home page  >  News Center >Event promotion

Event promotion

  • Construction of Shandong Pingdu Integrated Prefabricated Pump Station

    Selection of grid for construction of integrated prefabricated pump station of Shandong Pingdu Integrated Prefabricated Pump Station: In fact, the selection and purchase of grid is mainly based on the environment of the project site and other factors. The following is a brief introduction of the difference between basket grid and crushing grid. The integrated prefabricated pump station generally adopts two schemes in terms of grid, one is basket grid, the other is crushing grid. What they have in common is that they are all designed to intercept sundries at the water inlet of the integrated sewage pump station to prevent more sundries from blocking the submersible sewage pump and pipeline. The difference is that the basket grille needs to be manually lifted up through the rail chain when there are many sundries intercepted

    2022/05/30 14:39:03
  • Construction of underground fire water tank in Xinyi, Jiangsu

    Jiangsu Xinyi buried fire water tank construction The internal details of the buried fire water tank mainly include: (1) tie bars (2) station columns (3) battens (4) screws (5) accessories: manhole, ladder, sump, anti-corrosion treatment, etc. (6) Pump room: the pump room is reinforced with reinforced I-steel, and 14 # I-steel is used for reinforcement. Internal details of underground fire pool 1. Φ 10 * 30 hot-dip galvanized screws and environmental water resistant * * * rubber strips are assembled. 2. The outlet pipe of the fire system uses dual outlet pipes. 3. The water tank module uses hot-dip galvanized steel plate 3mm and 0.4mm304/2B food

    2022/05/30 14:36:26
  • Assembly type of buried fire water tank in Pizhou, Jiangsu

    Assembly method of prefabricated BDF water tank for underground fire water tank in Pizhou, Jiangsu 1. First assemble and assemble the molded plates, use the process of sealing and connecting the plates with bolts and sealing rings, and screw the bolts according to the size of the water tank length × width × height; 2. After the assembly and combination of several plates, the bottom plate shall be assembled. First, the size of the bottom plate of the water tank shall be determined, and then the bottom plate shall be laid on the water tank foundation for sealing connection. After the bottom plate is connected, the sealing place shall be subject to fire oil inspection or visual inspection; 3. After the bottom plate is connected, the wall plate and the bottom plate are connected. For the bolt connection, one side of the wall is placed on the bottom plate of the water tank first, and then the four walls are placed

    2022/05/30 14:35:23
  • Jiangsu Wuxi buried fire water tank assembly type

    Wuxi, Jiangsu Buried Fire Water Tank Assembled Buried Fire Water Tank Product Features: 1. Complete varieties and specifications, can be matched at will, and has a wide range of applications; 2. Compact structure, small size, less land occupation, no need to build high-level water tank or water tower, * * saving, fast installation, convenient for centralized management; 3. Normal pressure water supply of pipe network can avoid frost cracking of exposed pipes; The water supply pressure of the equipment can be adjusted as required to meet the water pressure requirements of the top floor of the building during peak water consumption. 4. The * port frequency converter and related components are adopted, with reasonable design, simple operation, reliable performance and automatic operation; 5. Direct water supply to users, without secondary pollution; 6. With

    2022/05/27 08:51:37
  • No baseplate for buried fire water tank in Zhenjiang, Jiangsu

    The advantages of the underground fire water tank without baseplate in Zhenjiang, Jiangsu are as follows: 1. The underground fire water tank saves space: the pump and pump room are placed in the water tank and fixed on the module of the integrated pump station * *. Generally, only 0.5~1.5m of water tank volume is occupied. 2. The underground fire pool is easy to move and disassemble, and has a long service life: because of the use of fabricated stainless steel water tank, the previous welding method has been changed, and the screw assembly is adopted, which has strong applicability, convenient installation, and no * * equipment is required. 3. The underground fire pool is easy to empty: because of the new submersible fire pump, it can be directly placed in the

    2022/05/26 09:07:29
  • Shandong Weifang Integrated Prefabricated Pump Station FRP

