Welcome to Kovat! About us | contact us | Site Map
National service hotline
400-6818-300
01 Professional design ability
With professional industry knowledge, we can deal with different laboratory environments and needs quickly.
02 Self owned technology R&D center
All engineers have professional background. We have maintained in-depth technical cooperation with Xiangtan University, Tianjin University of Technology and Zhongshan Torch Vocational College.
03 Excellent procurement team
The procurement engineers are senior technicians in thermal power and electrical automation, and have profound professional skills
04 Senior engineering team
It has a professional construction team composed of constructors, engineers, project managers and technicians with more than 10 years of experience, and has successfully served hundreds of enterprises!

Success stories more

Solution more

 Ground works of laboratory decoration
Ground works of laboratory decoration


Ground engineering for laboratory decoration Common decoration materials for laboratory floor: 1. Standard for laboratory floor materials: must meet the B1 fire protection requirements 2. Recommended materials for laboratory floor decoration: PVC floor glue (wear-resistant, acid-base resistant, anti-static, dust-free), epoxy resin

See more
 Laboratory decoration scheme
Laboratory decoration scheme


The decoration of the laboratory is different from the general decoration. The design should not only be beautiful and comfortable, but also be fireproof, moisture-proof, anti-corrosion and other properties. The ventilation, purification, disinfection, sterility and other functions should be increased to achieve environmental protection, safety, reliability and durability. The design of laboratory decoration is mainly

See more
0760-23626818

Company Profile

 About us
About Kovat

Zhongshan Kovat Electromechanical Co., Ltd. is located in Zhongshan City, Guangdong Province, the hometown of great men. After more than ten years of development, Kovat has won the high trust of customers with its strong technical strength and perfect service quality. Zhongshan Kovat Electromechanical Co., Ltd. has relevant patents, and has Class III qualification for professional contracting of building electromechanical installation engineering, Class II qualification for professional contracting of building decoration engineering, Class II qualification for professional contracting of electronic and intelligent engineering, and safety production license. Kovat, relying on years of accumulation in the field of laboratory construction, combined with rich practical experience in engineering construction management, provides many customers with overall laboratory engineering and technical support. In order to spread laboratory construction experience, orderly popularize the construction knowledge of various laboratories, and share the trends among industries, this website focuses on the design points, key points of establishment, and construction processes of biosafety laboratories, clean laboratories, constant temperature and humidity laboratories, enthalpy difference laboratories, working condition laboratories, and simulated environment laboratories Process technology and experience in industrial application and relevant professional knowledge. We warmly welcome all industry seniors and users to communicate, discuss and learn together with us!

See more

common problem

2010 GMP Standard for Purification Grade of Clean Laboratory
The latest version of 2010 GMP standard for clean laboratory purification grade The new version of GMP cleanliness grade A, B, C
Knock the blackboard, and do a good job before designing the laboratory!
Before the laboratory design planning, there should be sufficient preparations. The laboratory design is generally divided into preliminary design and construction drawings
Biological laboratory parameter standard
Microbiological laboratories are more and more widely used. At present, they are concentrated in hospital operating rooms and wards, pharmaceutical factories, biosafety laboratories
Difference between p2 laboratory and pcr laboratory
The PCR laboratory is also called the gene amplification laboratory, but P2 laboratory refers to one of the biological laboratories
General requirements for PCR laboratory planning and design
The main budget of PCR laboratory is the design planning, infrastructure engineering and procurement engineering, which are directly related
PCR laboratory construction knowledge and cost estimation
PCR laboratory is also called gene amplification laboratory. PCR is a polymerase chain reaction
Why can't we find an ordinary decoration company for laboratory decoration
When I came to our company to receive a consultation, I received such a question. Can we find an ordinary decoration company to decorate the laboratory
What aspects of laboratory decoration need to be considered
Some factories and schools need to carry out laboratory construction in order to have greater competitiveness and qualifications
Several aspects needing attention in laboratory decoration
We have basically seen laboratories. There are chemistry and physics laboratories in the school. Many people think that laboratory clothes
What should be paid attention to when planning the laboratory
The importance of laboratory planning is self-evident, but few people know what to pay attention to when planning laboratories


Insecticide company Shenzhen Decoration Company Plant sale Hardware processing Shanghai Fantu Consulting Shenzhen entry conditions Evaluation of scientific and technological achievements Wooden edge strip Test bench manufacturer Smart lock Aging test chamber Xi'an office decoration Wuhan Decoration Company Signage Shenzhen Small Property House