China Machinery Industry City Planning, Design and Research Institute
Guiding Opinions on Charging of Urban and Rural Planning and Design
According to the document of China Urban Planning Association [(2017)] - Guidance on Charging of Urban and Rural Planning and Design, our institute, based on the national market survey, proposes the following charging standards for the city (region) development planning consultation entrusted by customers for reference by the industry and customers.
S/N |
City size (10000 people) |
Billing unit price (10000 yuan/km2) |
one |
Small cities (below 50) |
seven |
two |
Medium sized cities (50-100) |
six |
three |
Large cities (100-500) |
five |
four |
Megacities (500-1000) |
four point five |
five |
Megacities (over 1000) |
four |
Note: Special research on strategic planning, master planning, implementation evaluation of master planning, urban agglomeration planning, urban and rural overall planning, multi regulation integration and other contents will be added to the existing article notes.
1. The classification of cities in this charge is in accordance with the standards for megacities, megacities, large cities, medium-sized cities and small cities specified in the Notice of the State Council on Adjusting the Standards for City Scale Classification (GF [2014] No. 51), excluding township planning.
2. The population size in the table is based on the population at the end of the planning period. If the population size exceeds, it needs to be supplemented additionally.
3. The overall urban planning is classified according to the population size, and the planning cost is calculated according to the planned construction land.
4. This charge does not include the urban system planning prepared separately.
5. 50% of the overall planning and design fee shall be charged if the overall urban planning outline is prepared separately.
6. The basic charge price of the urban master plan is 500000 yuan.
7. In the preparation of urban master plan, if relevant special research is required, it shall be charged separately. The charge is: 700000 yuan per megacity, 500000 yuan per megacity, 350000 yuan per megacity, 250000 yuan per medium-sized city, 150000 yuan per small city; Special studies prepared separately shall be charged separately.
8. To prepare the overall urban planning, the proportion of workload in each stage is as follows: the status quo investigation stage (30%), the preliminary achievement stage (20%), the outline achievement stage (40%), and the final achievement stage (10%).
9. The overall planning survey and investigation expenses shall be agreed by both parties, and if the entrusting party organizes, the expenses shall be borne by the entrusting party; If the planning and design unit organizes by itself, the cost shall be borne by the planning and design unit itself.
10. The overall planning implementation evaluation, the preliminary study of the overall planning revision, and the strategic planning are charged at 30% of the overall urban planning.
11. In the preparation and approval of urban master plan, if it needs to be submitted to the State Council for approval, it needs to increase the difficulty coefficient by 1.3; if it needs to be submitted to the provincial government for approval, it needs to increase the difficulty coefficient by 1.1.
S/N |
Total area (km2) |
Billing unit price (Ten thousand yuan / 100 square kilometers) |
one |
≤5000 |
six |
two |
5000-10000 |
five |
three |
10000-20000 |
four |
four |
20000-50000 |
three |
|
>50000 |
Increase by 10000 yuan/100 square kilometers |
Note:
1. The "total area of the region" is calculated based on the administrative area of cities and counties in the planning area.
2. The base price of urban agglomeration planning is 3 million yuan.
S/N |
Planned area
(square kilometers) |
Billing unit price of construction land
(Ten thousand yuan / Square kilometers) |
Non construction land charging unit price
(Ten thousand yuan / Square kilometers) |
one |
≤10 |
six |
three |
two |
10-30 |
five |
two point five |
three |
30-50 |
four |
two |
four |
50-100 |
three |
one point five |
five |
>100 |
Increasing by 24000 yuan/KM2 |
Increase by 12000 yuan/KM2 |
Note:
1. "Planning area" refers to the area of urban construction land at the end of the planning period approved by the competent administrative department.
2. "Non construction land" refers to the rest of land in the urban planning area except for construction land.
3. The basic charge price for urban and rural overall planning is 500000 yuan.
1. Multi regulation integration is charged at 2-3 times of the urban and rural overall planning cost.
2. The base price of multi compliance charging is 800000 yuan.
S/N |
City size (10000 people) |
Current charging unit price (10000 yuan/km2) |
one |
Small cities (below 50) |
seven |
two |
Medium sized cities (50-100) |
six |
three |
Large cities (100-500) |
five |
four |
Megacities (500-1000) |
four point five |
five |
Megacities (over 1000) |
four |
Note:
1. The classification of cities in this charge is in accordance with the standards for megacities, megacities, large cities, medium-sized cities and small cities specified in the Notice of the State Council on Adjusting the Standards for City Scale Classification (GF [2014] No. 51).
2. The land area referred to in the charging unit price refers to the construction land area.
3. The basic charge price of zoning planning and design is 500000 yuan.
4. The zoning plan is prepared, and the workload division ratio of each stage is: 30% in the status quo investigation stage, 20% in the preliminary achievement stage, 40% in the outline achievement stage, and 10% in the final achievement stage.
5. The overall planning of the new area, the overall planning of the industrial park, the overall planning of certain specific areas, etc., are recommended to be included in the charging standard of the zoning plan for billing.
3.1.1 Regulatory detailed planning (prepare one level: directly prepare the plot level)
S/N |
Project category |
Billing unit price (yuan / Hectare) |
remarks |
one |
New urban areas and development zones |
three thousand |
|
two |
General urban area |
three thousand and five hundred |
|
three |
Key urban areas |
four thousand |
|
Note:
1. The charging unit price in the table does not include the sub drawing rules. If the sub map is added, the charging unit price will be increased by 500 yuan/hectare respectively.
2. If the schematic diagram of building shape scheme is added, the charging unit price will be increased by 2000 yuan/hectare respectively.
3. The base price of regulatory detailed planning is 300000 yuan.
4. Prepare a level control detailed plan, and the workload division proportion of each stage:
1) Built up area: 30% in the status survey stage, 40% in the scheme stage, and 30% in the achievement production stage. If the sub map is added, it will be 30% in the status quo investigation stage, 35% in the scheme stage, and 35% in the achievement production stage.
2) New Area: 15% in the status quo investigation stage, 55% in the scheme stage, and 30% in the production of achievements. If the sub map is added: 15% in the status quo investigation stage, 45% in the scheme stage, and 40% in the achievement production stage.
5. The evaluation of the regulatory detailed plan is calculated at 30% of the total charge.
3.1.2 Regulatory detailed planning (preparation of two levels: unit (block) level and plot level)
S/N |
Project category |
Billing unit price (yuan/hectare) |
remarks |
one |
New urban areas and development zones |
three thousand and five hundred |
|
two |
General urban area |
four thousand |
|
three |
Key urban areas |
four thousand and five hundred |
|
Note:
1. The unit (block) level regulatory detailed planning is charged at 55%, and the plot level regulatory detailed planning is charged at 45%.
2. The charging unit price in the table does not include the sub drawing rules. If the sub map is added, the charging unit price will be increased by 500 yuan/hectare respectively.
3. If the schematic diagram of building shape scheme is added, the charging unit price will be increased by 2000 yuan/hectare respectively.
4. The base price of charging for the preparation of two levels of regulatory detailed planning is 350000 yuan.
5. Prepare a detailed control plan, and the proportion of workload in each stage:
1) Built up area: 30% in the status quo investigation stage, 40% in the scheme stage, and 30% in the achievement production stage; If the sub map is added, the current situation investigation stage will be 30%, the scheme stage 35%, and the achievement production stage 35%;
2) New area: 15% in the status quo investigation stage, 55% in the scheme stage, and 30% in the production of achievements; If the sub map is added, the workload division proportion is: 15% in the status quo investigation stage, 45% in the scheme stage, and 40% in the achievement production stage.
6. The evaluation of the regulatory detailed plan is calculated at 30% of the total charge.
3.1.3 Revision of regulatory detailed planning
1. The revision of regulatory detailed planning is divided into overall revision by unit (block) and local adjustment.
- The unit (block) shall be charged according to 3.1.1 and 3.1.2 for overall regulatory detailed planning modification.
3. The regulatory detailed planning modification of local plot adjustment in the unit (block) generally includes the demonstration report of regulatory planning modification, demonstration scheme, online GIS data, etc.
1) The charge for the control plan modification demonstration report is 50% of the charge in 3.1.1 and 3.1.2. The demonstration scheme is charged according to its content and depth with reference to relevant special planning. The charge for online GIS data is 5% of the charge in 3.1.1 and 3.1.2.
2) If the client requires the production of renderings, solid models, animations, etc., the cost shall be calculated separately.
3.2.1 Residential area
S/N |
Land use scale (hectare) |
Billing unit price (yuan/hectare) |
remarks |
one |
Below 3 |
twenty-six thousand |
|
two |
3~5 |
twenty-two thousand |
|
three |
5~10 |
twenty thousand |
|
four |
10~20 |
eighteen thousand |
|
five |
20~30 |
fifteen thousand |
|
six |
30~50 |
twelve thousand |
|
seven |
Over 50 |
ten thousand |
|
Note:
1. The base price of planning and design is 100000 yuan.
2. The construction unit is the model selection scheme. In case of single building scheme design, the cost of building scheme shall be calculated separately.
3. If the client requires to make renderings, models, etc., the cost shall be calculated separately.
4. The entrusting party shall increase the planning cost by 30% for each additional plan.
5. If the entrusting party needs to carry out the constructive general layout design, it will increase the planning cost by 50%.
6. The vertical planning content needs to be prepared, and the charging is multiplied by a factor of 1.3.
7. Traffic impact assessment, sunshine analysis and other planning shall be carried out, which shall be charged separately according to relevant professional planning.
