home page  >  News Center  >  Industry trends >Treatment scheme for water leakage and leakage stoppage of culvert cover slab Grouting and leakage stoppage treatment of pedestrian walkway

Treatment scheme for water leakage and leakage stoppage of culvert cover slab Grouting and leakage stoppage treatment of pedestrian walkway

2024/5/11 18:48:59 Source: Jiangsu Xinda High Altitude Engineering Co., Ltd Views: one hundred and six

Treatment scheme for water leakage and leakage stoppage of culvert cover slab Grouting and leakage stoppage treatment of pedestrian walkway culvert The following methods can be referred to for the treatment scheme of cover plate leakage and the grouting treatment of pedestrian walkway:

1. Find out the leakage of culvert cover plate The water causes shall be repaired accordingly.
2. If the cracks are caused by uneven settlement of the foundation under the cover plate, the cracks need to be reinforced Mark one meter on both sides of the gap, and then fill it with cement mortar for reinforcement.
3. If the water leakage is caused by cracks in the cover plate due to aging, it is necessary to replace the aging part. Note that all the original covers must be replaced during construction.
4. If grouting method is used to strengthen the leakage of foundation and cover plate, epoxy resin and other grouting materials can be used for grouting, After grouting, the foundation can be effectively strengthened to avoid other problems later.
5. For grouting and plugging of pedestrian walkways, the accumulated water can be removed first, and then cement mortar can be used to strengthen and harden the ground. For the crack part, professional tools can be used to seal it, and then appropriate grouting materials can be selected for grouting treatment.

The above scheme is only for reference, and the specific situation may vary due to different site conditions, so it is recommended to consult professional engineers and handle according to the actual situation. Treatment scheme for water leakage and leakage stoppage of culvert cover slab Grouting and leakage stoppage treatment of pedestrian walkway

Disclaimer: Hangzhou Shangyi Information Technology Co., Ltd. does not declare or guarantee the correctness or reliability of all information published on CNBM Online; You hereby accept and acknowledge that you shall bear the risk arising from reliance on any information. Hangzhou Shangyi Information Technology Co., Ltd. has the right but not the obligation to improve or correct errors or omissions in any part of the information published.

News classification

Jiangsu Xinda High Altitude Engineering Co., Ltd

Building Materials General

six year

Certified
  • Enterprise type:

    Construction enterprises

  • Business model:

    Business services

  • Honors and qualifications:

    2 items

  • Main business:

    Leakage stoppage company, basement leakage stoppage, sewage tank leakage stoppage, sewage pipe leakage stoppage, expansion joint leakage stoppage, cable trench leakage stoppage, tunnel leakage stoppage, underground pipe gallery leakage stoppage

  • Address:

    South of Dongjin Road, Yandu District, Yancheng, Jiangsu

I want to join