I The company focuses on the production of eucalyptus construction formwork In 2015, the company mainly produced small red boards, big red boards, large and small laminated boards, and buildings Batten Etc. The construction formwork has the characteristics of no warping, no deformation, no cracking, high strength, strong waterproof, etc. It can still meet the requirements for bonding strength after 120 minutes of boiling in boiling water. It is used 3-5 times more than ordinary wood formwork, and has a turnover of more than 10-15 times. It is a Luban engineering formwork.
Specification of building formwork:
Common specifications and dimensions: large board, small board
Process characteristics of building formwork:
1. Select eucalyptus trees from 5-7 years Log Its stammer is small and its toughness is good. The whole core veneer is selected in the rotary cutting;
2. High quality pine and eucalyptus full core primary core board is used for preforming board The layer is clear, the surface is flat, there is no hole in the middle of sawing, and the density is 680kg/m3.
3. The surface coating is highly waterproof phenolic resin Glue and core board are made of triamine glue (0.3KG for single layer gluing), which has strong gluing performance and can increase 2-3 times of turnover.
4. The building formwork is first cold pressed and then hot pressed. It is pressed twice. The formwork is well glued and structurally stable.
Features of building formwork:
It has the characteristics of flat surface, no deformation, light weight, high strength, and easy processing. Compared with traditional steel formwork, it has the characteristics of light weight, large range, and many turnover times. It is easy to demould, corrosion resistant, smooth surface, and does not pollute the concrete surface. It also solves the problems of steel formwork leakage and rough construction surface.
Product use:
Use: construction formwork for small high-rise buildings, bridges, tunnels, * * *, etc.
Processing cycle:
The common specifications of Zhongnan Shenjian construction formwork are usually advanced For orders in three days, an urgent order should be notified 1-2 days in advance. Generally, the factory will stock 10000 to 20000 templates of conventional specifications to meet the urgent needs of customers.