3.2.2 Public buildings in general urban areas
S/N |
Land use scale (hectare) |
Billing unit price (yuan/hectare) |
remarks |
one |
Below 3 |
thirty thousand |
|
two |
3~5 |
twenty-eight thousand |
|
three |
5~10 |
twenty-six thousand |
|
four |
10~20 |
twenty-two thousand |
|
five |
20~30 |
nineteen thousand |
|
six |
30~50 |
sixteen thousand |
|
seven |
Over 50 |
twelve thousand |
|
Note:
1. The base price of planning and design is 120000 yuan.
2. The construction unit is the model selection scheme. In case of single building scheme design, the cost of building scheme shall be calculated separately.
3. If the client requires to make renderings, models, etc., the cost shall be calculated separately.
4. If the entrusting party needs to carry out the constructive general layout design, it will increase the planning cost by 50%.
5. The vertical planning content needs to be prepared, and the charging is multiplied by a factor of 1.3.
6. Traffic impact assessment, sunshine analysis and other planning shall be carried out, which shall be charged separately according to relevant professional planning.
3.2.3 Key urban areas, large public buildings and surrounding areas
S/N |
Project category |
Billing unit price (yuan/hectare) |
remarks |
one |
Key urban areas |
thirty thousand |
|
two |
Large public buildings |
thirty-five thousand |
|
three |
Main public buildings and surrounding areas |
thirty-five thousand |
|
Note:
1. The base price of planning and design is 150000 yuan.
2. The single building is a type selection scheme. In case of single building scheme design, the cost of building scheme shall be calculated separately.
3. If the client requires to make renderings, models, etc., the cost shall be calculated separately.
4. If the entrusting party needs to carry out the constructive general layout design, it will increase the planning cost by 50%.
5. The vertical planning content needs to be prepared, and the charging is multiplied by a factor of 1.3.
6. Traffic impact assessment, sunshine analysis and other planning shall be carried out, which shall be charged separately according to relevant professional planning.
3.2.4 Planning of parks, amusement parks and other gardens
S/N |
Land area (hectare) |
Billing unit price (yuan/hectare) |
remarks |
one |
Less than 20 |
twenty thousand |
|
two |
20~50 |
fifteen thousand |
|
three |
50~100 |
ten thousand |
|
four |
Above 100 |
eight thousand |
|
Note:
1. The base price of planning and design is 200000 yuan.
2. If the client requires to make renderings, models, etc., the cost shall be calculated separately.
3. Professional park planning is multiplied by 1.3~1.5 complexity coefficient.
S/N |
Scale (square kilometers) |
Billing unit price (10000 yuan/km2) |
remarks |
one |
Less than 50 |
one |
|
two |
50-100 |
zero point eight |
|
three |
100-200 |
zero point seven |
|
four |
200-500 |
zero point five |
|
five |
Over 500 |
zero point three |
|
Note:
1. The base price of planning and design is 300000 yuan.
2. This charge is for the planning outline of the scenic spot separately prepared.
S/N |
Scale (square kilometers) |
Billing unit price (10000 yuan/km2) |
remarks |
one |
Less than 20 |
three |
|
two |
20-50 |
two point five |
|
three |
50-100 |
two |
|
four |
100-200 |
one point five |
|
five |
200-500 |
one point two |
|
six |
Over 500 |
one |
|
Note:
1. The base price of planning and design is 500000 yuan. (Note: The base price of the master plan and the outline in the original standard is 150000 yuan, which is unreasonable. Since the master plan includes the work of the scenic spot planning outline, and the content is more complete and rich, the base price should be higher than the outline.)
2. The overall planning fee of the scenic spot has included the workload of the scenic spot planning outline.
3. Qualification of planning unit, urban planning/tourism planning grade B can be multiplied by a coefficient of 1.2, and urban planning/tourism planning grade A can be multiplied by a coefficient of 1.5;
4. The approval level can be multiplied by a factor of 1.5 when submitted to provincial departments for approval, 1.8 when submitted to national ministries for approval, and 2.0 when submitted to the State Council for approval;
5. Other types of scenic spots (tourist areas, forest parks, water conservancy landscapes, geological parks, wetland parks) can refer to the fees.
6. The overall planning area of the scenic spot shall be calculated according to the actual planned land area. The water surface shall be calculated according to the actual planned utilization range.
1. The planning and design fees shall refer to the urban regulatory detailed planning standards.
2. The detailed planning area shall be calculated according to the actual planned land area. If the non use area (protective forest land, garden plot, cultivated land, grassland, pure natural water area, and land for detention) that must be included in the planning scope due to the need of integrity, the area can be calculated as 20% of its scope.
S/N |
Scale (hectare) |
Billing unit price (ten thousand yuan / Hectare) |
remarks |
one |
Less than 20 |
two point five |
|
two |
20-50 |
two |
|
three |
50-100 |
one point eight |
|
four |
100-200 |
one point five |
|
five |
Over 200 |
one point two |
|
Note:
1. The base price of planning and design is 300000 yuan.
2. The approval level can be multiplied by a factor of 1.5 when submitted to provincial departments for approval, and by a factor of 1.8 when submitted to national ministries and commissions for approval.
3. The detailed planning area shall be calculated according to the actual planned land area. If the non use area (protective forest land, garden plot, cultivated land, grassland, pure natural water area, and land for detention) that must be included in the planning scope due to the need of integrity, the area can be calculated as 10% - 20% of its scope.
1. The short-term construction plan of the city shall be prepared separately, and the charge shall be 40% of the charge of the overall urban and rural planning; If it is prepared at the same time as the urban and rural master plan, it shall be calculated as 30% of the urban and rural master plan.
2. If the cost of urban recent construction planning is less than 400000 yuan, it will be charged as 400000 yuan.
3. If the annual implementation plan is prepared in the implementation stage of the recent construction plan, it shall be calculated at 20% of the recent construction plan; If there is no short-term construction plan, an annual implementation plan shall be prepared separately, which shall be calculated at 40% of the recent construction plan.
Note:
1. The classification of cities in this charge is in accordance with the standards for megacities, megacities, large cities, medium-sized cities and small cities specified in the Notice of the State Council on Adjusting the Standards for City Scale Classification (GF [2014] No. 51), excluding township planning.
2. The billing is based on the population forecast at the end of the planning period.
3. The basic charge price of the city's recent construction planning is 400000 yuan.
4. In the preparation of the short-term construction plan, if relevant special research is required, it shall be charged separately. The charge is: 300000 yuan per megacity, 250000 yuan per megacity, 200000 yuan per megacity, 150000 yuan per medium-sized city, 100000 yuan per small city; Special studies prepared separately shall be charged separately.
5. Prepare the short-term construction plan, and the workload of each stage is divided into: the status quo investigation stage (30%), the scheme stage (50%), and the final achievement stage (20%).
6. The costs of planning, investigation and investigation shall be agreed by both parties. If the entrusting party organizes, the costs shall be borne by the entrusting party; If the planning and design unit organizes by itself, the cost shall be borne by the planning and design unit itself.
7. The standard database warehousing charge is calculated at 30% of the recently planned charge.
8. The Assessment of the Implementation of the Recent Construction Plan and the Preliminary Study of the Revision of the Master Plan are separately prepared and charged at 20% of the city's recent planning.
S/N |
Scale (10000 persons) |
Billing unit price (10000 yuan/10000 people) |
one |
<100 |
one point five |
two |
100-500 |
one point two |
three |
500-1000 |
one |
four |
1000-5000 |
zero point eight |
five |
>5000 |
zero point four |
Note:
1. The population scale in the table is subject to the total population of the region at the end of the planning period.
2. For planning projects of regional scale such as metropolitan area, town group, regional coordinated planning, main functional area planning, regional integration planning, etc., the design depth is basically consistent with the urban system planning, refer to this standard for implementation.
3. In the preparation of urban system planning, if relevant special research is required, it shall be charged separately. The charge is: 500000 yuan/each for provinces, regions and megacities, 400000 yuan/each for large cities, 300000 yuan/each for medium-sized cities, and 200000 yuan/each for small cities.
4. The base price of planning and design is 1 million yuan.
5. Considering the large differences in population size and urban density at different regional scales in China, the research depth and data collection difficulty of different regions are also quite different, which can be modified by multiplying the difficulty coefficient of 0.8-1.5.
7.1.1 The overall urban design refers to the overall design of the centralized urban construction area and the surrounding necessary areas, which studies and determines the urban style and features from the macro level, protects the natural landscape pattern, optimizes the urban form pattern, and defines the public space system and other system requirements.
7.1.2 Prepare the overall urban design of the overall urban planning or zoning planning stage separately, charge according to the scale of the city and determine the charging unit price according to the content of the overall urban design results.
S/N |
City size
(10000 people) |
Billing unit price
(10000 yuan/km2) |
remarks |
one |
small city (Less than 500000 people) |
six |
|
two |
Medium-sized city (500000~1 million people) |
five point five |
|
three |
big city (1 million to 5 million people) |
five |
|
four |
megacity (5 million to 10 million people) |
—— |
It is recommended to prepare the overall urban design for administrative or functional areas |
five |
Megacity (More than 10 million people) |
—— |
It is recommended to prepare the overall urban design for administrative or functional areas |
Note:
1. The classification of city size in this charge is in accordance with the standards for super cities, mega cities, large cities, medium-sized cities and small cities specified in the Notice of the State Council on Adjusting the Standards for City Size Classification (GF [2014] No. 51). For megacities and megacities, it is not recommended to prepare the overall urban design at the municipal level. It is recommended to prepare the overall urban design corresponding to the zoning plan separately for the administrative regions or functional areas under their jurisdiction, and the charging standards can be specified separately according to the actual situation of the city.
2. The overall urban design base price is 1 million yuan.
3. For the overall urban design, the planning cost shall be calculated according to the area of urban construction land at the end of the planning period determined in the overall plan or zoning plan.
4. If the client requires the production of solid models, animations, etc., the cost shall be calculated separately.
5. The above charging standard does not include the preparation cost of overall urban design guidelines.
7.1.3 Overall urban design guidelines refer to the public policies that put forward systematic control requirements for urban features, spatial patterns, public space systems, and overall control of buildings according to the overall urban design.
