home page  >  News Center  >  Event promotion >Shandong Zhaoyuan Integrated Prefabricated Pump Station FRP

Shandong Zhaoyuan Integrated Prefabricated Pump Station FRP

2022/6/13 9:36:15 Source: Jiangsu Yuxuan Automation Equipment Co., Ltd Views: one hundred and twenty-five

Shandong Zhaoyuan Integrated Prefabricated Pump Station FRP

 

Next, Jiangsu Yuxuan will introduce how to use the integrated prefabricated pump station.

 

1. The scale of sewage pump station and the planning of sewage pump station shall be determined according to the amount of sewage in the near future. The cylinder specification of prefabricated pump station shall be selected according to the flow. The cylinder with the required diameter can meet the requirements.

 

2. In the separate drainage system, the rainwater pump room and sewage pump room can be built in different directions in the hospital, or can be built together in one structure, but the sewage pump, collecting tank and pipeline should be self-contained.

 

3. It should be clear whether the sewage pump station is built at one time or by stages, whether it is * * * or semi * *, so as to determine its specifications and equipment. After the sewage is raised by the pump station, the outlet water is returned to the river channel for treatment plant to select the direction of the sewage pump station.

 

4. When the collecting tank of the integrated prefabricated pump station and the machine room are in the same structure, the collecting tank and the machine room need to be separated by waterproof partition walls, no leakage is allowed, and the practice is in accordance with the requirements of the structural planning specification; A certain construction interval shall be maintained between the separated water collecting tank and the machine room to prevent uneven settlement. The water collecting tank is mostly circular and the machine room is mostly square.

 

5. Pay attention to reduce the impact on the surrounding environment, and make sure that the pump station is separated from residential houses and other public buildings according to the local conditions. The pump station yard must be beautified and a partition belt should be built around it.

 

 

In recent years, the industry field of installing and using this kind of equipment is also increasing, so now the application of integrated sewage pump equipment has attracted much attention. When installing products, it is also necessary to have a detailed understanding of the operation methods and processes, which can achieve better application results.

Then install the integrated sewage pump station What operation methods should be paid attention to? First of all, the installation location should be determined according to the environmental characteristics. The equipment should not affect the surrounding environment. At the same time, the installation space of the equipment should also be met, so that it can be more convenient when it is put into application, and both installation and maintenance are very convenient. Secondly, the selection of equipment should conform to the sewage treatment standard, so that sewage treatment can be carried out **Reasonable.

 

During the installation and use of the integrated sewage pump station, attention should also be paid to the regular inspection of the grid to avoid affecting the operation effect of the equipment due to the filament winding on the blade. If the blade is found to be seriously worn, it should also be replaced in a timely manner. When selecting equipment, attention should also be paid to that the motor selection of the integrated sewage pump equipment should meet the installation and use standards, Avoid problems such as failure caused by improper selection of motor.

 

When sewage treatment is carried out through the integrated sewage pump station, the gas detection process also needs to be completed through the exhaust system, so that the installation operation can be carried out only after the guarantee. When the equipment is found to have hidden trouble, the staff needs to repair and deal with it in time, so that the equipment can be restored to normal as soon as possible.

Disclaimer: Hangzhou Shangyi Information Technology Co., Ltd. does not declare or guarantee the correctness or reliability of all information published on CNBM Online; You hereby accept and acknowledge that you shall bear the risk arising from reliance on any information. Hangzhou Shangyi Information Technology Co., Ltd. has the right but not the obligation to improve or correct errors or omissions in any part of the information published.

Jiangsu Yuxuan Automation Equipment Co., Ltd

Building Materials General

five year

Certified
  • Enterprise type:

    Others

  • Business model:

    Production and processing

  • Honors and qualifications:

    0 items

  • Main business:

    Integrated prefabricated pump station, integrated pump station, integrated sewage lift pump station, buried fire water tank, buried fire pool, buried tank pump integration, sewage treatment equipment and environmental protection equipment

  • Address:

    No. 12, Jianxian Road, Jianhu County, Yancheng, Jiangsu

I want to join

 Personal WeChat