home page  >  Product supply  >  mechanical equipment  >  Earth moving machinery  >  grader >Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company
  •  Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company
  •  Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company
  •  Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company
  •  Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company
  •  Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company
  •  Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company
  •  Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company
  •  Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company
  •  Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company
  •  Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company

Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company

Price

MOQ

660.00 yuan/set

1 set

  • Minimum order quantity: 10 sets
  • Location: Yancheng, Jiangsu
  • Price: electricity
  • Total supply: 1000 sets
  • Delivery period: 2 days
  • Release time: 2024-06-20 00:00:07

(When contacting me, please specify that the Building materials network See, there will be a discount! Thank you!)

Warm reminder: Consumers are requested to take epidemic prevention measures for international packages. The goods need three licenses and one report for imported goods (supplier's license, entry quarantine certificate, preventive disinfection certificate and NCV nucleic acid test report)

Detailed description

  • Brand:

    XCMG

  • model:

    one

  • Scope of application:

    currency

  • Travel mode:

    Crawler type

  • Transmission mode:

    hydraulic pressure

  • Pushing bucket capacity:

    100 m3

  • Blade width:

    99 mm

  • Engine power:

    123 kw

Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company, concrete The Conduit Leakage repair
Our company is dedicated to providing you with quality service! Welcome to Waterproof and Leak Stopping Company of Hydropower Station

The company has national offices: East China, South China, Central China
North China and Northwest China
It can meet the needs of your company. You can arrive at the site on the day of receiving the call and provide a satisfactory construction scheme and product quotation.
We are willing to cooperate happily with your company, which is beneficial to win-win!
According to the actual situation of the project, the company undertook to carry out waterproof grouting and plugging for the leakage part of the bottom plate of the sewage pool, then carried out the flexible waterproof layer, and then carried out the construction of the flexible and rigid waterproof protective layer for rapid plugging again.
The waterproof and leakage blocking scheme of rigid protection and flexible waterproof is based on the requirements of the National Technical Code for Waterproofing of Underground Works.
1、 The construction procedures for waterproofing, plugging and structural reinforcement are as follows:
1、
First Construction joint A 70 mm deep and 60 mm wide "V" shaped joint shall be chiseled at the position and washed clean with water.
2. Fixed grouting channel and grouting pipe
Fix the PE foam strip of the grouting channel with the quick plugging spirit. When fixing the PE foam strip, bury a grouting pipe every 50cm or so. The grouting pipe is made of 10~13mm pressure resistant rubber Hose , the pipe has been used as a guide Water pipe It is also used as grouting pipe.
3. Grouting leak stopping and water stopping and polysulfide flexible sealing waterproof construction
Start to inject * * * grouting material from one side - grouting plugging king, the grouting pressure is controlled between 0.3~0.5MPa, and the grouting can be stopped and closed when the hole next to the grouting emits grout valve Then grout from another hole to stop leakage, and then proceed in sequence. After all grouting is completed, observe whether there is leakage. If there is still leakage in some places, supplement grouting from the nearest hole until there is no leakage. PG321 two-component polysulfide sealant shall be applied after pipe cutting.
4. Construction of rigid protective layer
After waterproof plugging grouting, the cracks will not leak again,
The rigid waterproof protective layer shall be made with the quick plugging spirit
2、 Large area leakage treatment scheme;
1. Surface layer method: applicable to the treatment of large-area leakage of structures. Generally, the treatment of large area leakage water in the basement cannot be carried out on the upstream surface, but only on the downstream surface. Therefore, before construction, water diversion and drainage should be carried out to prevent the newly made waterproof surface from being damaged by pressurized water. The specific method of surface layer method is: select the location with concentrated leakage, open holes and bury pipes to make water flow out of the conduit. According to the amount of water leakage, pipes can be buried at one or more places for water diversion. If no leakage point can be found, pipes can be buried at the lower part of the wall for water diversion. Then, according to the material use requirements, large areas of polymer cement waterproof mortar shall be coated on the watertight parts, which shall be plastered and compacted in layers, in the order of waterproof plain mortar - waterproof mortar - waterproof plain mortar, and then the pipe shall be pulled to block water. For slight water seepage of the concrete, the compressive plugging spirit can be applied to the concrete surface, and the scraper can be used for construction. Generally, the construction shall be conducted for 2-3 times until no water shadow is seen. For holes and gaps with obvious water leakage, water stop treatment shall be carried out one by one according to the method of hole and crack leakage water treatment.
For the surface of the concrete structure of the basement, when there is not serious slow leakage with small water pressure (such as sweating, wetting, etc.), anti leakage grams can be applied on the back surface to form an impermeable cover layer on the surface to play the role of seepage prevention. The specific method is as follows: the surface of the base course shall be treated flat and smooth, the uneven parts shall be filled with cement mortar, flattened and trowelled, and the dust and oil stain on the surface of the base course shall be removed at the same time, so as to facilitate the bonding of the waterproof layer. After the above work is completed and inspected as qualified, the anti leakage gram can be used for construction.
2. Grouting method: grouting method can also be used in case of large area leakage in the basement. According to the leakage situation, grouting holes can be arranged on the structure, and the points can be arranged in plum blossom shape, shape or straight shape, and then grouting treatment can be carried out to form a waterproof curtain inside the structure. In addition, the method of "surface sealing grouting" can also be used, that is, first lower the pipe for water diversion, and then use the quick plugging spirit to plaster a large area. After the strength of the waterproof coating meets the requirements, grout from the water diversion pipe for water plugging.
Leakage water repair company for underground powerhouse of hydropower station
  •  Yancheng Zhiruixiang Waterproof and Leak Stopping Engineering Co., Ltd

    Yancheng Zhiruixiang Waterproof and Leak Stopping Engineering Co., Ltd

I want to comment

Negative comments such as slander, malicious attack, unsubstantiated and non positive energy will be deleted by the administrator. Your comments may be of high reference value to others.

Related comments

Well received
0%
Neutral comment
0%
negative comment
0%
    / Number of records: 98   home page previous page next page Last

    Disclaimer: The information shown above is provided by the enterprise itself, and the authenticity, accuracy and legality of the content are the responsibility of the publishing enterprise. www.chinabuildingmaterials. com does not assume any guarantee responsibility for this. In order to protect your interests, we suggest you choose the building materials link member of China Building Materials Network. Friendly reminder: New and old users are requested to strengthen the screening of the authenticity of information and the identity and qualification of its publisher to avoid unnecessary disputes and losses!

    Risk warning: Entrepreneurship is risky and investment should be cautious. Fight against investment fraud and create a platform of integrity. Right protection report: 400-88-59137.

    Yancheng Zhiruixiang Waterproof Engineering Co., Ltd

    Building Materials General

    nine year

    Certified
    • Enterprise type:

      Construction enterprises

    • Business model:

      Production and processing

    • Honors and qualifications:

      1 item

    • Main business:

      Waterproof and leak stoppage, water channel leak stoppage of hydropower station, water pool expansion joint leak stoppage, sewage pool leak stoppage, underground garage leak stoppage, sewage pipeline leak stoppage, basement leak stoppage, hydropower station basement leak stoppage

    • Address:

      Tinghu District, Yancheng, Jiangsu

    I want to join

    Online inquiry
    • Yancheng Zhiruixiang Waterproof Engineering Co., Ltd

    • Anlong County Underground Civil Air Defense Leakage Stopping Company, Metro Station Leakage Stopping Company