Scheme description:High rise buildings with high floor height, such as high-end office buildings and office buildings, are generally required to implement unified operation and centralized management
In addition to rest and entertainment and cooking delicious food, the restaurant is also a face saving project. It is a warm place for many successful people to invite relatives and friends to exchange feelings. Therefore, the restaurant
Chinese people always use "good omens" to predict something. If everything starts well, everything will go well later.The starting point of a store is decoration and decoration
With the diversity and diversity of user needs, the market competition in the chain industry has shifted from product centered to user experience centered.For chain stores
The main purpose of the installation of air conditioners in mall buildings is to maintain appropriate indoor temperature and humidity, create a comfortable cold and warm environment that attracts customers, and improve customer's
The school central air conditioner is a central air conditioner tailored for the school.The school is different from the general place. It is crowded and has a long stay
In recent years, with the continuous improvement of industrialization in China, there are more and more industrial plant construction projects, and the application of HVAC is increasingly widespread.Industrial plants have their own characteristics
The energy consumption of air conditioning installation in hotel buildings mainly refers to the energy consumption of cold and heat sources that provide cooling and heat, such as refrigerating units, boilers, heat pump units, etc., and the energy consumption of transmission, such as fans, pumps, etc
With the continuous development and progress of the national economy and the continuous improvement of people's living standards, more and more people have higher requirements for the hospital environment.So
Product features:[Specification parameters]: single module 8-96HP, maximum 88P free module combination [Product features]: Gree GMV6 AI multi online adopts Gree big data platform for design, and through analyzing the most real needs of users and the actual application of the unit, the development is more in line with users
scanLearn more about products and technical solutions
Yuebang ElectromechanicalMore than 10 yearsEngineering experienceDeeply plough each link to create Seiko quality air conditioning installation
Energy saving deepening design
The design team deepens the design according to the installation drawings, selects the equipment scientifically, and makes a reasonable layout to better meet customer needs.
Seiko installation team
The installation team is well trained, and the installation will not cut corners, damage the equipment, be firm and durable, and reduce the maintenance cost.
Selection of brand accessories
Shanghai Flywheel and other brand environmental protection installation accessories are used, and the concealed works installation brand is reliable, and the installation is more durable.
Standardize management system
"Blue overalls" service system, national standard management, strict acceptance of equipment, personnel, materials mobilization and commissioning.
Improve installation qualification
Yuebang Electromechanical has the first level maintenance qualification and the third level electromechanical qualification. The enterprise has complete qualifications and can undertake large-scale projects.
400-6969-298199-0169-9929
± 0.5 ℃ temperature control accuracyConstant warmth and comfort
Even cold and hotFresh and healthy air
Reduce energy consumptionPower saving 30%
Not easy to leak fluorineNo dripping outside
Individual account billingCentralized control and convenient management
The multi split fluorine air conditioner has the advantages of intelligence, multiple health and energy saving, which not only meets the needs of consumers for comfort and convenience, but also is more suitable for office buildings due to its small size and light weight.
Dozens of agent brands:
Yuebang acts as an agent for more than ten brands, such as Hisense and Mitsubishi, to meet customers' demands for different brands, prices and models. It also supplies directly at the agent's price, saving investment costs.
The "fourth generation water heater" air energy central hot water installation is adopted. The heat pump absorbs the heat in the air to produce hot water, which can save up to 70% energy compared with the traditional one. At the same time, it is not affected by the environment, and 24-hour constant temperature hot water.
Nuente air energy hot water:
Nuente is one of the "Top Ten Air Energy Brands in China". Yuebang Electromechanical has long-term cooperation with it, covering commercial space, hotel space, factory room, medical space, etc., to provide high-quality air energy hot water installation.
Panasonic two-way flow fresh air installation uses DC dual motors to recover up to 82% of heat energy. At the same time, the intelligent total heat exchanger can distribute the air inlets and outlets to all areas, with more significant ventilation and purification effects, creating a comfortable and certified Yuebang electromechanical.
Diversified brand selection:
Yuebang is a distribution agent for different brands such as Braun, Shiteng, Panasonic, Worle and Mitsubishi, with different prices and models to meet different customers' needs for different commercial spaces.
Site surveyAfter calling the 400-6969-298 free service hotline, the customer service will arrange professional HVAC engineers within ten minutes to make an appointment to visit for free precise measurement, free design scheme, free drawing quotation, and free solution to the installation and use of central air conditionersView details
conceptual designAfter surveying the site, according to the actual use area and objective installation conditions of the customer as well as the use of the customer, design drawings, select models and offer free of charge to avoid affecting the use during installationView details
Decoration disclosureAfter the completion of the scheme design, communicate with the designer or decoration director of the decoration company about the installation pipeline direction, indoor and outdoor unit positions, circuits, control lines and other installation conditions, and modify and confirm the scheme in a timely mannerView details
Contract confirmationConfirm the final design scheme, installation drawings and equipment model with the customer, complete the pre-sales preparation, sign the sales installation contract, confirm the installation time and cycle, and clarify the follow-up responsibilities to reassure the customerView details
Equipment mobilizationThe installation shall be carried out in strict accordance with the Central Air Conditioning Installation Specification Manual to ensure safe and civilized installation, and all equipment pipelines and interfaces shall be subject to pressure maintaining test for leakage detection and pressure maintaining test for more than 24 hours to ensure project qualityView details
Supervision trackingDuring the installation of each project, the whole supervision process shall be carried out, and each project site supervisor must visit the site to check whether the installation is carried out according to the central air conditioning standard, and make a supervision reportView details
Commissioning acceptanceWhen the decoration is completed, the central air conditioner shall be put into trial operation, and the air outlet shall be installed for finishing work. The indoor unit and outdoor unit shall be tested for normal operation, and the temperature, noise, wind speed and other parameters shall be measured on site, and the customer shall confirm the acceptanceView details
Customer trainingThe installation of the central air conditioner is completed, and the commissioning operation is normal. Deliver the user manual to the customer, and demonstrate the use method of the central air conditioner to the customer on site and remind the use precautions to avoid mistakes in later operationView details
Class III qualification of building electromechanical equipment, design and construction qualification of air energy heat pump hot water/heating, qualification certificate of Chinese refrigeration and air conditioning equipment testing and construction enterprise, special operation certificate of building construction, construction electrician certificate, fire protection, refrigeration senior worker and other certificates
The installation of the central air conditioner is supposed to bring us a comfortable experience, but if the central air conditioner is used, the noise is too loud, which affects our normal work and rest
There may be the following reasons for the unit in the central air conditioner not running: 1. Power problem: first check whether the power supply is normal and whether the power plug is plugged in properly.If the power supply is normal, it may be electricity
With regard to the difference between the installation of central air conditioners in Shanghai and wall mounted and cabinet mounted units, Yuebang Electromechanical Co., Ltd. has
If you want to install floor heating, you should first see whether your home meets the installation conditions and what kind of floor heating is suitable for installation
Shanghai Yuebang Mechanical and Electrical Equipment Co., Ltd. focuses on the central air conditioning service field, focusing on the construction technology of central air conditioning, providing system services such as refrigeration and heating equipment and type selection design construction after-sales, fresh air exhaust equipment and type selection design construction after-sales, air energy central hot water equipment and type selection design construction after-sales With 17 years of working experience, the company has cultivated a scheme design team, construction team and after-sales support team that have won a good reputation in the industry. The company manages every process and every detail of design selection, material selection and construction in different places to ensure the quality of the project and ensure that users can choose and use with confidence.