Civil Engineering Online Forum \ building structure \ Structural construction drawing \ Application of Cable Stayed Bridge Construction Calculation

Application of Cable Stayed Bridge Construction Calculation

Published on: 2010-02-15 19:02:15 come from: building structure / Structural construction drawing [Copy and forward]
Application of Cable Stayed Bridge Construction Calculation

Statement: The content is uploaded by the user, and the copyright belongs to the original author. If infringement is involved, please Click here to contact , we will deal with it in time!

  •  cof1683431103572

    Thank you for sharing. I will study hard.

    2024-02-28 08:15:28

    reply report
    agree with zero
  •  yang007007
    Yes, I support the two upstairs.
    2010-02-24 07:22:24

    reply report
    agree with zero
Load more

Structural construction drawing

Back to section

575600 items · 1021 subscribers

Guess you like it

Read the next article

construction

Paper introduction: In the capping beam construction of reinforced concrete bridge construction, the traditional technology is to set up a full scaffold support system. This construction method not only wastes materials, but also consumes labor and time. If the suspended support method is used for construction, it will greatly save turnover materials and speed up the construction progress. The suspended support method is usually divided into two construction processes: steel bar support method and column hoop support method. The author believes that the steel bar support method is more cumbersome and affects the appearance quality of concrete. Attachment name: 20102151266205160615.zip File size: 14K

Successful reply

Experience value+ ten