home page  >  Product supply  >  Masonry materials  >  Concrete products  >  Other concrete products >Leakage repair of basement wall corner - leakage repair of basement wall
  •  Leakage repair of basement wall corner - leakage repair of basement wall
  •  Leakage repair of basement wall corner - leakage repair of basement wall
  •  Leakage repair of basement wall corner - leakage repair of basement wall
  •  Leakage repair of basement wall corner - leakage repair of basement wall
  •  Leakage repair of basement wall corner - leakage repair of basement wall
  •  Leakage repair of basement wall corner - leakage repair of basement wall
  •  Leakage repair of basement wall corner - leakage repair of basement wall
  •  Leakage repair of basement wall corner - leakage repair of basement wall
  •  Leakage repair of basement wall corner - leakage repair of basement wall
  •  Leakage repair of basement wall corner - leakage repair of basement wall

Leakage repair of basement wall corner - leakage repair of basement wall

Price

Electric discussion

  • Minimum order quantity: 100 sets
  • Location: Yancheng, Jiangsu
  • Price: electricity
  • Total supply: 1000000 sets
  • Delivery period: 30 days
  • Published on: April 2, 2021 11:04:10

(When contacting me, please specify that the Building materials network See, there will be a discount! Thank you!)

Warm reminder: Consumers are requested to take epidemic prevention measures for international packages. The goods need three licenses and one report for imported goods (supplier's license, entry quarantine certificate, preventive disinfection certificate and NCV nucleic acid test report)

Detailed description

  • Place of Origin:

    Jiangsu

  • texture of material:

    Lightweight aggregate concrete

  • appearance:

    other

Leakage repair of basement wall corner - leakage repair of basement wall

Our company is specialized in: basement leakage plugging, underground garage leakage plugging, underground engineering leakage plugging, subway station leakage plugging, tunnel leakage plugging, The Conduit Leakage stoppage, culvert leakage stoppage, tunnel leakage stoppage, sewage pool leakage stoppage, pool leakage stoppage, water leakage stoppage, pressure leakage stoppage, valve Plugging under pressure, Cable Leakage stoppage in trench, dock platform, civil air defense works, expansion joint Leakage plugging, joint leakage plugging, fracture leakage plugging, Settlement joint Leakage plugging, construction joint leakage plugging, dam crack plugging, pump house plugging, elevator shaft plugging, cable shaft plugging, mine plugging, valve shaft plugging, cooling tower plugging, cooling tower plugging, cooling tower plugging and other waterproof plugging projects. Our professional construction teams are all over the country. Welcome to call us for consultation. Telephone service is available 24 hours a day. A written quotation is sent one hour after the call. The project tasks are completed on time and with quality guaranteed. Regular return visits are provided and the whole country is jointly guaranteed. Looking forward to your cooperation!

 
Importance of plugging: underground works mainly include basements of industrial and civil buildings, underground garages, underground tunnels, underground tunnels, etc. In underground engineering, it is common for water leakage to occur in projects under construction or completed due to factors such as poor design, improper structural treatment, poor material selection, poor construction quality, foundation subsidence, and changes in hydrogeology near the project caused by human or natural disasters. If it is not treated in time, the project progress, use function and even the safety of the project structure will be affected.  
Our company's professional leak stoppage technology: "polymer grouting waterproof leak stoppage technology". Our company adopts the technology developed by professional waterproof and anti-corrosion material manufacturers and several important scientific research institutions for many years. It uses a variety of imported chemical materials, and according to the size of the construction water flow pressure, it is made into a liquid with almost the same viscosity as water. With good permeability, it can be injected into 0.1mm concrete slit, and quickly agglomerate under water pressure and very humid environment. The setting time can be accurately controlled within a few seconds or several minutes according to the proportion, and can be quickly condensed under the condition of high water speed, pressure and water flow. Good impermeability, water swelling after drying shrinkage, insoluble in water, kerosene, gasoline and other agricultural production system solvents, resistant to acid, alkali, bacteria, and not affected by atmospheric conditions, with certain strength, elasticity and pressure change, and guaranteed for use for more than 10 years. With strong tensile strength, the cracks that have been plugged will not leak if normal settlement or dislocation cracks occur in the future.
 
