home page  >  News Center >Technical knowledge

technical knowledge

  • Application of Class A epoxy building structural adhesive of SBD (engineering application of epoxy rebar planting adhesive)

    1. Positioning: according to the design requirements, use the rebar detector (to avoid the rebar) to accurately determine the location of the drill hole. 2. Drilling: electric impact drill shall be used to drill holes at the determined location according to the design requirements (high level, hole diameter). In order to ensure that the role of anchored reinforcement can be fully played, the embedding and hole diameter of reinforcement shall be strictly in accordance with the design requirements. When drilling, the structure of the original concrete component shall not be damaged, and the original main reinforcement and other load-bearing reinforcement of the component shall not be cut. The hole wall after hole forming must be intact without cracks, honeycombs or holes. (If the hole does not coincide with the position of component reinforcement, the hole for expansion bolt shall be arranged according to the design drawing; if the hole and component

    2019/11/14 13:52:48
1/1 Total 1 message   home page previous page one next page Last

News classification

Spida (Dalian) New Material Technology Co., Ltd

Ordinary members
Certified
  • Enterprise type:

    Building materials enterprises

  • Business model:

    Production and processing

  • Honors and qualifications:

    0 items

  • Main business:

    Carbon fiber cloth, rebar planting glue, bonding steel glue, carbon fiber impregnating glue, steel grouting glue, injection type rebar planting glue, high non shrinkage grouting material, static crushing agent

  • Address:

    Shahekou District, Dalian, Liaoning

I want to join