Wall art paint Price of wallpaper Precautions for using luminous paint in paint quotation
Price of liquid wallpaper, price of wall art paint, quotation of wall art paint, joining of liquid wallpaper manufacturers, and Yimeijia liquid wallpaper (* * *)
The luminous paint is a kind of wall art paint. After absorbing ordinary visible light for 10 to 20 minutes, it can continue to shine for about 12 hours in the dark, and can expand the limited monotonous plane into a dreamy multi-dimensional space with strange light. The decoration effect is bright and colorful, which is a new generation of environmental protection Decorative coating 。 But when using luminous paint, we also need to pay attention to its precautions. Let's listen to the relevant people of Changsha Jinxiu Wall Art Material Company?
(1) Learn about glow in the dark coating The performance shall be constructed according to the specified method: for professional construction, it is recommended to spray one or two layers of polymer coating agent on the bottom layer and the finished paint film, so as to enhance the adhesion, weather resistance and paint surface life.
(2) Complete surface treatment : The proper surface treatment has a great impact on the performance and life of the paint film. Therefore, the rust, grease and other foreign matters must be completely removed and fully dried before brushing.
(3) The luminous paint shall be fully stirred: the luminous paint is a mixture of pigment, resin liquid and luminous powder. It may take a period of time from manufacture to use, and it is inevitable that there will be separation and precipitation of pigment or luminous powder. Therefore, it shall be fully stirred before use.
(4) The one-time brushing thickness should not be too thick: if the one-time brushing thickness is too thick, it is easy to cause bleeding, wrinkling and other phenomena. Therefore, proper control shall be carried out and multi-layer coating construction shall be carried out.
(5) When coating in layers, the construction shall be carried out after the lower layer of paint is completely dry: when coating in layers, when the following layers of paint film are not completely dry, it is easy to wrinkle or even soak the lower layer of paint and peel off. Therefore, the upper layer of paint can be applied only after the lower layer of paint is completely dry.
(6) Avoid construction in low temperature and humid climate: when the temperature drops below 5 ℃, the dryness of the paint will be reduced at the end. At the same time, when the humidity is above 85RH%, mist, light reduction, and even adhesion will be affected. Therefore, avoid construction in this situation.
(7) Try to remove dust: dust will not only affect the performance of the paint film, but also damage the appearance, so try to remove it as clean as possible.
(8) The joints such as angle iron screws should be coated: the joints, welding or screws of angle iron should be coated to make up for the difficulty of complete construction, and attention should be paid to avoiding the occurrence of missed coating and uneven painting.
(9) Note that the amount of thinner shall not be added with any drying agent: if the paint is too thick and thinner needs to be added, attention shall be paid to the amount of thinner, which shall not affect the hiding power and film thickness. Generally, it shall not exceed 5%. In addition, although the drying agent can promote the drying of the paint, the excessive drying agent can easily lead to the phenomenon that the surface is dry and the interior is not dry. At the same time, it can stay in the paint film after drying to continue to promote the aging of the paint film.
(10) Rapid drying: it can be heated and dried at 65 ℃± 5 ℃, and the drying time is about 6-10 minutes.
Contact: Manager Li
Tel: * * * (Southern Region)/* * * (Northern Region)
Fax:***
National free consultation contact information:***
Website 1: http://www.hunanqiangyiqi.com/
Website 2: http://www.ymj168.cn
Production address: Lituo Industrial Park, Changsha, Hunan Province
Address of image exhibition hall: No. 1, right of Nanhu Market, Yuanda Road, Changsha City, Hunan Province (diagonally opposite Zidongge Huatian Hotel near Changsha Railway Station)
Jinxiuqiangyi yes168yes