7.1.4 In the area where the overall urban design has been prepared, if the client requires to increase the overall urban design guidelines, it will be charged at 50% of the overall urban design charging standard; In areas where the overall urban design has not been prepared, if the entrusting party requires to prepare the overall urban design guidelines separately, the fees shall be charged at 1.5 times of the overall urban design charging standard.
7.2.1 Urban design in key areas refers to the overall conception and detailed design of urban form and public space in key areas such as urban core areas and central areas, historic areas, new towns and new areas, important streets, waterfront areas, mountain areas, transportation hubs, and is an important stage in shaping high-quality urban space.
7.2.2 The urban design of key areas shall be prepared separately, and the charging unit price shall be determined according to the scale of land use and the detailed urban design results.
S/N |
Land use scale (hectare) |
Billing unit price (10000 yuan/hectare) |
remarks |
one |
Below 10 |
—— |
It is charged according to the standard of the architectural design scheme stage in the plot. |
two |
10~50 |
three |
|
three |
50~100 |
two point five |
|
four |
100~200 |
two |
|
five |
200~300 |
one point five |
|
six |
Above 300 |
one |
|
Note:
(1) The basic charge price of urban design in key areas is 600000 yuan;
(2) If the client requires the production of solid models, animations, etc., the cost shall be calculated separately;
(3) If the client requires to prepare a single building scheme, the architectural scheme design cost shall be calculated separately;
(4) The charging standard in the table does not include the preparation cost of detailed urban design guidelines.
7.2.3 The detailed urban design guidelines are the control and guidance requirements for the combination of rigidity and flexibility for urban form, public space, overall control of buildings and other space elements, based on the urban design of key areas and the transformation of design language into management language.
7.2.4 For key areas where detailed urban design has been prepared, if the client requires to add detailed urban design guidelines, it shall be charged at 50% of the detailed urban design charging standard; For key areas where detailed urban design has not been prepared, if the client requires to prepare detailed urban design guidelines separately, it will be charged at 1.5 times of the detailed urban design charging standard.
7.2.5 If the entrusting party requires urban design integration in the planning implementation stage, this part of fees shall be charged at 50% of the detailed urban design charging standard.
7.3.1 Special urban design is a separate urban design for street system, square and park system, slow traffic system, greenway system, vision corridor system, river and water system, urban style, architectural color, urban skyline, outdoor advertising, night scene lighting and other urban systems and elements.
7.3.2 Special urban design prepared separately based on the overall urban design shall be charged independently according to the overall urban design charging standard.
7.3.3 The special urban design prepared separately based on the detailed urban design shall be charged independently according to the detailed urban design charging standard.
7.4.1 In the preparation of regulatory detailed planning for areas beyond the scope of key areas, special chapters and additional plans for detailed urban design requirements shall be added, and 50% of the planning cost shall be increased on the basis of the billing of regulatory detailed planning.
7.4.2 The cost of urban design scheme collection, bidding, scheme comparison and selection will be determined separately according to the specific situation.
7.4.3 The evaluation report of urban design implementation shall be prepared separately, and the independent charging shall be conducted according to 20% of the urban design charging standard of the corresponding stage, and the basic charging price shall be 200000 yuan.
S/N |
Scale of construction land
(square kilometers) |
Charging standard (ten thousand yuan) |
one |
≤2 |
500000 yuan/piece |
two |
2-5 |
500000 to 800000 yuan 100000 yuan/km2 for every additional 1 km2 |
three |
5-10 |
800000-1200000 yuan 80000 yuan/km2 for every additional 1 km2 |
four |
10-20 |
1.2-1800000 yuan RMB 60000/km2 for every additional 1 km2 |
five |
>20 |
Refer to the charging standard of the overall urban planning |
Note:
1. The standard in this charging is applicable to the town planning outside the county people's government.
2. When preparing the town master plan, the town system plan should be prepared at the same time.
3. The planning and design charge is calculated according to the planned construction land area at the end of the planning period, and the planning and design charge base price is 500000 yuan.
4. This charge includes the overall planning of the town and the town system planning.
5. If special research is carried out, it shall be charged separately at 150000 yuan/special topic.
6. The proportion of workload in each stage is: 30% in the status quo investigation stage, 40% in the scheme stage, and 30% in the achievement production stage.
Refer to the corresponding urban detailed planning charging standards.
9.1.1 Urban and rural construction land is charged at 50000 yuan/square kilometer, and other land is charged at 5000 yuan/square kilometer. This plan includes the planning of the township government location and the township system planning.
9.1.2 The basic billing price is 400000 yuan.
9.1.3 If special research is carried out, it shall be charged separately at 100000 yuan/topic.
9.1.4 The detailed planning of the township government location shall refer to the corresponding urban detailed planning charging standards.
S/N |
Scale of village construction land (hectare) |
Charging standard (ten thousand yuan) |
one |
≤25 |
300000 yuan/piece |
two |
25-50 |
300000 to 800000 yuan For each additional hectare, charge at 20000 yuan/hectare |
three |
>50 |
>800000 yuan 15000 yuan/hectare for every additional hectare |
Note:
1. The village planning should include the content of village planning.
2. The design base price is 300000 yuan.
3. The single building is a type selection scheme. In case of single building scheme design, it shall be calculated separately according to the charging standard of building scheme.
4. If it is required to make renderings, models, animations, etc., the cost will be calculated separately.
5. If special research is carried out, it shall be charged separately at 50000 yuan/special topic.
6. The proportion of workload in each stage is: 40% in the status quo investigation stage, 40% in the scheme stage, and 20% in the achievement production stage.
S/N |
Scale of village construction land (hectare) |
Charging standard (ten thousand yuan) |
one |
≤15 |
300000 yuan/piece |
two |
>15 |
15000 yuan/hectare for every additional hectare |
Note:
1. The design depth of village renovation shall refer to the depth of detailed constructive planning.
2. The design base price is 300000 yuan.
3. The single building is a type selection scheme. In case of single building scheme design, it shall be calculated separately according to the charging standard of building scheme.
4. If it is required to make renderings, models, animations, etc., the cost will be calculated separately.
10.1.1 Urban comprehensive transportation planning
S/N |
City size (10000 people) |
Charging guidance standard (ten thousand yuan / 10000 people) |
one |
Small cities (below 50) |
three |
two |
Medium sized cities (50-100) |
3-2.5 |
three |
Large cities (100-500) |
With 2.5 million yuan as the base, 15000 yuan of planning fee will be added for every 10000 people added |
four |
Megacities (500-1000) |
With 8.5 million yuan as the base, a planning fee of 12000 yuan will be added for every 10000 people added |
five |
Megacities (over 1000) |
With 14.5 million yuan as the base, the planning fee of 10000 yuan will be increased for every 10000 people increased |
Note:
1. The classification of cities in this charge is in accordance with the standards for megacities, megacities, large cities, medium-sized cities and small cities specified in the Notice of the State Council on Adjusting the Standards for City Size Classification (GF [2014] No. 51). Districts, counties and towns with complete administrative areas can refer to the same city size. Division Criteria
2. The depth of urban comprehensive transportation planning shall meet the depth specified in the Measures for the Preparation of Urban Comprehensive Transportation System Planning (JC [2010] No. 13). Depth Requirements
3. The base price of planning and design is 500000 yuan. [Billing Base Price]
4. The city size is the population size determined in the overall urban planning. For cities with intermediate population size, the insertion method can be used. [Standard determination]
5. This charge does not include the cost of organizing and implementing the traffic survey work by the entrusting unit. [Work not included]
6. If the entrusting party increases the planning contents such as urban road intersections and other depth requirements, it shall multiply them by a factor of 1.2-1.5 according to the depth and workload increase. [Adjustment coefficient]
7. The urban traffic development strategic planning is charged at 60% - 70% of the comprehensive traffic planning of the same city. [Development Strategy Billing]
8. The comprehensive transportation planning implementation evaluation shall be charged at 50% - 60% of the comprehensive transportation planning of the same city. [Implementation of assessment fees]
9. The comprehensive transportation planning of key functional areas and hub areas shall be prepared separately, and the charging standard of regional comprehensive transportation planning shall be referred to. [Billing in key areas]
10. If special research is set up when carrying out urban comprehensive transportation planning, the special fees shall refer to the charging standards for rail transit planning and the charging fees for special transportation planning. [Special fees]
10.1.2 Regional comprehensive transportation planning
Project category |
Charging guidelines
(10000 yuan/km2) |
Ordinary area |
<2 square kilometers |
fifty |
2-5 square kilometers |
thirty-five |
5-10 square kilometers |
twenty |
>10 square kilometers |
fifteen |
Hub area |
Airport, railway station, port |
The base price is 1.5 million yuan/place |
Long distance stations, public transport hubs, etc |
The base price is 1 million yuan/place |
Note:
1. Regional comprehensive transportation planning refers to functional areas, industrial parks, etc. within the administrative area. [Scope definition]
2. For regional comprehensive transportation planning, the planning and design base price is 500000 yuan. [Billing Base Price]
3. Comprehensive traffic planning of towns, townships and villages can be implemented with reference to this standard. [Town, township and village planning]
4. If the entrusting party increases the planning contents such as urban road intersections and other depth requirements, it shall multiply them by a factor of 1.2-1.5 according to the depth and workload increase. [Adjustment coefficient]
10.2.1 Detailed planning of regional traffic control
S/N |
Project category |
Billing unit price (ten thousand yuan / Hectare) |
one |
New urban areas and development zones |
one |
two |
Urban built-up area |
one point five |
Note:
1. The main work content of the regional traffic control detailed planning is to plan and implement the road traffic network, main road intersections, rail transit lines, stations, vehicle bases and traffic stations of the control detailed planning. Work Content
2. The base price of planning and design is 200000 yuan. [Billing Base Price]
3. The above charging standards do not include the cost of major traffic facilities adjustment. [Excluding expenses]
4. The above detailed regional traffic control planning can be multiplied by an adjustment coefficient of 1.2-1.5 in consideration of the project depth and workload increase. [Adjustment coefficient]
10.2.2 Analysis of traffic carrying capacity
Traffic carrying capacity is an important indicator to reflect the coordinated relationship between traffic and land in regulatory detailed planning.
