home page  >  Product supply  >  Special building materials  >  Special building materials >Supplying Ximeng high non shrink grout manufacturer
  •  Supplying Ximeng high non shrink grout manufacturer
  •  Supplying Ximeng high non shrink grout manufacturer
  •  Supplying Ximeng high non shrink grout manufacturer
  •  Supplying Ximeng high non shrink grout manufacturer
  •  Supplying Ximeng high non shrink grout manufacturer
  •  Supplying Ximeng high non shrink grout manufacturer
  •  Supplying Ximeng high non shrink grout manufacturer
  •  Supplying Ximeng high non shrink grout manufacturer
  •  Supplying Ximeng high non shrink grout manufacturer
  •  Supplying Ximeng high non shrink grout manufacturer

Supplying Ximeng high non shrink grout manufacturer

Price

Electric discussion

  • Minimum order quantity: 1 ton
  • Location: Beijing
  • Price: electricity
  • Total supply: 55555 tons
  • Delivery period: 1 day
  • Release time: 2024-06-23 00:02:48

(When contacting me, please specify that the Building materials network See, there will be a discount! Thank you!)

Warm reminder: Consumers are requested to take epidemic prevention measures for international packages. The goods need three licenses and one report for imported goods (supplier's license, entry quarantine certificate, preventive disinfection certificate and NCV nucleic acid test report)

Detailed description

  • Place of Origin:

    Beijing

  • Brand:

    Ruishengte

  • Function:

    Secondary grouting

  • texture of material:

    other

  • Scope of application:

    Secondary grouting for equipment installation

  • Specifications:

    40kg

Offer for supplying Ximeng high non shrink grouting material manufacturer to sell in batches

Supply Tongliao grouting material Ximeng high non shrinkage grouting material

Detailed introduction of high non shrinkage grouting material

Reinforced grouting material

Beanstone grouting material

Ultra fine grouting material

Super early strength grouting material

Tel of grouting material sales center*********


Characteristics of high non shrinkage grouting material

1. Early strength, height

1-day compressive strength ≥ 20Mpa; 3-day compressive strength ≥ 30Mpa; 28 day compressive strength ≥ 55Mpa.

2. Micro expansibility

Ensure close contact between equipment and foundation, and no shrinkage after secondary grouting.

3. High artesian property

All gaps can be filled to meet the requirements of secondary grouting of equipment.

4. Strong durability

After millions of fatigue tests and 50 freeze-thaw cycles, the strength has no obvious change. After immersion in engine oil for 30 days, the strength increases significantly.

5. Can be constructed in winter

Outdoor construction is allowed at - 10 ℃.



Use of high non shrink grout

1. It is used for secondary grouting of equipment foundation. 2. It is used for anchor bolt anchoring and rebar embedding.

3. It is used for strengthening and repairing concrete structures. 4. It is used for strengthening the beam column section.

Executive standard GB/T50448-2008

technical parameter

project

model

Compressive strength [Mpa]

Vertical expansion rate [%]

Mobility [mm]

Slump

【mm】

Bond strength of reinforcement

【Mpa】

1d

3d

28d

Round steel

Screw thread steel

Universal reinforced type

20—35

40—55

55--75

≥0.02

≥270

------

≥6

≥13

Beanstone reinforcement type

20—35

40—55

55—75

≥0.02

------

≥270

≥6

≥13

Superfluid reinforced type

15—30

25--45

55--65

≥0.02

≥270

------

≥6

≥13

---------

4h

1d

28d

------

------

------

------

------

Urgent reinforcement type

≥15

20--45

55—75

≥0.02

≥270

------

------

------

Note: 1. Compressive strength shall be in accordance with GB177-85 Test Method for Strength of Cement Mortar; The expansion rate shall be in accordance with GB119-88 Technical Specification for Application of Concrete Admixtures.

2. The reference consumption is calculated on the basis of (2.28-2.4) tons/m3, and the actual consumption is calculated.

High non shrinkage grouting material Selection basis

Product model

Grouting thickness δ

Universal reinforced type

Beanstone reinforcement type

Superfluid reinforced type

Urgent reinforcement type

30mm≤δ

Optional

Not selected

Preferred

Optional

30mm<δ<150mm

Preferred

Optional

Optional

Optional

δ≥150mm

Optional

Preferred

Optional

Optional

Preparation before construction

1. Machine mixing: concrete mixer or mortar mixer. 2. Manual mixing: several mixing tanks and shovels.

3. Several buckets. 4. Several platform scales.

5. Mixing tank. 6. High level funnel, grouting pipe and pipe joint.

7. Grouting booster. 8. Formwork (steel formwork, wood formwork).

9. Straw bags, rock wool quilts, etc. 10. Cotton yarn and adhesive tape.

Grouting construction

Step forward: basic processing

1. The foundation surface shall be roughened, or the concrete interface agent WJ-302 shall be specially used for interface treatment.

2. Clean the foundation surface without debris such as gravel, laitance, floating ash, oil stain and release agent.

3. The foundation surface shall be fully wetted 24 hours before grouting, and the accumulated water shall be removed 1 hour before grouting.

Step 2: Formwork erection

1. The formwork shall be erected according to the grouting construction drawing. The joints between formwork and foundation, formwork and formwork shall be sealed with cement slurry (leak stopping agent), adhesive tape, etc. to make the whole formwork watertight.

