Architecture curtain Construction scheme of embedded parts
Many people will not master the construction scheme of the embedded parts of the building curtain wall project, which will cause various problems in the whole process of the project construction, and cause safety accidents during the second project construction and construction delay. Therefore, it is necessary to master the construction scheme of the embedded parts of the building curtain wall project, which is conducive to the smooth implementation of the project construction, The following is a brief and detailed introduction to the laying method of embedded parts:
Yingrui supplies embedded channel system, underground pipe gallery and channel galvanizing
(1) Before laying the embedded parts, technical disclosure shall be carried out first. It is very important to indicate the laying plan of the embedded parts at the corner, and fill in the Technical Disclosure form for filing.
(2) According to the construction plan and design elevation specification of the positioning point of the embedded parts transfer parts, and according to the column beam specification of the civil engineering, the laying control line of the embedded parts transfer parts shall be marked with red ink on the I-shaped steel according to the details. As shown in the figure:
(3) Before laying the embedded parts, when erecting the formwork for civil works, the separation shall be carried out, and the separation line of the embedded parts shall be snapped at the eaves outside the bottom formwork.
(4) According to the condition of embedded parts in the construction drawings of embedded parts, the embedded parts shall be numbered from the right side of the centerline, laid from 1 to several, and the embedded parts laying condition shall be filled in according to the embedded parts inspection form of the enterprise. Record the laying status from top to bottom, from top to bottom, from top to bottom, from front to back, from left to right, and fill in the Concealed Works Acceptance Report and attach the Checklist to the project supervision project for acceptance after laying the embedded parts.
![](https://img3.bmlink.com/big/supply/2019/9/12/11/637038846233119703.jpg)
![](https://img3.bmlink.com/big/supply/2019/9/12/11/637038846290683804.jpg)
![](https://img3.bmlink.com/big/supply/2019/9/12/11/637038846338575888.jpg)
![](https://img3.bmlink.com/big/supply/2019/9/12/11/637038846414860022.jpg)
![](https://img3.bmlink.com/big/supply/2019/9/12/11/637038846600344348.jpg)
![](https://img3.bmlink.com/big/supply/2019/9/12/11/637038833496387327.jpg)
![](https://img3.bmlink.com/big/supply/2019/9/12/11/637038833350059070.jpg)
![](https://img3.bmlink.com/big/supply/2019/9/11/9/637037921411363018.jpg)
![](https://img3.bmlink.com/big/supply/2019/9/12/11/637038835985839700.jpg)