Planning scope (hectare) |
Charging guidelines (10000 yuan/hectare) |
<10 |
- |
10<S<100 |
5.0-2.0 |
>100 |
With 2 million yuan as the base, 10000 yuan will be added for every additional hectare. |
Note:
1. The base price of planning and design is 500000 yuan. [Billing Base Price]
2. The above traffic carrying capacity analysis can be multiplied by an adjustment factor of 1.2-1.8 considering the project depth and workload increase. [Adjustment coefficient]
10.3.1 Detailed design of overall traffic
S/N |
City size (10000 people) |
Charging guidance standard (10000 yuan/10000 people) |
one |
Small cities (below 50) |
three |
two |
Medium sized cities (50-100) |
two point five |
three |
Large cities (100-500) |
two |
four |
Megacities (500-1000) |
one point five |
five |
Megacities (over 1000) |
one point two |
Note:
1. The base price of overall traffic detailed design is 600000 yuan. [Billing Base Price]
2. If the client requires traffic simulation, the cost shall be calculated separately. [Simulation Billing]
3. The above detailed traffic design can be multiplied by an adjustment factor of 1.0-1.5 in consideration of project depth and workload increase. [Adjustment coefficient]
10.3.2 Detailed design of regional traffic
S/N |
Land use scale (hectare) |
Charging guidelines (10000 yuan/hectare) |
one |
<10 |
- |
two |
10-50 |
one point five |
three |
50-100 |
one point three |
four |
100-300 |
one |
five |
300-500 |
zero point seven five |
six |
Over 500 |
zero point five |
Note:
1. The base price of regional traffic detailed design is 300000 yuan. [Billing Base Price]
2. If the client requires traffic simulation, the cost shall be calculated separately. [Simulation Billing]
3. The above detailed traffic design can be multiplied by an adjustment factor of 1.0-1.5 in consideration of project depth and workload increase. [Adjustment coefficient]
10.4.1 Urban rail transit network planning
City size (10000 people) |
Charging guidance standard (10000 yuan) |
fifty |
three hundred |
200000 yuan of preparation cost will be increased for every 500000 people increased |
Note:
1. The charging standard refers to the Guiding Opinions on Charging of Urban Rail Transit Preliminary Work issued by China Urban Rail Transit Association in 2015.
2. The charging standard is formulated based on the requirements for the content and depth of network planning in the Standard for the Preparation of Urban Rail Transit Network Planning (GB/T50546-2009) and the relevant provisions of the National Development and Reform Commission on the preparation and review of network planning.
3. The urban scale in the table is the urban population scale within the planning area (or within the key planning scope of the line network) at the end of the planning period determined by the urban master plan, which can be calculated by interpolation method if it is located between different grades.
4. The above billing scheme takes into account the general situation of network planning. If the planned city has special requirements in terms of topography and geology, environmental protection, cultural relics protection, etc., the above charges shall be multiplied by an adjustment coefficient of 1.1-1.5, and the specific value shall be determined by both parties through negotiation within the above range; If necessary, special research will be carried out separately, and the cost will be calculated separately, and the adjustment coefficient will not be considered for the charge of the main report.
5. Adjustment of line network planning: generally, it refers to the line network optimization work carried out on the basis of basically unchanged core content of line network planning, such as strategic positioning and overall layout of line network, and there is no major change in the scale of line network, and the charge is 80% of the above standard; Revision of line network planning: in general, it refers to the major planning modification carried out in coordination with the revision of the upper level planning or expansion of the planning scope and system level, which is regarded as a re preparation and charged at 100%.
6. The above billing scheme does not include the costs of the client's specific network planning research and investigation. If the client needs to organize research and investigation, the costs will be separately arranged by the client.
7. The above charging scheme is the cost of preparing the main report, and the cost of various special research can be separately calculated by referring to the relevant provisions of the Standard for Preparation of Urban Rail Transit Network Planning (GB/T50546-2009).
10.4.2 Recent construction planning of urban rail transit
Estimated construction application length (km) |
Charging standard (ten thousand yuan) |
≤30 |
three hundred |
50 |
350 |
100 |
400 |
150 |
450 |
200 |
500 |
≥250 |
five hundred and fifty |
Note:
1. The charging standard refers to the Guiding Opinions on Charging of Urban Rail Transit Preliminary Work issued by China Urban Rail Transit Association in 2015.
2. The charging standard is formulated based on the requirements of the National Development and Reform Commission on the content and depth of the recent construction planning in the Key Points of Urban Rail Transit Planning Preparation and Review (FGJ [2015] No. 49) and relevant regulations The cost of preparing the main report of the recent construction plan on the basis that the submitted project scheme meets the depth of the pre feasibility study.
3. In principle, the recent construction planning fees are calculated according to the scale. Considering that the owner has a preliminary intention of the construction scheme during the business negotiation stage of the project and can estimate the proposed scale, this Opinion proposes a graded charging standard. In actual work, it can be calculated by interpolation in each gear according to the specific situation.
4. The charging standard takes into account the conventional situation of the recent construction planning of general urban rail transit. When the urban rail transit network is complex, the engineering construction conditions are harsh, or there are special requirements in the environment, cultural relics protection, safety, etc., the difficulty adjustment coefficient can be set according to the actual situation, and the adjustment coefficient shall be selected by both parties through negotiation within 1.1-1.5; If necessary, special research will be carried out separately, and the cost will be calculated separately, and the adjustment coefficient will not be considered for the charge of the main report.
5. Adjustment of recent construction plan: generally, 80% of the above standard will be charged for the partial optimization and adjustment of the approved construction scheme after the upper level plan remains unchanged or partially adjusted within the same planning period; Recent construction planning revision: generally, it refers to the preparation of new construction plans after the planning period is adjusted or major changes occur in the upper level planning, and the charge is 100%.
6. All kinds of special research fees can be calculated separately by referring to the relevant provisions of the Standard for the Preparation of Urban Rail Transit Network Planning (GB/T50546-2009).
10.4.3 Evaluation of line network planning and regulatory detailed planning
S/N |
Project category |
Charging standard (ten thousand yuan) |
one |
Evaluation of urban rail transit network planning |
50-80 |
two |
Evaluation on Regulatory Detailed Planning of Urban Rail Transit Land |
40-60 |
Note:
1. The charging standard refers to the Guiding Opinions on Charging of Urban Rail Transit Preliminary Work issued by China Urban Rail Transit Association in 2015.
2. "Planning evaluation" refers to the independent evaluation of the planning results of the rail transit network and its land use planning carried out by the planning consulting unit as a third party under the entrustment of the competent government department or other owners.
3. The fees for the two types of planning and evaluation projects listed in the table are calculated within the above range depending on the complexity of the network and the difficulty of evaluation.
10.4.4 Regulatory detailed planning of urban rail transit land
Project category |
Billing unit price (10000 yuan/km) |
Billing unit price (10000 yuan/set) |
line |
five |
- |
vehicle base |
Comprehensive base |
- |
twenty-five |
Depot |
- |
fifteen |
Parking lot |
- |
ten |
Note:
1. The charging standard refers to the Guiding Opinions on Charging of Urban Rail Transit Preliminary Work issued by China Urban Rail Transit Association in 2015.
2. The engineering scheme study in the regulatory detailed planning of urban rail transit land use should reach the depth of urban rail transit pre feasibility study, and the rail transit land use control should be included in the urban regulatory detailed planning.
3. When the urban rail transit network is complex, the engineering construction conditions are harsh, or there are special requirements in the environment, cultural relics protection, safety, etc., the difficulty adjustment coefficient can be set according to the actual situation, and the adjustment coefficient shall be selected by both parties through negotiation within 1.1-1.5; If necessary, special research will be carried out separately, and the cost will be calculated separately, and the adjustment coefficient will not be considered for the charge of the main report.
4. If there are multiple routing schemes, the cost shall be increased according to the corresponding scale.
5. The above charging scheme is the cost of preparing the main report, and the cost of various special research can be separately calculated by referring to the relevant provisions of the Standard for Preparation of Urban Rail Transit Network Planning (GB/T50546-2009).
10.4.5 Planning and design of areas along urban rail transit
1. Urban level planning guidelines
S/N |
Urban population size (10000 people) |
Billing unit price (10000 yuan/piece) |
one |
big city |
100-300 |
fifty |
300-500 |
one hundred |
two |
megacity |
500-1000 |
one hundred and fifty |
three |
Megacity |
>1000 |
two hundred |
Note:
1. The charging standard refers to the Guiding Opinions on Planning, Design and Charging of Urban Rail Transit Areas along the Line issued by China Urban Rail Transit Association in 2016.
2. The classification of cities in this charge is in accordance with the standards for megacities, megacities and metropolises stipulated in the Notice on Adjusting the Standards for City Scale Classification issued by the State Council.
3. The population size in the table is subject to the population at the end of the planning period.
4. It can be multiplied by a factor of 0.8-1.2 according to the difficulty of the project, regional differences, and the qualification level of the planning and design unit.
5. The charging standard is based on the content and depth requirements specified in the Guidelines for Planning and Design of Areas along Urban Rail Transit (JGH [2015] No. 276) issued by the Ministry of Housing and Urban Rural Development. If the client requires to increase or decrease the content and depth, the charging shall be increased or decreased accordingly.
2. Route level planning guidelines
S/N |
Project category |
Billing unit price (yuan/hectare) |
one |
New urban areas and development zones |
three thousand and five hundred |
two |
Urban built-up area |
four thousand |
Note:
1. The charging standard refers to the Guiding Opinions on Planning, Design and Charging of Urban Rail Transit Areas along the Line issued by China Urban Rail Transit Association in 2016.
