Shear wall main structure template, construction template, construction method template, Zhubang Hongsheng, customized by the manufacturer pin
Process display: concrete shear wall forming, concrete Construction joint Roughening, beam and slab reinforcement binding, coupling reinforcement binding, finished stirrup, finished cushion block, cement Strip support, formwork support (including cross bridging), formwork support, screw hole waterproof plugging (PVC casing removed foaming agent Packed waterproof mortar JS waterproof plugging), double nut reinforcement, double steel pipe reinforcement and other processes. Concealed column, main reinforcement, stirrup, longitudinal distribution reinforcement and horizontal distribution reinforcement of shear wall shall be bound outside; Beam, upper longitudinal reinforcement of main reinforcement, lower longitudinal reinforcement, stirrup, and slab reinforcement are arranged in a two-way orthogonal manner);