Plastic manhole corrugated pipe install
1. Inspection well seat and The Conduit The connection and installation sequence shall start from the upstream section of the household connection pipe, install in the well pipe well sequence, and gradually extend to the downstream branch pipe.
2. Wellblock Connector The construction method of connection with pipeline shall be consistent with that of pipeline connection with the same type of joints.
3. When the outlet pipe interface is larger than the downstream pipe, the pipe connection shall be butt jointed at the inner bottom of the pipe. http://www.zbpeg.com/
4. For the installation of the saddle joint, a special tool shall be used to open holes on the shaft wall according to the shaft size and the diameter of the connecting pipe. The edges around the holes shall be flat, and the saddle joint shall not be installed on the reverse slope.
5. On the ground be launched When the pipeline (including inspection well) is installed (but the water filling test has not been carried out yet) during the construction in high position or rainy season, technical measures shall be taken to prevent the well body from floating up. http://www.sdpegj.com/