Henan Luoyang Integrated Prefabricated Pump Station FRP

 

Specific construction process of integrated sewage prefabricated pump station:

Move the pump station horizontally with the sling and the tank transport bracket to move the pump station to the ground. Note that at this time, it is forbidden to use lifting lugs, steel wire ropes or chains to lift the tank, and use slings to lift the tank from the horizontal position to the vertical position. When lifting vertically, use lifting lugs, and evenly distribute the weight to all lifting lugs. The pit bottom of the concrete base plate and the concrete base plate shall be flat without ponding. If necessary, pave a gravel layer and compact it with a tamper. If the foundation bearing capacity requirements cannot be met, such as quicksand, sludge and other geological conditions, corresponding foundation treatment measures must be taken, and the installation can only be carried out when the necessary foundation bearing capacity is reached. The concrete installation foundation is prefabricated, or poured directly at the bottom of the pit or poured directly on the compacted layer.

  

Clean the surface of the cement base plate when installing the cylinder to ensure that there is no dirt or other sundries between the installation surface and the bottom of the prefabricated pump station. Lift the pump body with a lifting hook and place it in the middle of the circumference of the anchor screw on the cement base plate. Be careful not to touch the pump body with the foundation screw, because the foundation screw is easy to damage the pump body surface.

  

about The prefabricated pump station with a diameter of 4 meters must accurately avoid the exposed reinforcement of the base plate, and stagger the reinforcement at the bottom of the prefabricated pump station according to the drawing requirements to avoid damaging the bottom structure. Check whether the pump station is vertical. When the cement base plate is placed horizontally, the pump station should be in a vertical position. Install the pressure plate and tighten the nuts. Check that the pipeline and bottom are not deformed, The conical bottom clearance must be filled with concrete

 

 

What is the advantage of sewage lift pump station?

 

The integrated sewage pump station is applicable to places that cannot rely on the gravity effect to discharge sewage by themselves. It collects waste water below the water level of the waterway through the sewage tank, as well as waste water discharged far away from the municipal sewage pipe network and sanitary equipment, and transmits the sewage to the sewage pipe network with the help of the sewage pump.

 

1. Short construction period: within two weeks, you can complete the procedures including excavation, backfilling, compaction, connection, leakage inspection, control system equipment, test run, final commissioning and everything.

 

2. Strong anti leakage function: the barrel is surrounded by the computer control shaft, with high integration of one-time molding, and anti leakage and crack.

 

3. Integrated planning: integrated planning shall be carried out for the components in the water of the pump station and the overall destructive ventilation system.

 

4. Analysis: Hydrodynamic planning is selected to actively clean to prevent blocking.

 

5. Strength analysis and inspection: each product shall be analyzed and inspected before delivery to ensure the reliability of the product.

 

6. Intelligent control system: there is no need for special personnel to be on duty, GPRS long-distance system, knowing the operation of the pump station at any time and anywhere. The equipment is also relatively simple, and its corrosion resistance is also very strong, which can effectively improve the service life during use, basically without daily protection, and the failure rate is very low

Disclaimer: Hangzhou Shangyi Information Technology Co., Ltd. does not declare or guarantee the correctness or reliability of all information published on CNBM Online; You hereby accept and acknowledge that you shall bear the risk arising from reliance on any information. Hangzhou Shangyi Information Technology Co., Ltd. has the right but not the obligation to improve or correct errors or omissions in any part of the information published.

Jiangsu Yuxuan Automation Equipment Co., Ltd

Building Materials General

five year

Certified
  • Enterprise type:

    Others

  • Business model:

    Production and processing

  • Honors and qualifications:

    0 items

  • Main business:

    Integrated prefabricated pump station, integrated pump station, integrated sewage lift pump station, buried fire water tank, buried fire pool, buried tank pump integration, sewage treatment equipment and environmental protection equipment

  • Address:

    No. 12, Jianxian Road, Jianhu County, Yancheng, Jiangsu

I want to join

 Personal WeChat