Construction site layout and CI image management based on BIM technology, first of all, 3D solid models of existing and proposed buildings, warehouse processing plants, pipeline roads, construction equipment, functional zones and other building facilities in the project location; Then give each 3D solid model a dynamic time attribute to realize the real-time interaction function of each object, so that each object can dynamically change with time to form a 4D site model; Finally, in the 4D site model, modify the location and shape of each entity to make it conform to the actual situation of the project.
The site layout is optimized through BIM technology and the temporary construction scheme is finally determined. It is conducive to maximizing the use of building space as a basis for follow-up guidance on site construction. By modeling each detail model in the same size and placing it in the model, you can intuitively feel the effect after the completion of construction, and then you can adjust the size and location of temporary buildings as required to achieve the effect of deepening design and beautiful site.