2. The charging unit price in the table does not include the plot control planning guidelines. If the entrusting party adds the plot control planning guidelines, the charging unit price will be increased by 500 yuan/hectare respectively.
3. If the schematic diagram of building shape scheme is added, the charging unit price will be increased by 2000 yuan/hectare respectively.
4. If the research on the layout planning of transportation hubs is added, the charging unit price will increase by 200000 to 500000 yuan per hub according to the complexity of transportation hubs.
5. It can be multiplied by a factor of 0.8-1.2 according to the difficulty of the project, regional differences, and the qualification level of the planning and design unit.
6. The charging standard is based on the content and depth requirements specified in the Guidelines for Planning and Design of Areas along Urban Rail Transit (JGH [2015] No. 276) issued by the Ministry of Housing and Urban Rural Development. If the client requires to increase or decrease the content and depth, the charging shall be increased or decreased accordingly.
3. Site level planning and design guidelines
S/N |
Project category |
Billing unit price (yuan/hectare) |
one |
General site |
sixteen thousand |
two |
Other sites |
eighteen thousand |
Note:
1. The charging standard refers to the Guiding Opinions on Planning, Design and Charging of Urban Rail Transit Areas along the Line issued by China Urban Rail Transit Association in 2016.
2. The single building is a type selection scheme. In case of single building scheme design, the cost of building scheme shall be calculated separately.
3. If the client requires to make renderings, models, etc., the cost shall be calculated separately.
4. If the client needs to carry out the constructive general layout design, the cost will be increased by 50%.
5. Other stations refer to hub stations, central stations, group stations, special control stations and end stations in the Guidelines for Planning and Design of Areas Along Urban Rail Transit.
6. It can be multiplied by a factor of 0.8-1.2 according to the difficulty of the project, regional differences, and the qualification level of the planning and design unit.
7. The charging standard is based on the content and depth requirements specified in the Guidelines for Planning and Design of Areas along Urban Rail Transit (JGH [2015] No. 276) issued by the Ministry of Housing and Urban Rural Development. If the client requires to increase or decrease the content and depth, the charging shall be increased or decreased accordingly.
10.4.6 Passenger flow forecast
Work phase |
Freight Basis |
Network planning stage |
Calculated according to 30% - 40% of the charge for the preparation of the master report at the corresponding stage, and no less than 1.2 million yuan |
Recent construction planning stage |
Project feasibility study stage |
Note:
1. The charging standard refers to the Guiding Opinions on Charging of Urban Rail Transit Preliminary Work issued by China Urban Rail Transit Association in 2015.
2. The charging standard is formulated based on the requirements of the Specifications for Passenger Flow Prediction of Urban Rail Transit (to be issued) and relevant regulations on the content and depth of passenger flow prediction.
3. Taking into account the city scale, the construction application scale, the line length, the difficulty of prediction and other factors, the fees are charged within the above range.
4. The above fees do not include the traffic survey fees.
10.4.7 Planning of rail transit station connection facilities
Charging standard for planning conditions of rail station connection design
type |
Charging standard (10000 yuan/place) |
Single track station |
thirty |
Transfer station of two lines and above |
fifty |
Note:
1. The coefficient of 0.8-1.5 times can be multiplied according to the degree of difficulty of the station connection planning and design.
2. The charging standard does not include the current traffic survey, adjustment of surrounding land control plan, traffic simulation and other contents. If the above contents are included, additional fees shall be added according to the specific workload.
Special traffic planning refers to the special planning of urban road system, urban road system, urban conventional public transport, urban pedestrian and bicycle, urban public parking facilities, urban integrated passenger transport hub, urban logistics and freight transport system, urban traffic management and safety, and urban refueling (gas refueling) Special planning for charging pile facilities, etc.
S/N |
City size (10000 people) |
Charging guidance standard (10000 yuan/10000 people) |
one |
Small cities (below 50) |
one point five |
two |
Medium sized cities (50-100) |
1.5-1.2 |
three |
Large cities (100-500) |
With 1.2 million yuan as the base, the planning fee of 8000 yuan will be increased for every 10000 people increased |
four |
Megacities (500-1000) |
With 4.2 million yuan as the base, the planning fee of 6000 yuan will be increased for every 10000 people added |
five |
Megacities (over 1000) |
With 7.2 million yuan as the base, the planning fee of 5000 yuan will be increased for every 10000 people increased |
Note:
1. The depth of special planning is specified in the relevant national professional planning preparation methods.
2. The base price of planning and design is 300000 yuan.
3. The city size is the planned population size determined in the overall urban planning.
4. For cities with intermediate population size, the insertion method can be used for calculation.
5. This charge does not include the cost of organizing and implementing the traffic survey work by the entrusting unit and the cost of purchasing big data resources.
6. If the client has special requirements for a single discipline, it shall multiply by a factor of 1.1-1.3 according to its planning depth and workload increase.
7. The special planning is calculated according to this table and multiplied by the following special coefficients in combination with the specific conditions of each special project: the special planning of urban road system is 1.3-1.5, the special planning of urban road system is 1.3-1.5, the special planning of urban conventional public transport is 1.2-1.3, the special planning of urban comprehensive passenger transport hub is 1.2-1.3, and the special planning of urban walking and cycling is 1.2 The special planning of urban public parking facilities is 1.1, and the coefficient of other special planning is 1.0.
8. Other special plans can be charged according to the work content and planning depth with reference to similar special plans.
9. Different types of planning detailed within the project can be appropriately reduced according to the content and depth.
10. If it is necessary to make passenger flow forecast, it shall be calculated according to 30% - 40% of the charge for the preparation of the master report at the corresponding stage.
S/N |
Land use scale (hectare) |
Charging guidelines (10000 yuan/hectare) |
one |
<10 |
- |
two |
10-50 |
two |
three |
50-100 |
one point eight |
four |
100-300 |
one point five |
five |
300-500 |
zero point seven five |
six |
Over 500 |
one |
Note:
1. The basic price of traffic improvement planning and design is 200000 yuan.
2. If the client requires to reach the depth of the scheme design, it will charge according to the conditions of road traffic facilities.
3. The traffic improvement planning of the above areas can be multiplied by an adjustment coefficient of 1.0-2.0, taking into account the project depth and workload increase.
4. If the client requires traffic simulation, the cost shall be calculated separately.
Project category |
Building scale
(10000 square meters) |
Charging guidelines
(10000 yuan/10000 square meters) |
Charging guidelines
(10000 yuan/place) |
General development projects |
S≤10 |
- |
twenty |
10<S≤20 |
1.8-1.6 |
— |
20<S≤50 |
1.6-1.5 |
— |
50<S≤100 |
1.5-1 |
— |
Greater than 100 |
one |
— |
Transportation projects |
hinge |
— |
thirty |
bus station |
— |
twenty |
Parking lot and others |
— |
fifteen |
Note:
1. Refer to the national standard Technical Standards for Traffic Impact Assessment of Construction Projects for preparation guidelines and other requirements.
2. Difficulty adjustment coefficient: for large commercial and business centers, commercial complexes, supermarkets, conference centers, sports centers, commercial centers and other development projects that have passed the threshold upper limit of the Traffic Impact Assessment of Construction Projects, the fees shall be calculated by a factor of 1.5-1.8, and the fees for traffic simulation shall be charged separately.
3. Transportation projects multiply the adjustment coefficient according to their connecting mode of transportation, such as aviation, railway, port, long-distance and other hubs 2.0-3.0, urban public transport hub 1.0-1.5, initial and terminal bus stations, central stations (parking lots), maintenance yards 1.0-2.0, parking lots 1.0-1.5, etc.
10.8.1 Special traffic investigation
1. The content and depth of the special traffic investigation and analysis report prepared separately shall meet the requirements of the Guidelines for the Preparation of Urban Comprehensive Transport System Planning and the Guidelines for the Traffic Investigation of Urban Comprehensive Transport System Planning.
2. The traffic special investigation and analysis report shall be prepared separately, according to the current urban population of 4000 to 3600 yuan/10000 people.
3. The planning and design base price is 200000 yuan.
4. If the purchase of transportation big data is involved, the cost shall be separately negotiated as the case may be.
5. The above special traffic survey can be multiplied by an adjustment coefficient of 1.2-1.5 in consideration of project depth and workload increase.
10.8.2 Capacity building of urban traffic model
1. The capacity construction of urban traffic model will be carried out separately according to the planned population of 5000 to 10000 yuan/person.
2. The planning and design base price is 500000 yuan.
3. The above work can be multiplied by an adjustment coefficient of 1.2-1.5 in consideration of project depth and workload increase.
10.8.3 Traffic simulation
Project Type |
Charging guidelines |
Vehicle simulation |
Intersection |
150000 yuan/piece |
road |
100000 yuan/km |
Pedestrian simulation |
Single building |
200000 yuan/piece |
Note:
1. The purchase cost of simulation software is not included.
2. The above work can be multiplied by an adjustment coefficient of 1.0-5.0 in consideration of project depth and workload increase.
S/N |
scale
(square kilometers) |
Billing unit price
(10000 yuan/km2) |
one |
Below 20 |
two |
two |
20-50 |
one point six |
three |
50-100 |
one point two |
four |
Above 100 |
zero point eight |
Note:
1. The planning of municipal facilities shall be the depth specified in the relevant national professional planning preparation methods.
2. According to this charging standard, in combination with the specific conditions of each discipline, multiply by the following professional coefficients: power is 1.3, distribution network is 1.8, gas is 0.9, water supply is 1.0, sewage is 1.2, rainwater is 1.0, reclaimed water is 0.6, drinking water source and protection is 0.6, communication (excluding base station) is 0.9, cable TV is 0.6, heating is 1.3, environmental sanitation engineering is 1.1, river water system is 0.9 The lighting is 0.8, and the comprehensive planning of municipal engineering facilities is 1.0. The planning not included in the above special items can be charged by a factor of 0.8-1.2.
