home page  >  News Center >Event promotion

Event promotion

  • Use of underground fire water tank in Emeishan, Sichuan

    The underground fire water tank in Emeishan, Sichuan uses the underground fire water tank * floating 1. The channel steel of the water tank is welded into a mesh with * * quality channel steel. After removing the rust, the paint is brushed and anti-corrosion treatment is done. 2. The bottom plate under the water tank is also under uniform pressure, which can play a good role in conducting pressure, so it is generally not deformed. 3. The stainless steel water trough will concentrate the dewed water droplets in the water tank and then flow to the place where the water is discharged, so it can well keep the channel steel free from moisture and rust. 4. The side plate of the water tank is made like a trapezoid, which can not only improve the strength of the plate, but also has no inner wall

    2022/03/23 09:26:05
  • Shanxi Houma Integrated Prefabricated Pump Station FRP

    The deterioration of FRP environment in Shanxi Houma integrated prefabricated pump station is becoming more and more serious, and the water pollution is also very serious. The integrated pump station can effectively overcome the shortcomings of the traditional pump station. It is needed for the help of rainwater, domestic sewage, or industrial wastewater. The layout of the integrated pump station shall meet the following requirements: 1. Meet the requirements for the layout, installation, operation and maintenance of electromechanical equipment; 2 Meet the requirements of structural layout; 3 Meet the requirements of ventilation, heating and daylighting, and comply with the technical regulations on damp proof, fire prevention, noise prevention, energy conservation, labor and industrial hygiene; 4 Meet the transportation requirements; 5. Make the layout beautiful and coordinate with the surrounding environment

    2022/03/22 10:14:19
  • Construction of underground fire water tank in Langzhong, Sichuan

    Construction of underground fire water tank in Langzhong, Sichuan The underground fire water tank is assembled by BDF veneer, sealing materials, metal components and piping system, and has the following characteristics: 1. The combination size is arbitrary. The 0.125-1000m3 water tank can be assembled according to the user's needs. 2. The water tank is sealed with a specially developed finalized product - sealing belt, which has the advantages of water resistance, oxidation resistance and good sealing performance. The service life is more than 50 years. 3. The water tank is in good sanitary condition. The part in contact with water is molded with * * stainless steel sheet. 4. The structural strength of the water tank is high. The reinforced part is molded with galvanized steel plate

    2022/03/22 09:14:32
  • Sichuan Mianzhu Buried Fire Water Tank Operation

    Sichuan Mianzhu Buried Fire Water Tank Operating BDF Water Tank Features: 1. Corrosion resistance: The inner layer of the composite plate is made of SUS304 food grade stainless steel, with high corrosion resistance. The outer layer is made of hot-dip galvanized steel plate. After installing the finished product, it is coated with anti-corrosion paint, which has multiple corrosion resistance. 2. Strength: galvanized steel plate has good internal and external pressure. 3. Ideal mechanical structure: from a mechanical point of view, the protruding part of the double water tank adopts a sphere. 4. No leakage: * * structure design, no welding combination on site. High strength, good sealing, prevent secondary pollution of water quality. 5. Easy construction: users can propose water according to design needs

    2022/03/21 10:05:01
  • Lifting of Shanxi Lucheng Integrated Prefabricated Pump Station

    The grid must be set before lifting the pump house of the integrated pump station in Shanxi Lucheng Integrated Prefabricated Pump Station. When screw pumps and submersible pumps are used, fine grids can be set. The setting of grids shall be determined according to the scale of integrated pump station, inlet pipe, grid decontamination method and other factors. The grid well can be set separately or in the collecting basin. The grating should be mechanically removed. There should be no less than two sets of trash removers, which should be used as standby for each other when necessary. The mechanical grating shall be equipped with corresponding bulkhead gate. The total width of the grid should not be less than 2 times the width of the inlet pipe channel. The material should be stainless steel or flat steel. The gap width between grid bars shall be determined according to the requirements of water pump. General gap width

