianhui0101   2021-09-26  

lqmtcb Published on 2014-02-11 5426 people browsing Three people follow the post Grade:

The typical design drawings of aqueducts for small farmland water conservancy projects include nine drawings, including typical design drawings of arch aqueducts, detailed structural drawings of aqueducts, and design drawings of rectangular aqueducts.

Latest reply: gaoanzhl   2021-09-24  

anonymous Published on 2021-09-16 710 people browsing One person follows the post Grade:

This data is: High standard farmland construction project 4000 mu 2021, in PDF format. 1、 Introduction: High standard farmland construction project covers an area of 4000 mu, including 150 mu of high-efficiency water-saving irrigation area, involving 1 administrative village (community). This project is the surplus fund project of the project. The main construction contents of the project include irrigation and drainage

Latest reply: Gemini teacher   2021-09-22  

Little Sunshine 366 Published on 2021-09-16 288 people browsing Two people follow the post Grade:

This data is the flood control engineering drawing 2021 of the downstream right bank section of the bridge in the format of CAD+word. 1、 The main construction contents of the flood control project on the right bank downstream of the bridge include river dredging project, embankment project and waterlogging control project. The project comprehensively governs the river length of 7.3 km, of which the right bank embankment construction project is 4.21 km (new embankment 3

Latest reply: Lan Xinxin, teacher   2021-09-18  

anonymous Published on 2021-09-16 357 people browsing Two people follow the post Grade:

This data is: [Jiangsu] High standard farmland bid submission project construction drawing contains bid document 2021, in PDF format, 118p in total, which was prepared in 2021, including bid submission project construction drawing design 118p+bidding document 68p. 1、 Project overview: this project is a high standard farmland project of xx Town in 2021. The construction of high standard farmland covers an area of 2000 mu. 1) Disassemble

Latest reply: Little Sunshine 366   2021-09-18  

stswzfq Published on June 12, 2015 4663 people browsing 4 people follow the post Grade:

The total length of water damage is about 60m. The Bingrid cage used in this project is 2000 × 1000 × 1000 (length × width × height), the mesh size is 80 × 115mm, the mesh is Ф 2.5mm, the edge wire is Ф 3.15mm, and the composite wire is Ф 2.2mm. The gabion shall be installed flush with the upstream side of the existing left dam section's original masonry anti-seepage wall. Before the installation of gabions, the foundation shall be

Latest reply: dzbjayjay   2021-09-15  

anonymous Published on 2021-09-07 122 people browsing One person follows the post Grade:

This data is: [Guizhou] drawings of the supporting and water-saving reconstruction project for the continuation of medium-sized irrigation areas (2020+60 sets), in CAD format. 1、 Brief Introduction The project is located in Guizhou. Drawing II of the supporting and water-saving reconstruction project of the medium-sized irrigation area. Contents: geographical location map, water system map, regional geological map, general layout plan, design drawing of submersible pump room

Latest reply: Gemini teacher   2021-09-07  

anonymous Published on 2021-09-06 187 people browsing One person follows the post Grade:

This data is: 7 sets of 2021 drawings of the Central Water Pollution Prevention and Control Project, in CAD version. 1、 Project name: Central Water Pollution Prevention and Control Project; Design scale: 198 sewage treatment stations will be built, with a sewage treatment scale of 198.5m3/d; Design scope: sewage collection pipe network to equipment drainage of 29 villagers' groups in 12 villages, 7 townships in the county is involved

Latest reply: Gemini teacher   2021-09-06  

anonymous Published on 2021-09-06 159 people browsing One person follows the post Grade:

This data is: drawings of black and odorous water body consolidation and upgrading project, bidding 2020, in the format of PDF105+CAD39. 1、 Brief Introduction: This project is the consolidation and improvement project of black and odorous water body - river basin pipe network construction project. The design is mainly aimed at the renovation of the big river. The project will build a new DN800 sewage pipe 270 m from the start of the big river to the high-speed DN300 sewage pipe 2065m

Latest reply: Gemini teacher   2021-09-06  

anonymous Published on 2021-09-03 284 people browsing One person follows the post Grade:

This data is: [Sichuan] Water Plant Engineering Construction Design Atlas 2021, in the format of word+CAD. 1、 Introduction Construction design drawings+electrical drawings+pipeline drawings The elevation of the water plant is 951.50m, and the water supply scale of the water plant is 1000m ³/d. The water supply scope of the project mainly includes 5 villages, and the water supply objects are mainly township residents and rural residents. The project

Latest reply: Gemini teacher   2021-09-03  

anonymous Published on 2021-09-03 174 people browsing One person follows the post Grade:

This data is: implementation plan+construction drawing 2019 of 18 villages' land improvement project, in the format of word+PDF+CAD. 1、 Introduction to the implementation scheme of land consolidation projects in 18 villages+construction drawings: land leveling works, irrigation and drainage works, road works II. Contents: implementation scheme of land consolidation projects, land consolidation project contracts, material prices

Latest reply: Gemini teacher   2021-09-03