3. The base price is 300000 yuan.
4. Carry out relevant special research, and charge no less than 200000 yuan/piece.
5. Energy (facility) planning billing is accumulated according to the content and depth of multiple single planning.
6. This charging standard does not include the cost of statutory planning modification, which shall be calculated separately if necessary.
7. If the municipal facilities or pipelines are only planned at the overall level, 50% of the planning fee will be charged.
S/N |
project |
Billing unit price |
remarks |
one |
Channel blue line alignment |
30000 yuan/km |
Charging base price: 30000 yuan |
two |
Comprehensive river regulation |
200000 yuan/km |
The base price is 50000 yuan. Professional coefficient (divided by river blue line): 0.4 for rivers less than 30m, 0.5-0.7 for rivers 30 to 50m, 0.7-1.0 for rivers 50 to 100m and 1.0 for rivers larger than 100m+ |
three |
Comprehensive municipal pipeline planning scheme |
3000 yuan/piece. km |
Charging base price: 50000 yuan |
four |
Comprehensive municipal pipeline design scheme |
5000 yuan/piece. km |
Charging base price: 50000 yuan |
five |
Municipal pipeline planning and route selection |
15000 yuan/km |
The base price is 50000 yuan. The difficulty coefficient increases by 0.3 for every additional comparison scheme |
six |
Planning and site selection of municipal facilities |
200000 yuan/place |
The difficulty coefficient is 1.0 ± depending on the location conditions, planning content and depth. The difficulty coefficient of independent site selection is 1.0+, and the difficulty coefficient increases by 0.3 for each alternative. If the site selection is basically determined, deepen the control plan, and the difficulty coefficient is 0.5-1.0 |
Note: The difficulty coefficient of 1.0 ± can be considered according to the actual project and working depth. Final charge=billing unit price * quantities * professional coefficient * difficulty coefficient |
S/N |
type |
Billing unit price |
remarks |
one |
Comprehensive planning of pipeline works |
Main road |
50000 yuan/km |
Or charge according to the length of a single pipeline of 6500 yuan/km |
Secondary branch |
45000 yuan/km |
two |
Urban utility tunnel planning |
Urban land area |
70000 yuan/km2 |
|
Main channel |
65000 yuan/km |
Note: The base price is 300000 yuan.
S/N |
Scale (10000 persons) |
Overall planning billing unit price
(10000 yuan/km2) |
Detailed planning of billing unit price
(10000 yuan/km2) |
one |
Below 50 |
two point five |
ten |
two |
50-100 |
two |
nine |
three |
Above 100 |
one point five |
eight |
Note:
1. The base price is 400000 yuan.
2. The planning coordination area shall be charged at 20% - 30% of its charge.
3. If the client requires to establish a separate hydraulic analysis model, it shall be calculated at an additional cost of 40000 yuan/km2.
4. Carry out relevant special research, and the charge is 200000 yuan/piece.
S/N |
City size (10000 people) |
Billing unit price (10000 yuan/km2) |
one |
Small cities (below 50) |
four |
two |
Medium sized cities (50-100) |
three |
three |
Large cities (100-500) |
one point five |
four |
Megacities (500-1000) |
one |
five |
Megacities (more than 1000) |
zero point five |
Note:
1. The classification of cities in this charge is in accordance with the standards for megacities, megacities, large cities, medium-sized cities and small cities specified in the Notice of the State Council on Adjusting the Standards for City Scale Classification (GF [2014] No. 51).
2. The billing is based on the population forecast at the end of the overall planning period.
3. Classified according to the population size, and charged according to the construction land area determined in the overall plan, of which the non construction land area is charged by a factor of 0.1.
4. The planned base price for the protection of historic and cultural cities is 800000 yuan.
5. The city (county) part is charged according to the special topic, and the charge standard of the overall planning special topic in the Guiding Opinions is determined to be 200000 yuan.
The charging scope of protection planning for historic and cultural towns includes two parts: construction land in the town and land within the designated protection scope, which are charged respectively according to the table below.
Town construction land
S/N |
Town construction land scale (square kilometers) |
Billing unit price (10000 yuan/km2) |
one |
Less than 2 |
Not less than the base price of 300000 yuan |
two |
2~10 |
six |
three |
10~20 |
four |
four |
Greater than 20 |
Charged according to historical and cultural city protection planning |
Delimitated protection scope
S/N |
Scope of protection (hectare) |
Billing unit price (10000 yuan/hectare) |
one |
Less than 10 |
Not less than the base price of 300000 yuan |
two |
10~30 |
two point five |
three |
30~50 |
two |
four |
Greater than 50 |
one |
Note:
1. The planned base price for the protection of historic and cultural towns is 600000 yuan.
2. The town area is charged according to the special charge standard in the overall planning of the town in the Guiding Opinions, which is determined as 200000 yuan.
3. The areas that need to prepare plans shall be charged separately according to the plan charging method of historical and cultural blocks.
4. The special research on famous historical and cultural towns is charged at 200000 yuan/piece.
S/N |
Scale (hectare) |
Billing unit price (10000 yuan/hectare) |
one |
Less than 20 |
three |
two |
20~50 |
two point five |
three |
50~100 |
two |
four |
100~200 |
one point five |
five |
Over 200 |
one |
Note:
1. The protection planning of historic and cultural villages is charged according to the area of village construction land, with a base price of 600000 yuan.
2. The preparation of the protection and development plan for traditional villages is required to refer to the protection plan for historic and cultural villages and be simplified in its requirements. Therefore, it is charged according to 0.7 of the protection plan for historic and cultural villages.
It is calculated according to the scale of the planning scope and multiplied by the coefficient of cultural relics type, planning type and other adjustment coefficients.
Billing table for planned key areas
S/N |
Scale (hectare) |
Billing unit price (10000 yuan/hectare) |
one |
Less than 5 |
three point five |
two |
5~10 |
three |
three |
10~20 |
two point five |
four |
20~50 |
two |
five |
50~100 |
one point five |
six |
100~200 |
one |
seven |
200~400 |
zero point eight |
eight |
More than 400 |
zero point five |
Billing table of general planning area
plan
commonly
region |
S/N |
Scale (hectare) |
Billing unit price (10000 yuan/hectare) |
one |
Less than 20 |
one point one |
two |
20-50 |
one |
three |
50-100 |
zero point nine |
four |
100-200 |
zero point seven |
five |
200-500 |
zero point five |
six |
Over 500 |
zero point two five |
Cultural relic type coefficient (used to adjust the billing of key planning areas)
S/N |
Types of cultural relics |
Adjustment factor |
one |
Ancient cultural sites Ancient tombs |
0.5~0.8 |
two |
Ancient Architecture Important historical sites and representative buildings in modern times |
1.0~1.3 |
three |
Grotto temples, stone carvings, murals, etc |
1.5~2.0 |
Note: Similar complexity coefficient is selected for other types.
Planning type coefficient (used to adjust the total billing of key areas and general areas)
S/N |
Planning type |
Adjustment factor |
one |
Outline of the Master Plan for Cultural Relics Protection |
0.3~0.5 |
two |
Environmental improvement planning, display and utilization planning |
0.5~0.7 |
three |
Cultural relics protection planning |
one |
four |
World Heritage Management Plan |
one |
five |
World Heritage Protection and Management Plan (i.e. when the Cultural Relics Protection Plan and World Heritage Management Plan are jointly compiled) |
1.2~1.5 |
12.5 Planning for protection and renovation of historical and cultural blocks and historic areas
S/N |
Scope of protection (hectare) |
Billing unit price (10000 yuan/hectare) |
one |
Less than 10 |
six |
two |
10~30 |
five |
three |
30~50 |
four |
four |
50~100 |
three |
five |
Above 100 |
two |
Note:
1. It can be divided into protection planning and detailed regulation of protection and renovation;
2. Separate preparation of protection plan or detailed protection, renovation and repair plan shall be charged according to this standard.
3. Both are prepared at the same time, and the unit price is charged at a factor of 2.0.
4. The base price is 600000 yuan.
5. If the plan is required to be prepared, 10000 yuan will be added for each hectare or page of the plan.
6. If surveying and mapping and filing of historical buildings are required, the cost shall be calculated separately.
7. If it is required to make solid model and animation, the cost shall be calculated separately.
8. If it is required to prepare a single building scheme, the design cost of the building scheme shall be calculated separately.
The special plans for public services include nine comprehensive special plans for administrative offices, cultural facilities, education and scientific research, sports, health care, social welfare, commercial facilities, housing, tourism, and several individual special plans, as shown in the table below.
S/N |
Comprehensive special planning (general) |
Individual special planning (sub category) |
one |
Special plan for administrative office |
|
two |
Special planning for cultural facilities |
Individual planning of book exhibition facilities |
Single planning of cultural activity facilities |
…… |
three |
Special plan for educational and scientific research facilities |
Individual planning of colleges and universities |
Individual planning of secondary professional schools |
Single planning of primary and secondary school facilities |
Individual planning of special education facilities |
…… |
four |
Special planning for sports facilities |
Individual planning of sports venues |
Individual planning of sports training facilities |
…… |
five |
Special plan for medical and health facilities |
Hospital single planning |
Single planning of health and epidemic prevention facilities |
Individual planning of special medical facilities |
…… |
six |
Special plan for social welfare facilities |
Special planning for nursing homes |
Special planning for welfare homes |
…… |
seven |
Special planning for commercial facilities |
Individual planning of retail commercial facilities (planning of commercial outlets) |
Individual planning of farmers' market |
…… |
eight |
Housing planning |
|
nine |
Tourism planning |
|
The charging standard for comprehensive special plans is 30% of the overall plan, and if the work content of the business plan is included, it is 40% of the overall plan; Special planning for individual items shall be charged at 15% of the overall planning.