The specific construction method of plugging: the back water back pressure plugging method includes grouting method and caulking method. First, chisel a week around the junction between the leakage and the cement, chisel the cement into a 3.5 * 4.5 U-shaped joint and each leak at the plane leakage into a U-shaped joint, clean the surface of the leakage layer, and then use quick setting water stop materials to bury pipes, draw pipes, and divert water for flow reduction. The groove does not need to be filled at a time, so as to leave room for caulking. A bamboo joint (grouting nozzle) is set every certain distance, After the quick setting material reaches a certain strength, the elastic plugging slurry can be poured into the bamboo joint by back pressure until the deformation joint no longer flows out of water. The rapid setting material will expand in case of water, and then the upper part of the concave handle of the deformation joint of the water stop will be filled with castable to compact the surface layer. The combination of material waterproof and structural waterproof, that is, the combination of rigid and flexible long-term waterproof plugging technology.
Specific construction process of plugging:
 
1. The joint shall be chiseled according to the quantities of * * * required by Party A.   
 
2. Clean the leaking parts and chisel the leaking joints into U-shaped joints.   
 
3. Milling the leakage joint, embedding the bamboo joint, cleaning the leakage joint, filling the plugging material, installing the suction pipe and bamboo joint (grouting nozzle).  
 
4. Diversion, decompression, reduction of water flow, control of water leakage points, change large water flow into small water flow, and make small water flow out of the installed diversion pipe.   
 
5. Ingredients: several reagents are mixed into two groups of mixed slurry, and the setting time of ingredients is determined according to the amount of water leakage.   
 
6. Back pressure grouting: the pressure of grouting must be greater than the pressure of water leakage, so that the water can be pushed back and infiltrated into the capillary joints of the leaking rock. When encountering water, it will expand and set quickly to achieve long-term deep water stop effect.   
 
7. Dig out the bamboo knots (or not) and fill them directly with plugging materials.   
 
8. After surface treatment and no leakage through self inspection, the surface slurry shall be scraped flat.
 
With advanced technology, scientific management and excellent construction team, our company strives to win with quality and keep improving. We are willing to establish various forms of cooperation with friends from all walks of life.

Leakage repair of basement wall corner - leakage repair of basement wall

  •  Business license

    Business license

  •  Waterproof qualification

    Waterproof qualification

I want to comment

Negative comments such as slander, malicious attack, unsubstantiated and non positive energy will be deleted by the administrator. Your comments may be of high reference value to others.

Related comments

Well received
0%
Neutral comment
0%
negative comment
0%
    / Number of records: 98   home page previous page next page Last

    Disclaimer: The information shown above is provided by the enterprise itself, and the authenticity, accuracy and legality of the content are the responsibility of the publishing enterprise. www.chinabuildingmaterials. com does not assume any guarantee responsibility for this. In order to protect your interests, we suggest you choose the building materials link member of China Building Materials Network. Friendly reminder: New and old users are requested to strengthen the screening of the authenticity of information and the identity and qualification of its publisher to avoid unnecessary disputes and losses!

    Risk warning: Entrepreneurship is risky and investment should be cautious. Fight against investment fraud and create a platform of integrity. Right protection report: 400-88-59137.

    Jiangsu Xinda High Altitude Engineering Co., Ltd

    Building Materials General

    six year

    Certified
    • Enterprise type:

      Construction enterprises

    • Business model:

      Business services

    • Honors and qualifications:

      2 items

    • Main business:

      Leakage stoppage company, basement leakage stoppage, sewage tank leakage stoppage, sewage pipe leakage stoppage, expansion joint leakage stoppage, cable trench leakage stoppage, tunnel leakage stoppage, underground pipe gallery leakage stoppage

    • Address:

      South of Dongjin Road, Yandu District, Yancheng, Jiangsu

    I want to join

    Online inquiry
    • Jiangsu Xinda High Altitude Engineering Co., Ltd

    • Leakage repair of basement wall corner - leakage repair of basement wall