    2022/03/19 09:30:44
  • Flow of underground fire water tank in Pengzhou, Sichuan

    Sichuan Pengzhou buried fire water tank flow anti floating fire tank pump buried water tank consists of what? The underground water tank of anti floating fire box pump is composed of pipeline, valve, water pump, air pressure tank, pressure transmission, frequency conversion control cabinet, air pressure tank and control room, and it becomes the pump station in combination with the water tank. What is the equipment of buried tank pump? BDF bolted water tank; Material: 4mm/3mm hot-dip galvanized steel plate and 0.4mm304-2B stainless steel composite; It is connected by bolts, battens, angle steel and other accessories. The internal tie bars and station columns are DN50 galvanized pipes. Due to the constant pressure water supply of buried tank pump

    2022/03/18 10:30:16
  • Assembled underground fire water tank in Chongzhou, Sichuan

    More and more underground tank pump integrated fire water supply equipment (pump stations) in Chongzhou, Sichuan Province have entered the normal use stage, and the product quality is uneven. Many problems occurred in the process of use, as follows: 1. The integrated equipment of underground box pump is designed as the pump room of the pipe pump compartment, so the components of the control cabinet are prone to failure in the humid environment, and the service life is reduced. Many manufacturers add dehumidifiers, axial flow fans and ventilation hoods, but the actual effect is not ideal. It is recommended to make the control cabinet an outdoor unit. 2. * Pipeline pump compartment pump room is adopted for floating buried tank pump integration equipment

    2022/03/17 10:33:53
  • Construction of underground fire water tank in Yima, Henan

    Henan Yima Buried Fire Water Tank Construction BDF Water Tank Assembly Method 1. First assemble the molded plates, use bolts and sealing rings to seal the plates, and screw the bolts according to the size of the water tank length × width × height; 2. After the assembly and combination of several plates, the bottom plate shall be assembled. First, the size of the bottom plate of the water tank shall be determined, and then the bottom plate shall be laid on the water tank foundation for sealing connection. After the bottom plate is connected, the sealing place shall be subject to fire oil inspection or visual inspection; 3. After the bottom plate is connected, the wall plate and the bottom plate are connected. For the bolt connection, one side is placed on the bottom plate of the water tank. After the four walls are placed, press

    2022/03/16 10:08:31
  • Henan Yuzhou buried fire water tank has no bottom plate

    The internal details of the underground fire water tank without baseplate in Yuzhou, Henan Province mainly include: (1) tie bars (2) station columns (3) battens (4) screws (5) accessories: manhole, ladder, sump, anti-corrosion treatment, etc. (6) Pump room: the pump room is reinforced with reinforced I-steel, and 14 # I-steel is used for reinforcement. The integrated installation sequence of underground fire pool water pump: 1. The integrated set of underground fire pool water pump has been transported to the site, and the motor has been installed with the base. It is unnecessary to remove the pump and motor when finding the flat base. 2. Place the base on the foundation and pad wedges near the foundation screws

    2022/03/15 10:01:32
  • Henan Huixian buried fire pool assembly type

    The product features of the assembled underground fire pool in Huixian County, Henan Province 1. The investment in the underground fire pool is small: the equipment occupies a small area, without the need to build a pump house, a large reservoir or a large water tank, saving a lot of money * * Make full use of the primary water supply pressure of the tap water pipe network, reduce the selection of the booster pump, and reduce the equipment * *. 2. The underground fire pool is sanitary and free of pollution: the water tank is made of food grade stainless steel, and the water in the tank can be automatically circulated regularly without secondary pollution. 3. The underground fire pool has obvious energy-saving effect: the equipment is connected with the tap water pipe network in series to supply water by using the residual pressure of the pipe network; And because of the type selection of the booster pump

    2022/03/14 11:11:01

Jiangsu Yuxuan Automation Equipment Co., Ltd

Building Materials General

five year

Certified
  • Enterprise type:

    Others

  • Business model:

    Production and processing

  • Honors and qualifications:

    0 items

  • Main business:

    Integrated prefabricated pump station, integrated pump station, integrated sewage lift pump station, buried fire water tank, buried fire pool, buried tank pump integration, sewage treatment equipment and environmental protection equipment

  • Address:

    No. 12, Jianxian Road, Jianhu County, Yancheng, Jiangsu

I want to join

 Personal WeChat