The charging base price according to the city size is shown in the following table:
Comprehensive
S/N |
City size
( 10000 people) |
Base price
( 10000 yuan) |
Overall planning reference charging unit price
( 10000 yuan/10000 people) |
one |
small city |
Below 50 |
forty |
six |
two |
Medium-sized city |
50-100 |
seventy-five |
five |
three |
big city |
100-500 |
one hundred and twenty |
four |
four |
megacity |
500-1000 |
four hundred and fifty |
three |
five |
Megacity |
Over 1000 |
consult |
consult |
Single category
S/N |
City size
( 10000 people) |
Base price
( 10000 yuan) |
Overall planning reference charging unit price
( 10000 yuan/10000 people) |
one |
small city |
Below 50 |
twenty |
six |
two |
Medium-sized city |
50-100 |
thirty-five |
five |
three |
big city |
100-500 |
sixty |
four |
four |
megacity |
500-1000 |
two hundred and twenty |
three |
five |
Megacity |
Over 1000 |
consult |
consult |
The special plan for urban comprehensive disaster prevention includes five categories of comprehensive special plans, including earthquake and disaster prevention, flood control and waterlogging prevention, fire protection, civil air defense, and meteorological disaster prevention, as well as several individual special plans, including the layout plan for major hazard sources and the plan for emergency shelters.
The charging standard for comprehensive special plans is 30% of the overall plan, and the charging standard for individual special plans is 15% of the overall plan.
The charging base price according to the city size is shown in the following table:
Comprehensive
S/N |
City size
( 10000 people) |
Base price
( 10000 yuan) |
Overall planning reference charging unit price
( 10000 yuan/10000 people) |
one |
small city |
Below 50 |
forty |
six |
two |
Medium-sized city |
50-100 |
seventy-five |
five |
three |
big city |
100-500 |
one hundred and twenty |
four |
four |
megacity |
500-1000 |
four hundred and fifty |
three |
five |
Megacity |
Over 1000 |
consult |
consult |
Note: If the special urban comprehensive disaster prevention plan is prepared, the coefficient of 1.5 shall be multiplied on the basis of the billing item.
Single category
S/N |
City size
( 10000 people) |
Base price
( 10000 yuan) |
Overall planning reference charging unit price
( 10000 yuan/10000 people) |
one |
small city |
Below 50 |
twenty |
six |
two |
Medium-sized city |
50-100 |
thirty-five |
five |
three |
big city |
100-500 |
sixty |
four |
four |
megacity |
500-1000 |
two hundred and twenty |
three |
five |
Megacity |
Over 1000 |
consult |
consult |
The charging standard for special planning of urban underground space is 30% of the overall planning, and the basic charging price is based on the city size as shown in the following table:
S/N |
City size
( 10000 people) |
Base price
( 10000 yuan) |
Overall planning reference charging unit price
( 10000 yuan/10000 people) |
one |
small city |
Below 50 |
forty |
six |
two |
Medium-sized city |
50-100 |
seventy-five |
five |
three |
big city |
100-500 |
one hundred and twenty |
four |
four |
megacity |
500-1000 |
four hundred and fifty |
three |
five |
Megacity |
Over 1000 |
consult |
consult |
The special planning of ecological environment landscape includes the planning of urban ecology, environmental protection, urban green space system, river system, etc. The charging standard is 30% of the overall planning, and the basic charging price is based on the city size as shown in the following table:
S/N |
City size
( 10000 people) |
Base price
( 10000 yuan) |
Overall planning reference charging unit price
( 10000 yuan/10000 people) |
one |
small city |
Below 50 |
forty |
six |
two |
Medium-sized city |
50-100 |
seventy-five |
five |
three |
big city |
100-500 |
one hundred and twenty |
four |
four |
megacity |
500-1000 |
four hundred and fifty |
three |
five |
Megacity |
Over 1000 |
consult |
consult |
Note: If the urban ecological environment protection plan is prepared, the coefficient of 1.5 shall be multiplied on the basis of the billing item.
The special plans for renewal and transformation include comprehensive special plans for urban renewal, as well as single special plans for the transformation of old cities and shantytowns.
The charging standard for comprehensive special plans is 30% of the overall plan, and that for individual special plans is 15% of the overall plan. The charging base price according to the city size is shown in the following table:
Comprehensive
S/N |
City size
( 10000 people) |
Base price
( 10000 yuan) |
Overall planning reference charging unit price
( 10000 yuan/10000 people) |
one |
small city |
Below 50 |
forty |
six |
two |
Medium-sized city |
50-100 |
seventy-five |
five |
three |
big city |
100-500 |
one hundred and twenty |
four |
four |
megacity |
500-1000 |
four hundred and fifty |
three |
five |
Megacity |
Over 1000 |
consult |
consult |
Single category
S/N |
City size
( 10000 people) |
Base price
( 10000 yuan) |
Overall planning reference charging unit price
( 10000 yuan/10000 people) |
one |
small city |
Below 50 |
twenty |
six |
two |
Medium-sized city |
50-100 |
thirty-five |
five |
three |
big city |
100-500 |
sixty |
four |
four |
megacity |
500-1000 |
two hundred and twenty |
three |
five |
Megacity |
Over 1000 |
consult |
consult |
14.1.1 Detailed control level (construction project) planning, site selection and route selection planning
S/N |
Nature of facilities |
Facility type |
scale |
Billing unit price |
remarks |
one |
Public service facilities |
|
|
100000 yuan/place |
|
two |
Transportation facilities |
Site selection |
Large facilities |
500000 yuan/place |
|
three |
General facilities |
150000 yuan/place |
|
four |
Single line selection |
Railway and rail transit |
30000 yuan/km |
The lowest base price is 100000 yuan |
five |
road engineering |
15000 yuan/km |
The lowest base price is 50000 yuan |
six |
Municipal facilities |
Site selection |
Large facilities |
300000 yuan/place |
|
seven |
General facilities |
150000 yuan/place |
|
eight |
Single line selection |
General pipeline |
15000 yuan/km |
The lowest base price is 50000 yuan |
nine |
Special pipeline |
25000 yuan/km |
The lowest base price is 80000 yuan |
Note:
1. For public service facilities, professional difference coefficient is set, including 1.3 for community service, 1.2 for primary and secondary schools, 1.2 for health care, 0.9 for elderly care, 2.5 for funeral, 0.8 for culture, 0.8 for sports, and 1.0 for the rest.
2. Transportation facilities
(1) Large facilities include airports, railway stations, ports, transportation hubs, etc; Set professional difference coefficient, airport 2.5, railway station 1.5, port 1.5, transportation hub 1.0;
(2) General facilities include rail transit depot, railway operation area, service area, management center, gas station, parking lot, public transport auxiliary facilities, etc; Set professional difference coefficient, including 1.5 for rail transit depot, 1.5 for railway operation area, 1.0 for service area, 0.8 for management center, 0.8 for gas station, 1.2 for parking lot, and 1.0 for auxiliary facilities of public transport;
(3) Professional difference coefficient is set for road works, including 1.5 for expressway, 1.2 for trunk road, 1.0 for secondary trunk road, and 0.8 for branch road (rural road);
(4) Specific channels, such as river crossing tunnels (bridges), underground roads, etc., shall refer to railway and rail transit in single route selection;
(5) If node vertical planning is added for single line selection, the charging unit price will be increased by 30000 yuan/place;
(6) In case of complex road sections in single route selection, the above unit price can be multiplied by the coefficient 1.1-1.3.
3. Municipal facilities
(1) Large facilities include raw water reservoir, rainwater and sewage treatment plant, gas plant, power plant, substation above 500KV level, water conservancy hub, comprehensive waste disposal site, etc; Set professional difference coefficient: 1.5 for raw water reservoir, 1.2 for rainwater and sewage treatment plant, 1.0 for gas plant, 1.2 for power plant, 1.0 for substation above 500KV level, 0.8 for water conservancy hub, and 1.2 for comprehensive waste disposal site;
(2) General facilities include all kinds of special facilities other than those listed above, such as fire station, pump station, pressure regulating station, working shaft, valve chamber, pump gate, machine room, parking facilities, etc., which can be calculated by 0.8-1.5 according to the scale grade;
(3) General pipelines include water supply pipe, gas pipe with pressure ≤ 0.8MPa, rainwater and sewage main pipe, etc; Power supply pipeline refers to the line below 35KV (including 35KV);
(4) Special pipelines include oil pipes, heat pipes, special material pipes, etc;
(5) If node vertical planning is added for single line selection, the charging unit price will be increased by 30000 yuan/place;
(6) In case of complex road sections in single route selection, the above unit price can be multiplied by the coefficient 1.1-1.3.
4. The scheme adjustment shall be charged separately according to the actual workload, generally not less than 30% of the original design charge.
14.1.2 Site selection and route selection planning at general planning level (special planning)
Based on the functional requirements of the planning object, demonstrate the technical indicators such as the starting and ending points, scale, and main node forms of the planning object, and study the land use conditions and implementation conditions of the project site selection and route selection area. The planning depth is consistent with the site selection and route selection planning in the special planning, and provide guidance for the subsequent preparation (or adjustment) of the site selection and route selection planning.
As above 14.1.1 Detailed control level (construction project) planning, site selection and route selection planning The minimum base price is 100000 yuan.
14.2.1 Preparation of design specification
1. 20% of the design charge of each planning level;
2. The charging base price is 100000 yuan;
3. The above costs do not include review costs, which are calculated separately.
14.2.2 Preparation of bidding documents
1. 20% of the bidding object;
2. The charging base price is 250000 yuan;
3. Provide question answering, organize expert review, and organize conference affairs. According to the planning consultation, professor level senior engineer is 5000 yuan/man day, senior engineer is 4000 yuan/man day, and engineer is 3000 yuan/man day.