2. The horizontal distance between the formwork and the equipment base shall be controlled at about 100mm to facilitate the grouting construction.

3. The top elevation of the formwork shall be 50mm higher than the upper surface of the equipment base.

4. In case of grout leakage during grouting, it shall be handled in time.

Step 3: grouting material preparation

1. Generally, 14-15% water is added for general reinforcement type, and 10-11% water is added for pisolite reinforcement type.

2. Mechanical mixing is recommended, and the mixing time is generally 1-2min (manual electric drill mixer is strictly prohibited). When manual mixing is adopted, 2/3 of the water consumption shall be added for mixing for 2min, and then the remaining water shall be added for mixing until uniform.

3. The amount of each mixing shall be determined according to the amount used, so as to ensure that the materials are used up within 40 minutes.

4. During field use, it is strictly prohibited to add any admixtures or admixtures into the grouting materials.

Step 4: grouting construction method

1. Long equipment or track foundation shall be constructed in sections.

2. Several common grouting methods are shown as follows:

 twenty trillion and one hundred and twenty-eight billion three hundred and ten million two hundred and fifty-nine thousand eight hundred and sixty-three



3. During secondary grouting, the following requirements shall be met.

① During secondary grouting, grouting shall be carried out from multiple points on one side or both adjacent sides until overflow from the other side, so as to facilitate air exhaust during grouting. Grouting shall not be carried out simultaneously from four sides.

② After grouting, it must be carried out continuously without interruption. And shorten the grouting time as much as possible.

③ Vibration is strictly prohibited during grouting. When necessary, the grouting booster can be used to push the grouting material along the bottom of the grouting layer. It is strictly prohibited to push the grouting material from the middle and middle of the grouting layer to ensure the homogeneity of the grouting layer.

④ After the equipment foundation grouting is completed, a 45 degree bevel shall be cut outward along the edge of the equipment 3-6h after grouting to prevent cracks at the free end. If it is impossible to cut the edge, the surface of the grouting layer shall be polished with a trowel 3-6h after grouting.

⑤ When the thickness of the grouting layer exceeds 150mm, pea gravel reinforced high non shrinkage grouting material shall be used.

⑥ When the amount of equipment foundation grouting is large, mechanical mixing shall be used for the mixing of pea gravel reinforced grouting material to ensure grouting construction.

Step 5: Maintenance

1. The wet grass or rock wool quilt shall be immediately covered and kept wet within 30 minutes after grouting.

2. During winter construction, the maintenance measures shall also comply with the relevant provisions of the current<>(GB50204).

3. The equipment can be installed after the grouting material reaches the time of membrane removal. For the specific time, please refer to the "Relationship between membrane removal and curing time and ambient temperature".

Daily lower temperature [℃]

Formwork removal time [h]

Curing time [d]

-10----0

ninety-six

twenty-four

0----5

seventy-two

ten

5----15

forty-eight

seven

≥15

twenty-four

seven

4. After grouting of equipment foundation, if there is any part to be removed, it can be gently removed with trowel or shovel tools 3-6h after grouting, that is, before the grouting layer hardens.

5. The vibration of the running machine shall not be transmitted to the equipment foundation, and the machine shall be shut down for 24-36h after secondary grouting to avoid damaging the unhardened grouting layer.

Packaging, storage and transportation

1. Package specification: 40kg ± 1kg/bag, stored in a ventilated and dry place and protected from direct sunlight, with a shelf life of 6 months. If the shelf life is exceeded, it can only be used after re inspection.

2. It does not contain benzene series, halogenated hydrocarbon, formaldehyde, heavy metal and other components, and is harmless, tasteless, pure, non combustible and non explosive. It can be transported as general goods.

  •  Business license

    Business license

I want to comment

Negative comments such as slander, malicious attack, unsubstantiated and non positive energy will be deleted by the administrator. Your comments may be of high reference value to others.

Related comments

Well received
0%
Neutral comment
0%
negative comment
0%
    / Number of records: 98   home page previous page next page Last

    Disclaimer: The information shown above is provided by the enterprise itself, and the authenticity, accuracy and legality of the content are the responsibility of the publishing enterprise. www.chinabuildingmaterials. com does not assume any guarantee responsibility for this. In order to protect your interests, we suggest you choose the building materials link member of China Building Materials Network. Friendly reminder: New and old users are requested to strengthen the screening of the authenticity of information and the identity and qualification of its publisher to avoid unnecessary disputes and losses!

    Risk warning: Entrepreneurship is risky and investment should be cautious. Fight against investment fraud and create a platform of integrity. Right protection report: 400-88-59137.

    Supply Classification

    Beijing Ruishengte Building Materials Co., Ltd

    Building Materials General

    nine year

    Certified
    • Enterprise type:

      Building materials enterprises

    • Business model:

      Production and processing

    • Honors and qualifications:

      1 item

    • Main business:

      Organic silicon water repellent, rebar rust inhibitor, concrete pavement repair agent, road and bridge waterproof coating, impermeable microcrystalline waterproof agent

    • Address:

      200 Baisha Road, Changping District, Beijing

    I want to join

    Online inquiry
    • Beijing Ruishengte Building Materials Co., Ltd

    • Supplying Ximeng high non shrink grout manufacturer