home page  >  Product supply  >  Fine chemical industry  >  paint  >  Waterproof paint >Yulin Waterproof and Leakage Stopping Company, leakage repair unit, expansion joint of sewage pool, and leakage stoppage of sewage pool are good
  •  Yulin Waterproof and Leakage Stopping Company, leakage repair unit, expansion joint of sewage pool, and leakage stoppage of sewage pool are good
  •  Yulin Waterproof and Leakage Stopping Company, leakage repair unit, expansion joint of sewage pool, and leakage stoppage of sewage pool are good
  •  Yulin Waterproof and Leakage Stopping Company, leakage repair unit, expansion joint of sewage pool, and leakage stoppage of sewage pool are good
  •  Yulin Waterproof and Leakage Stopping Company, leakage repair unit, expansion joint of sewage pool, and leakage stoppage of sewage pool are good
  •  Yulin Waterproof and Leakage Stopping Company, leakage repair unit, expansion joint of sewage pool, and leakage stoppage of sewage pool are good
  •  Yulin Waterproof and Leakage Stopping Company, leakage repair unit, expansion joint of sewage pool, and leakage stoppage of sewage pool are good
  •  Yulin Waterproof and Leakage Stopping Company, leakage repair unit, expansion joint of sewage pool, and leakage stoppage of sewage pool are good
  •  Yulin Waterproof and Leakage Stopping Company, leakage repair unit, expansion joint of sewage pool, and leakage stoppage of sewage pool are good
  •  Yulin Waterproof and Leakage Stopping Company, leakage repair unit, expansion joint of sewage pool, and leakage stoppage of sewage pool are good
  •  Yulin Waterproof and Leakage Stopping Company, leakage repair unit, expansion joint of sewage pool, and leakage stoppage of sewage pool are good

Yulin Waterproof and Leakage Stopping Company, leakage repair unit, expansion joint of sewage pool, and leakage stoppage of sewage pool are good

Price

MOQ

420.00 yuan/box

1 box

  • Minimum order quantity: 10 cases
  • Location: Yancheng, Jiangsu
  • Price: electricity
  • Total supply: 1000 cases
  • Delivery period: 2 days
  • Release time: 2024-09-20 07:29:39

(When contacting me, please specify that the Building materials network See, there will be a discount! Thank you!)

Warm reminder: Consumers are requested to take epidemic prevention measures for international packages. The goods need three licenses and one report for imported goods (supplier's license, entry quarantine certificate, preventive disinfection certificate and NCV nucleic acid test report)

Detailed description

  • Color:

    gules

  • Brand:

    Yulin Waterproof and Leakage Stopping Company

  • Glossiness:

    one

  • Acid resistance:

    one

  • Constructability:

    one hundred

  • Maximum drying time:

    99 hours

  • Minimum total solids content:

    one hundred and twenty-three

  • Painting area per kg (twice):

    1000 ㎡

  • Net weight of single piece:

    1 kg

  • quality guarantee period:

    100 months

  • Purpose:

    one

  • Package specification:

    012

Yulin Waterproof and Plugging Company, leak repair unit, sewage tank expansion joint Leakage repair and plugging of sewage tank are better. The advantages of chemical grouting waterproof plugging construction of sewage treatment tank and chemical grouting waterproof plugging construction of sewage treatment tank