4. The above expenses do not include conference organization expenses
14.2.3 Preparation of design conditions at the stage of land transfer
1. Calculated according to the detailed planning and design of the plot;
2. The minimum base price is 150000 yuan;
3. The above fees do not include expert review fees, which are calculated separately.
14.2.4 Planning and design conditions for road traffic facilities (Beijing Planning Institute)
Charging standard for detailed planning of transportation facilities
Project category |
Billing unit price |
remarks |
line |
road |
50000 yuan/km |
|
highway |
30000 yuan/km |
|
Intersection |
Grade crossing |
20000 yuan/piece |
|
Grade Separation |
50000 yuan/piece |
|
Traffic organization |
Traffic organization |
10000/ha |
The minimum charge is 100000 yuan |
Other facilities |
Other facilities |
RMB 10000-50000/piece |
|
Note:
1. Different coefficients are used for roads (highways) of different grades, including 1.0 for branch roads (Class III highways), 1.2 for secondary trunk roads (Class II highways), 1.3 for trunk roads (Class I highways), and 1.5 for expressways (expressways).
2. Different coefficients are used for different interchanges, including 1.0 for separated interchanges and 1.5 for interchanges.
The basic cost of planning and design is 200000 yuan.
3. The above table does not include the cost of land adjustment.
4. The above detailed regional traffic control planning can be multiplied by an adjustment coefficient of 1.2-1.5 in consideration of the project depth and workload increase.
5. If it is necessary to make passenger flow forecast, multiply the workload by an adjustment factor of 1.5-1.8.
14.2.5 Planning and design conditions for traffic facilities (excluding roads) (Beijing Planning Institute)
The traffic facilities in this section refer to the site selection and planning conditions of other traffic facilities except roads (highways). The planning conditions of roads (highways) can refer to the relevant provisions of the detailed road traffic planning.
Charging standard for traffic planning conditions of traffic facilities (excluding roads)
S/N |
Project category |
Unit price benchmark (10000 yuan/place) |
one |
Regional comprehensive transportation hub |
eighty |
two |
bus station |
thirty |
three |
Parking lot |
forty |
four |
Filling station |
fifty |
five |
Highway passenger transport hub |
thirty |
six |
Highway freight hub |
thirty |
seven |
other |
twenty |
Note:
1. The regional comprehensive transportation hub can be multiplied by the adjustment coefficient according to its connecting transportation mode and workload, such as aviation hub 2.0-3.0, railway hub 1.5-2.5, rail hub 1.0-2.0, etc.
2. The adjustment coefficient can be multiplied by the type and workload of the bus station. The bus hub is 1.0-2.0, the initial and terminal bus stations are 1.0-1.5, the bus central station (parking lot) is 1.2-1.8, the bus maintenance yard (overhaul plant) is 1.5-2.0, and others are 1.0.
3. The planning conditions of parking lots, gas filling stations, highway passenger transport hubs, highway freight hubs and other transportation facilities can be multiplied by an adjustment factor of 1.0-2.0 according to their types and workload.
15.1.1 Information technology consulting services
1. The content includes big data analysis, data survey report, flow forecast, etc;
2. The billing is calculated and determined according to the unit price (yuan/man day) of expert consultation fee of "XVII. Planning Consultation" and the man days required by the project (man days/piece);
3. The base price of information technology consulting service is 100000 yuan.
15.2.1 Information processing service
S/N |
Project category |
Unit price (yuan/square kilometer) |
remarks |
one |
master plan |
Production of status information |
two thousand |
|
two |
Planning information production |
three thousand |
|
three |
Control planning |
Production of status information |
ten thousand |
|
four |
Planning information production |
fifteen thousand |
|
five |
Special planning |
Production of status information |
five hundred |
|
six |
Planning information production |
six hundred |
|
Note:
1. The unit price of the project refers to the map preparation category in the Charging Standard for Surveying and Mapping Products.
2. The base price is 50000 yuan.
3. The charging in different regions can be adjusted according to different urbanization levels, and the adjustment coefficient is 0.8-1.5.
15.3.1 Data framework technical services
Unit: 10000 yuan
Scale classification
Service category |
Small cities (<500000) |
Medium-sized city (500000 to 1000000) |
Large cities (1-5 million) |
Megacities (5-10 million) |
Megacities (>10 million) |
service content |
Data resource framework construction service |
Establishment of integrated data framework |
ten |
fifteen |
twenty |
forty |
fifty |
According to the data content, three high-level data organization directories are provided: data sub library, data class and data subject. |
Establishment of thematic data framework |
three |
five |
eight |
ten |
ten |
Provide further detailed data organization directory of each thematic data sub topic, data set, etc |
Data specification and standard setting service |
Data standard formulation |
three |
four |
five |
ten |
ten |
Develop data standards one by one according to the thematic data framework |
Note: The city size is the population size determined in the overall urban planning.
15.3.2 Data platform development services
Function module method:
1. It is charged at 50000 yuan per module;
2. The functional modules include data processing, application development, platform display, user management, etc;
3. System platform development cost, excluding data processing, software and hardware purchase;
4. Multiply the coefficient by the size of the city (or region), as shown in the table below.
|
Small cities (<500000) |
Medium sized cities (500000 to 1000000) |
big city
(1 million - 5 million) |
megacity
(5 million to 10 million) |
Megacities (>10 million) |
Module coefficient |
zero point eight |
one |
one point five |
one point eight |
two |
Use information and intelligent means to improve the intelligence level of the whole process of urban planning. The services include data collection platform, information research platform, data analysis platform, public participation platform, planning display platform, and urban operation platform.
Unit: 10000 yuan
|
Small cities (<500000) |
Medium-sized city (500000 to 1000000) |
big city
(1 million - 5 million) |
megacity
(5 million to 10 million) |
Megacities (>10 million) |
Data collection platform |
twenty |
twenty |
thirty |
forty |
fifty |
Information research platform |
twenty |
twenty |
thirty |
forty |
fifty |
Data analysis platform |
thirty |
thirty |
fifty |
sixty |
eighty |
Public participation platform |
twenty |
twenty |
thirty |
forty |
fifty |
Planning exhibition platform |
twenty |
twenty |
thirty |
forty |
fifty |
Urban operation platform |
thirty |
thirty |
fifty |
sixty |
eighty |
Note: The city size is the population size determined in the overall urban planning.
S/N |
City size (10000 people) |
Billing unit price (10000 yuan/km2) |
remarks |
one |
Below 50 (small cities of type II and I) |
0.4~0.5 |
|
two |
50~100 (medium-sized cities) |
0.35~0.4 |
|
three |
100~300 (Type II large cities) |
0.3~0.35 |
|
four |
More than 300 (Type I large cities, megacities and megacities) |
0.2~0.3 |
|
Note:
1. The planning depth refers to the depth of relevant types of planning and research in the overall planning stage.
2. The base price of planning and design is 500000 yuan.
3. The city size is the population size at the end of the planning period determined in the urban master plan.
4. For cities with intermediate population size, the insertion method can be used for calculation.
5. The planning fee is calculated according to the actual area of the research scope.
6. According to the number and type of disciplines covered in the comprehensive research plan, the charging unit price is multiplied by a factor of 1.5-2.0.
Note: The charging unit price shall be adjusted according to the final overall planning charging unit price standard, which shall be 10% - 15% of the overall planning charging unit price.
S/N |
Project category |
Billing unit price (yuan/hectare) |
remarks |
one |
New urban areas and development zones |
three hundred |
|
two |
General urban area |
three hundred and fifty |
|
three |
Key urban areas |
four hundred |
|
Note:
1. The planning depth refers to the depth of relevant types of planning and research in the detailed planning stage.
2. The base price of planning and design is 500000 yuan.
3. The planning fee is calculated according to the actual area of the research scope.
4. According to the number and type of disciplines covered in the comprehensive research plan, the charging unit price is multiplied by a factor of 1.5-2.0.
Note: The billing unit price shall be adjusted according to the final regulatory detailed planning billing unit price standard, which shall be determined according to 10% - 15% of the regulatory detailed planning billing unit price.
S/N |
Project category |
Billing unit price (yuan/hectare) |
remarks |
one |
Key urban areas |
two thousand |
|
two |
Large public buildings |
two thousand and four hundred |
|
three |
Main public buildings and surrounding areas |
two thousand and four hundred |
|
Note:
1. The planning depth refers to the depth of relevant types of planning and research in the construction detailed planning stage.
2. The base price of planning and design is 500000 yuan.
3. The planning fee is calculated according to the actual construction land area.
4. According to the number and type of disciplines covered in the comprehensive research plan, the charging unit price is multiplied by a factor of 1.5-2.0.
Note: The charging unit price shall be adjusted according to the final charging unit price standard of the detailed construction planning, and shall be determined according to 10% - 15% of the charging unit price of the detailed construction planning.
1. The preparation of bidding documents refers to the service items (original Guiding Opinions) prepared by the planning and design unit for the management department or other owners to plan the bidding documents.
2. The preparation of bidding documents shall be charged at 5% - 10% of the project planning and design fees. If the planning and design cost is less than 500000 yuan, 10% will be taken; If the planned design cost is more than 500000 yuan, 5% will be taken. (The original Guiding Opinions will not be adjusted)
3. The base price for preparing the bid is 50000 yuan.
1. The planned base bid price refers to the minimum cost paid by the owner to the bidder for the bidding scheme that fails to win the bid but meets the bidding requirements when planning bidding (the original Guiding Opinions).
2. For the qualification selection/qualification shortlisted bidding, the planned base bid price may not be set.
3. For the bidding with technical scheme, for the bidding scheme that fails to win the bid but meets the bidding requirements, the base bid compensation fee must be set, which is calculated as 20% - 45% of the project planning and design cost budget (increase the proportion to distinguish the technical quality).