Antistatic floor construction plan
1. Floor treatment: clean up the garbage, dust, mud and other things on the ground. If the ground is concave or convex
Objects must be filled or removed to keep the ground flat. The construction quality is better.
2. Material estimation: measure the site, estimate the raised floor Bracket The quantity of installation items (including consumables).
3. Feed: after the quantity is determined, feed in order
4. Selected benchmark: determine the construction benchmark and construct according to the direction of the foundation point.
5. Laying the base and floor: lay the base and floor in order according to the direction of the base point.
6. Edge trimming: when encountering the wall column When the whole piece cannot be placed, it can be cut for edge trimming.
7. Opening: the construction personnel shall open holes according to the specified requirements and quantity.
8. Adjustment: After the construction of the whole project is completed, the construction personnel will re-examine it. In case of any inconformity, adjust the floor according to the state until it meets the specified requirements. At the same time, protect the finished products to avoid surface damage.
![](https://img2.bmlink.com/big/supply/2016/4/29/13/72743634913463.jpg)
![](https://img2.bmlink.com/big/supply/2016/4/7/15/516074739636888.jpg)
For more information, link: http://www.linderna-gz.com
Welcome to inquire about:***
***(Mr. Lu)
QQ:1194336014