    The FRP sewage lift pump station of Weifang integrated prefabricated pump station in Shandong Province is a large sewage lifting equipment often required for urban construction, commonly used in industries, buildings, gardens, etc. Rainwater, daily sewage, daily wastewater, etc. can be collected and discharged to the * * area for treatment or reuse. So, what aspects should we consider when using the integrated sewage lift pump station? Next, Jiangsu Yuxuan will introduce how to use the integrated prefabricated pump station. 1. The scale of sewage pump station, the planning of sewage pump station, and the cylinder specification of prefabricated pump station shall be determined according to the far and near term sewage volume

    2022/05/23 10:20:30
  • Construction of Shandong Dongying Integrated Prefabricated Pump Station

    Shandong Dongying Integrated Prefabricated Pump Station Construction Prefabricated pump station construction is still the key point in the whole process. The purchased equipment and raw materials shall be inspected for basic testing, and then transported to the site for use after they are confirmed to be qualified. Generally, in the process of on-site assembly and construction of integrated prefabricated pump station equipment, relevant * * technicians will guide on the site, and test and inspect the assembled equipment in a timely manner to see whether it meets the standards, whether it can be used normally, and if problems are found, it can be corrected in a timely manner. After the construction is completed, it can be delivered to the user for trial testing, and the user is satisfied with it. The pump station is used for

    2022/05/21 09:16:40
  • Jiangsu Xuzhou buried fire water tank assembly type

    Jiangsu Xuzhou Buried Fire Water Tank Assembled Buried Fire Water Tank: 1. The channel steel of the underground fire water tank is welded into a mesh with * * type channel steel. After rust is removed, the paint is brushed and anti-corrosion treatment is done. 2. The bottom plate under the underground fire pool is also under uniform pressure, which can play a good role in conducting pressure, so it is generally not deformed. 3. The stainless steel water trough will concentrate the dewed water droplets in the water tank and then flow to the drainage place, so it can well keep the channel steel free from moisture and rust. 4. The side plate of the underground fire pool is made into a trapezoid, which not only can

    2022/05/21 09:00:18
  • Shandong Dezhou Integrated Prefabricated Pump Station FRP

    At present, many places in Shandong Dezhou integrated prefabricated pump station will bury the integrated sewage pump station underground for installation and application, so that the equipment can achieve better sewage treatment process during operation, and can also provide convenient conditions for environmental cleaning. In recent years, the industry field of installing and using this kind of equipment is also increasing, so now the application of integrated sewage pump equipment has attracted much attention. When installing products, it is also necessary to have a detailed understanding of the operation methods and processes, which can achieve better application results. What operation methods should be paid attention to when installing the integrated sewage pump station? First, we need to pay attention to

    2022/05/20 09:16:23
  • Water supply by underground fire water tank in Nanjing, Jiangsu

    Introduction to the production of underground fire water tank in Nanjing, Jiangsu Province? The water tank of the underground integrated pump station with box pump, the external guard board of the pump house, the top plate and the bottom plate of the water tank of the ground pump station are assembled from large module box plates. Large module box plate is made of hot-dip galvanized steel plate, stainless steel plate or composite steel plate composed of hot-dip galvanized steel plate and stainless steel plate. The underground integrated pump station is mainly composed of water tank and smart pump room. We use fabricated bolts to assemble the stainless steel water tank. The part in contact with water must be food grade 304 stainless steel 2B, and the external reinforcement part is made of hot-dip galvanized steel plate* Floating buried integrated equipment adopts pipeline pump isolation

    2022/05/20 09:13:19

News classification

Jiangsu Yuxuan Automation Equipment Co., Ltd

Building Materials General

five year

Certified
  • Enterprise type:

    Others

  • Business model:

    Production and processing

  • Honors and qualifications:

    0 items

  • Main business:

    Integrated prefabricated pump station, integrated pump station, integrated sewage lift pump station, buried fire water tank, buried fire pool, buried tank pump integration, sewage treatment equipment and environmental protection equipment

  • Address:

    No. 12, Jianxian Road, Jianhu County, Yancheng, Jiangsu

I want to join

 Personal WeChat