home page  >  Product supply  >  Hardware tools  >  General Hardware Fittings  >  Other general hardware accessories >Quality Assurance of Shanghai Tianbo Curtain Wall Factory Direct Selling Through Pipe Column
  •  Quality Assurance of Shanghai Tianbo Curtain Wall Factory Direct Selling Through Pipe Column
  •  Quality Assurance of Shanghai Tianbo Curtain Wall Factory Direct Selling Through Pipe Column
  •  Quality Assurance of Shanghai Tianbo Curtain Wall Factory Direct Selling Through Pipe Column
  •  Quality Assurance of Shanghai Tianbo Curtain Wall Factory Direct Selling Through Pipe Column
  •  Quality Assurance of Shanghai Tianbo Curtain Wall Factory Direct Selling Through Pipe Column
  •  Quality Assurance of Shanghai Tianbo Curtain Wall Factory Direct Selling Through Pipe Column
  •  Quality Assurance of Shanghai Tianbo Curtain Wall Factory Direct Selling Through Pipe Column
  •  Quality Assurance of Shanghai Tianbo Curtain Wall Factory Direct Selling Through Pipe Column
  •  Quality Assurance of Shanghai Tianbo Curtain Wall Factory Direct Selling Through Pipe Column
  •  Quality Assurance of Shanghai Tianbo Curtain Wall Factory Direct Selling Through Pipe Column

Quality Assurance of Shanghai Tianbo Curtain Wall Factory Direct Selling Through Pipe Column

Price

MOQ

98.00 yuan/piece

1 to 100

97.00 yuan/piece

More than 100

  • Minimum order quantity: 1
  • Location: Taizhou, Jiangsu
  • Price: electricity
  • Total supply: 10000
  • Delivery period: 3 days
  • Release time: 2017-11-22 14:21:39

Wang Rong: 86-0523-88962666 (Please tell me when you contact me“ Building materials network See the information, there will be a discount! Thank you!)

Warm reminder: Consumers are requested to take epidemic prevention measures for international packages. The goods need three licenses and one report for imported goods (supplier's license, entry quarantine certificate, preventive disinfection certificate and NCV nucleic acid test report)

Detailed description

  • Processing customization:

    yes

  • model:

    All models

  • Brand:

    Skywave

  • texture of material:

    three hundred and four

  • Scope of application:

    Large shopping mall column

The product features: high cost performance, convenient installation, elegant appearance, good stability, unique, practical, flexible can be customized according to customer requirements. stairs guardrail The installation position of is ideal.
Our factory has fast delivery, stable quality, excellent technology, and good social reputation, especially suitable for contacting with local enterprises pin Cooperate with project developers. Huibolong will become your successful award-winning partner.
Detailed description of stair column customization
1) Regular height of the product: the total height is 850MM, and different heights of 900MM, 1000MM, 1100MM,...... Can also be customized according to different needs.
2) Product material: 201 #, 304 # stainless steel, Pipe board Bars, according to your cost requirements, can be selected as you like, so as to spend less money to buy products with high cost performance.
3) Surface treatment: sanding, mirror light, electroplating titanium gold, electroplating green, red bronze, electrostatic spraying, baking paint, stainless steel surface spraying.
4) Product features: high cost performance, stable quality, excellent process, low cost, convenient installation, secure, unique and practical appearance, customized according to customer requirements,
5) Delivery time: In order to strengthen the customer's competitiveness in the market, we have a precise delivery date, fast delivery, 1-2 samples for delivery, 4-6 days for general columns, and a large number of special-shaped columns. The delivery time is discussed by telephone. Each product will be shipped in a shorter time with higher quality.
6) Accurate transportation: according to customers in different provinces, we will arrange special personnel to contact the special line freight company to arrange shipment, so as to achieve fast, accurate, less transit and faster arrival at the destination. As a result, you have won valuable installation time for your construction period;
7) Win win cooperation: welcome domestic and foreign property developers, builders, engineering decoration companies, engineering contractors, foreign trade companies, stair monopoly, to make drawings.
8) High quality service: The company has a special customer service management platform, which is responsible for logistics distribution, customer service and other businesses. We will ensure that we have a dynamic understanding of each customer from purchase to use. For some customers who will not install, we will have telephone guidance from experienced professionals, and one-on-one communication and learning.
Construction process of stair handrail installation:
1. Installation process flow:
Installation of embedded parts → setting out → installation of column → connection of handrail and column → polishing
2. Installation of embedded parts (post embedded parts)
The installation of railing embedded parts can only adopt the method of post embedded parts. The method is to use expansion bolts and steel plates to make the post connectors. First, set out on the civil base course to determine the position of the column fixing point, then drill holes on the ground with an impact drill, and then install the expansion bolts. The bolts should be of sufficient length. After the bolts are positioned, Tighten the bolt and weld the nut and screw to prevent the nut and steel plate from loosening. The above method is also adopted for the connection of handrail and wall face.
3. Setting out and positioning:
Due to the above construction of post embedded parts, there may be errors. Therefore, before the installation of the column, the setting out shall be carried out again to determine the accuracy of the position of the embedded plate and the welding pole. If there is any deviation, it shall be corrected in time. It shall be ensured that all stainless steel columns are located on steel plates and can be welded around.
4. Install column
The columns shall be installed horizontally and vertically. The columns on both sides shall be installed first, and the middle columns shall be installed based on the columns on both sides. Two main points shall be noted: 1. The height of columns shall be uniform; 2. The front, rear, left and right of the column shall be horizontal and vertical; When welding the column, two people should cooperate. One should hold the steel pipe to keep it vertical and not shake during welding. The other should weld around and meet the welding specifications.
5. Handrail and column connection
Before installation, the column shall be set out by stretching the line, and the groove shall be machined on its upper end according to the inclination angle of the site and the roundness of the handrail used. Then put the handrail directly into the column groove and install it by spot welding from one end to the other. The adjacent handrails are installed with accurate butt joints and tight joints. After the adjacent steel pipes are connected, the joints shall be welded with stainless steel electrodes. Before welding, the oil stain, burr, rust spot, etc. within the range of 30~50mm along each side of the weld must be removed.
6. Grinding and polishing
After all welding is completed, the weld shall be leveled and sanded with a portable grinder until no weld is visible. When polishing, use flannelette grinding wheel or felt for polishing, and use corresponding polishing paste at the same time, until it is basically consistent with the adjacent base metal, and no weld is visible

I want to comment

Negative comments such as slander, malicious attack, unsubstantiated and non positive energy will be deleted by the administrator. Your comments may be of high reference value to others.

Related comments

Well received
0%
Neutral comment
0%
negative comment
0%
/ Number of records: 98   home page previous page next page Last

Disclaimer: The information shown above is provided by the enterprise itself, and the authenticity, accuracy and legality of the content are the responsibility of the publishing enterprise. www.chinabuildingmaterials. com does not assume any guarantee responsibility for this. In order to protect your interests, we suggest you choose the building materials link member of China Building Materials Network. Friendly reminder: New and old users are requested to strengthen the screening of the authenticity of information and the identity and qualification of its publisher to avoid unnecessary disputes and losses!

I want to join

Online inquiry
  • Taizhou Tianbo Curtain Wall Components Co., Ltd

  • Quality Assurance of Shanghai Tianbo Curtain Wall Factory Direct Selling Through Pipe Column