home page  >  Product supply  >  Fine chemical industry >Waterproof and leakage stoppage of dam of supply reservoir/leakage stoppage of construction joint
  •  Waterproof and leakage stoppage of dam of supply reservoir/leakage stoppage of construction joint
  •  Waterproof and leakage stoppage of dam of supply reservoir/leakage stoppage of construction joint

Waterproof and leakage stoppage of dam of supply reservoir/leakage stoppage of construction joint

Price

Electric discussion

  • Minimum order quantity: unlimited
  • Location: Yancheng, Jiangsu
  • Price: electricity
  • Total supply:
  • Delivery period: 3 days
  • Release time: 2024-06-19 00:00:45

(When contacting me, please specify that the Building materials network See, there will be a discount! Thank you!)

Warm reminder: Consumers are requested to take epidemic prevention measures for international packages. The goods need three licenses and one report for imported goods (supplier's license, entry quarantine certificate, preventive disinfection certificate and NCV nucleic acid test report)

Detailed description

Xinda Company is one of the few comprehensive enterprises integrating the research, development and construction of waterproof and plugging technology in China. It has more than 40 years of construction experience. In recent years, it has introduced advanced waterproof and plugging technology and equipment from abroad, and constantly improved the waterproof and plugging construction process, as well as the innovation of plugging technology, and professionally treated all kinds of leakage, especially for cracks in mass concrete, water leakage, tunnel engineering, and settlement expansion joint It has many years of successful experience in dealing with water leakage, has the ability to prevent water leakage with high difficulty, and has construction achievements all over the country.
The company is specialized in leak stoppage construction and has a group of professional leak stoppage technicians.
Professional undertaking:
1. Structure, construction, settlement, expansion joint, water leakage and waterproof plugging construction of expressway, seabed, river crossing, ground * * * tunnel engineering.
2. Leakage and plugging construction of concrete structures such as underground foundation construction works, subway works, civil air defense works, sewage treatment pool, bottom plate, etc.
3. Basement, underground garage, underground passage, thermal power The Conduit , foundation pit and other underground works.
4. Pool Cable Trenches and pits, mine passages Elevator. Well and foundation pit works Construction joint Construction of leakage plugging with water.
5. Anti corrosion and leak stoppage construction for leakage treatment of concrete structure, cooling tower circulation channel, pipeline and sewage treatment pool works.
6. Leakage control and plugging construction of culverts, open caissons, pump houses, dams, bridge decks, roofs, tunnels, water intake and drainage works.
7. Grouting of reservoir dam body of water conservancy and hydropower projects, leak stopping and seepage prevention of water conveyance tunnel cracks, and seepage prevention and reinforcement of dam concrete cracks.
8. Coal conveying system, coal conveying bridge, drilling, oil well wall protection, and shaft concrete crack leakage water plugging and reinforcement of geological drilling engineering.
Our company adheres to the people-oriented principle, follows the purpose of "quality first, owner first, contract abiding, quality service", and pays regular return visits!
Warmly welcome enterprises, institutions and individuals to negotiate.
Quality first, owner first, contract abiding, quality service, regular return visit

  •  Business license

    Business license

  •  Waterproof qualification

    Waterproof qualification

I want to comment

Negative comments such as slander, malicious attack, unsubstantiated and non positive energy will be deleted by the administrator. Your comments may be of high reference value to others.

Related comments

Well received
0%
Neutral comment
0%
negative comment
0%
    / Number of records: 98   home page previous page next page Last

    Disclaimer: The information shown above is provided by the enterprise itself, and the authenticity, accuracy and legality of the content are the responsibility of the publishing enterprise. www.chinabuildingmaterials. com does not assume any guarantee responsibility for this. In order to protect your interests, we suggest you choose the building materials link member of China Building Materials Network. Friendly reminder: New and old users are requested to strengthen the screening of the authenticity of information and the identity and qualification of its publisher to avoid unnecessary disputes and losses!

    Risk warning: Entrepreneurship is risky and investment should be cautious. Fight against investment fraud and create a platform of integrity. Right protection report: 400-88-59137.

    Jiangsu Xinda High Altitude Engineering Co., Ltd

    Building Materials General

    six year

    Certified
    • Enterprise type:

      Construction enterprises

    • Business model:

      Business services

    • Honors and qualifications:

      2 items

    • Main business:

      Leakage stoppage company, basement leakage stoppage, sewage tank leakage stoppage, sewage pipe leakage stoppage, expansion joint leakage stoppage, cable trench leakage stoppage, tunnel leakage stoppage, underground pipe gallery leakage stoppage

    • Address:

      South of Dongjin Road, Yandu District, Yancheng, Jiangsu

    I want to join

    Online inquiry
    • Jiangsu Xinda High Altitude Engineering Co., Ltd

    • Waterproof and leakage stoppage of dam of supply reservoir/leakage stoppage of construction joint