product details
  • Product name: 380V grounding wire

  • Product model: JDX-GBQ-380V
  • Product manufacturer: Kerui
  • Product documentation:
You added 1 item View Cart
Brief introduction:
The main parts of 380V grounding wire are composed of security clamp, jumper short circuit, grounding tail wire, wiring nose, bus duct, grounding terminal clamp, etc. It can be equipped with personal security clamp or grounding rod; The ground terminal of 380V grounding wire can be equipped with safety clamp or grounding clamp.
Details:

I ground wire Role of

It is mainly used as a temporary grounding device to prevent equipment and lines from suddenly coming on, eliminate the induced voltage and discharge the residual charge.

II ground wire Composition of

It is mainly composed of grounding rod, soft copper wire and grounding clamp (grounding nail). The configuration of grounding wire is affected by voltage level, use environment, customer use habits, etc. Customers can communicate with technicians at any time if they have uncertain problems when purchasing grounding wire products.

Insulating rod material: it is rolled with glass fiber reinforced epoxy resin, and is externally treated with warning color. The normal color is yellow. It can also be produced according to different voltage levels according to customer needs: green 10KV , Yellow 35KV , Red 110KV , Blue 220KV   white 500KV  

III Product name: clamp type personal security line
Product model: JDX-GBQ type
Applicable environment: 380V、400V

Picture:


4、 Use method and precautions of grounding wire

one )First, select the matching grounding flexible copper wire according to the voltage level of the grounding bar, and make sure that the configuration is correct;

two )Then check whether the appearance of the grounding rod and the grounding flexible copper wire is damaged, if not, start to assemble the grounding wire;

three )First, remove the screw on the grounding rod, firmly connect the terminal block (generally red, yellow and green) on the grounding flexible copper wire with the grounding clamp with screws and ensure that they are tightened. The three grounding rods are installed in the same way. After installation, connect the grounding terminal. The grounding wire is generally connected in two ways: phase opening and phase opening, and phase closing one The split phase type requires three grounding flexible copper wires to be connected to the grounding terminal. Form a complete set of grounding wires.

four )When using the short circuit grounding wire: connect the grounding terminal first, and then hang the grounding terminal (grounding rod) after the connection is firm; When removing the grounding wire, the grounding terminal (grounding rod) must be removed first and then the grounding terminal according to the procedure.

five )Specific operation steps:

A. Installation of grounding wire: go through the work permit procedure.

Preparation before pole climbing:

1) Dress requirements: wear work clothes, insulated shoes, work gloves and safety helmet;

2) Check whether personal tools are qualified;

3) Check the line name, pole number and whether the line is powered off;

4) Check whether the rod body and rod root are firm and free from cracks;

Ground grounding of grounding wire: the grounding nail shall be driven into the soil, and the depth shall not be less than 0.6m Or the grounding clamp shall hold the grounding terminal firmly, and then the grounding terminal of the grounding wire shall be reliably connected with the grounding rod.

B. Power inspection by climbing the pole: climb the pole to a proper position and fasten the safety belt. Check first Electroscope , Confirmation Electroscope It is intact, and then the line shall be tested phase by phase.

C. Grounding wire hanging on the pole: after the line is verified to be free of voltage through the ground, the operator shall immediately hang the grounding wire at the electricity inspection place. After all three phases of the line are grounded, the operator shall evacuate the tower.

D. Remove the grounding wire:

Carefully check the line name and pole number.

Check and confirm that all personnel on the pole are down, there is no * * foreign matter on the pole, and the line status meets the power transmission conditions.

The operator climbs the pole to the proper position and fastens the safety belt.

Remove the grounding wire on the line, fasten it with a lifting rope, and then lift the rod down.

After all the grounding wires of the upper pole are removed, the operators of the upper pole shall evacuate the tower.

Remove the grounding terminal of the grounding wire, pull out the grounding rod, and clean the work site.

Precautions: electric shock, unreliable grounding, failure to check the grounding or use of unqualified electroscope will cause dangerous accidents. The warranty period is one year under normal use of grounding wire.

six )Maintenance and custody:

Before each use, carefully check whether the grounding wire is in good condition. The soft plastic copper wire should be free of exposure, breakage, and nuts should not be loose. Otherwise, it shall not be used. The product shall be kept clean and tidy, and shall not be thrown anywhere. Attention shall be paid to cleaning and sanitary work to prevent sediment and dirt from entering the pores of the product, thus affecting the normal use of the grounding wire. The grounding wire subjected to the short circuit current shall be judged according to the size of the short circuit current and appearance inspection, and generally shall be scrapped.

 

Our company mainly produces Electroscope ground wire Security fence Insulation pad Personal protective equipment Signboard Insulated ladder Stool Safety tool cabinet And other products

contact number: thirteen billion six hundred and three million two hundred and eleven thousand three hundred and sixty-nine


title:
Content:
contacts:
contact number:
Email:
corporate name:
Contact address:
 
 
Note: 1. You can use the shortcut keys Alt+S or Ctrl+Enter to send information!
2. If necessary, please leave your detailed contact information!

Alistore scanning code to add WeChat

Shijiazhuang Kerui Electric Co., Ltd
Factory headquarters: Duanjiazhuang, Jinzhou, Hebei
24-hour service phone: 13603211369 0311-85021355
Fax No.: 0311-85021277
Email: sjzkerui@163.com
Website: www.sjzkerui.com

Ji Gong Wang An Bei No. 13018302001138