1. The pressure is high, stable and reliable, so that the chemical grout can completely enter the deep micro cracks of the concrete structure, and the water stop effect is good.
2. The grouting fluid technology is mature, and the variety is complete. Basically, it has realized the production of single component finished products. There is no need to mix on site, and the quality is stable. It can be used after opening the barrel. The slurry is resistant to chemical corrosion, * * *, environmentally friendly and waterproof after curing.
3. The construction process is simple and easy. The construction speed is fast, and the water stop effect is immediate, once and for all. The labor intensity of workers is small, and the construction efficiency is 5~10 times that of traditional construction methods, which are incomparable.
4. The construction is not restricted by season and weather, and can be used for various projects, including maintenance, emergency repair and drinking water projects. The comprehensive construction cost is low and the economic benefit is remarkable.
5、 Construction technology of chemical grouting for waterproof and leak stopping
High pressure chemical grouting plugging construction shall be carried out by the construction team with * * * trained personnel and * * * construction equipment.
1 Cleaning: carefully check and analyze the leakage, and determine the position and spacing of grouting holes. Clean the area to be constructed, chisel away the precipitates on the concrete surface, and ensure that the surface is clean and wet.
two drill hole : Using Electric hammer Such drilling tools shall be used to drill along both sides of the crack. The diameter of the drill bit is 14mm, the drilling angle should be ≤ 45 °, and the drilling * * * ≤ 2/3 of the structure thickness. The drilling must pass through the crack. However, it is not allowed to pierce the structure (except for the grouting behind the wall), and the spacing between the hole and the crack should be ≤ 1/2 of the structure thickness. The drilling spacing is 20cm~60cm
3 Buried nozzle: install grouting nozzle (also called water stop needle) in the drilled hole, and use*** inner hexagon spanner Tighten so that there is no gap and no water leakage between the grouting nozzle and the drilling hole.
4. Seam washing: high pressure Cleaning machine Inject clean water into the grouting nozzle at a pressure of 6 mpa, observe the water outlet, and clean the dust in the seam.
5 Joint sealing: seal the surface of the crack with quick drying cement when water seepage occurs during joint cleaning, so as to prevent the grout from running out during chemical grouting.
6 Grouting: use high-pressure grouting machine to inject chemical grouting materials into the grouting hole. The elevation grouting sequence is from bottom to top; The plane can be started from one end, and the single hole can be continuous one by one. When the adjacent holes begin to discharge grout, maintain the pressure for 3~5 minutes, then stop grouting of this hole and change grouting of adjacent grouting holes.
7 Nozzle removal: after grouting, the exposed grouting nozzle can be removed or knocked out after confirming no leakage. Clean up the solidified spilled grouting fluid.
8 Sealing: repair and seal the grouting opening with quick drying cement.
9 Waterproof: the chemical grouting part shall be coated with polyurethane waterproof material for three times (primer, intermediate and surface coating) for surface waterproof treatment.
  •  Yancheng Zhiruixiang Waterproof and Leak Stopping Engineering Co., Ltd

    Yancheng Zhiruixiang Waterproof and Leak Stopping Engineering Co., Ltd

I want to comment

Negative comments such as slander, malicious attack, unsubstantiated and non positive energy will be deleted by the administrator. Your comments may be of high reference value to others.

Related comments

Well received
0%
Neutral comment
0%
negative comment
0%
    / Number of records: 98   home page previous page next page Last

    Disclaimer: The information shown above is provided by the enterprise itself, and the authenticity, accuracy and legality of the content are the responsibility of the publishing enterprise. www.chinabuildingmaterials. com does not assume any guarantee responsibility for this. In order to protect your interests, we suggest you choose the building materials link member of China Building Materials Network. Friendly reminder: New and old users are requested to strengthen the screening of the authenticity of information and the identity and qualification of its publisher to avoid unnecessary disputes and losses!

    Risk warning: Entrepreneurship is risky and investment should be cautious. Fight against investment fraud and create a platform of integrity. Right protection report: 400-88-59137.

    Yancheng Zhiruixiang Waterproof Engineering Co., Ltd

    Building Materials General

    nine year

    Certified
    • Enterprise type:

      Construction enterprises

    • Business model:

      Production and processing

    • Honors and qualifications:

      1 item

    • Main business:

      Waterproof and leak stoppage, water channel leak stoppage of hydropower station, water pool expansion joint leak stoppage, sewage pool leak stoppage, underground garage leak stoppage, sewage pipeline leak stoppage, basement leak stoppage, hydropower station basement leak stoppage

    • Address:

      Tinghu District, Yancheng, Jiangsu

    I want to join

    Online inquiry
    • Yancheng Zhiruixiang Waterproof Engineering Co., Ltd

    • Yulin Waterproof and Leakage Stopping Company, leakage repair unit, expansion joint of sewage pool, and leakage stoppage of sewage pool are good